Liquefaction Analysis: EXAMPLE 1, Mud Bay Utilities, SPT Data

This document summarizes a liquefaction analysis for a site in Mud Bay Utilities based on SPT data from soil boring B-1. The boring encountered loose brown sand with silt and gravel near the surface, underlain by silty clay from 6-10 feet, silty sand from 10-14 feet, and medium sand from 14-20 feet. The analysis found the soil from 0-6 feet is susceptible to liquefaction during a magnitude 6 earthquake with 0.25g peak ground acceleration, with an estimated settlement of 88.49 cm.

Uploaded by

Franco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Liquefaction Analysis: EXAMPLE 1, Mud Bay Utilities, SPT Data

This document summarizes a liquefaction analysis for a site in Mud Bay Utilities based on SPT data from soil boring B-1. The boring encountered loose brown sand with silt and gravel near the surface, underlain by silty clay from 6-10 feet, silty sand from 10-14 feet, and medium sand from 14-20 feet. The analysis found the soil from 0-6 feet is susceptible to liquefaction during a magnitude 6 earthquake with 0.25g peak ground acceleration, with an estimated settlement of 88.49 cm.

Uploaded by

Franco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LIQUEFACTION ANALYSIS

EXAMPLE 1, Mud Bay Utilities, SPT Data


Hole No.=B-1

(m)
0

Water Depth=5 m

Soil Description

Brown fine to medium SAND with some silt


and gravel (very loose)

Surface Elev.=234.5
Raw Unit Fines Shear Stress Ratio
SPT Weight % 0
4 120 8

Magnitude=6
Acceleration=0.25g
0.5

Factor of Safety
0 1
5

Settlement
0 (cm)

100

105 35

90

56

98

water encountered
6

Brown silty clay


10

12

Gray silty SAND

14

12 105
16

18

Gray medium SAND


14

20

22

Gray SILT

24

14 80

25

LiquefyPro

CivilTech Software USA

www.civiltech.com

26

increasing silt
28

18

30

32

34

Boring completed at 35 feet on 3/5/1999

24 112

36

38
fs=1
fs=1.20
40

CivilTech Corporation

20

CRR
CSR
Shaded Zone has Liquefaction Potential

AT98564 Mud Bay Utilities

Wet
Dry
S = 88.49 cm

Plate A-1