The engineering of the PEB Building is complete and the drawings and design of the Tower Foundation and Control Room Building are in progress. Foundation bolts for the PEB Building are being transported to the site and inspection of SF6 to Air Bushing has been finished. Inspections of CTs and Surge Arrestors will take place next week in Korea and Germany, and the OGA of the GIS Building has been finalized.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
40 views
Status of Engineering /inspection
The engineering of the PEB Building is complete and the drawings and design of the Tower Foundation and Control Room Building are in progress. Foundation bolts for the PEB Building are being transported to the site and inspection of SF6 to Air Bushing has been finished. Inspections of CTs and Surge Arrestors will take place next week in Korea and Germany, and the OGA of the GIS Building has been finalized.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Status of Engineering /Inspection
PEB Building engineering Completed.
Drawing & Design Tower Foundation & Control room Building Foundation Bolts of PEB Building under transportation to site. Inspection of SF6 to Air Bushing has been completed. Inspections of CTs & Surge Arrestor are going to be held in next week in Korea & Germany. OGA of GIS Building has been finalised.