The document outlines a work breakdown structure (WBS) for the construction of a one-storey school building with 28 activities labeled A through Z and a through m. The activities include site preparation like mobilization, clearing and layout. It also includes the construction of the warehouse like excavation, fabrication and installation of forms and rebars, pouring of concrete for footings, columns, beams, slabs. Other activities involve electrical and plumbing works, installation of doors, windows, tiles and painting. The document also provides the expected duration of each activity in days.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

CPM

The document outlines a work breakdown structure (WBS) for the construction of a one-storey school building with 28 activities labeled A through Z and a through m. The activities include site preparation like mobilization, clearing and layout. It also includes the construction of the warehouse like excavation, fabrication and installation of forms and rebars, pouring of concrete for footings, columns, beams, slabs. Other activities involve electrical and plumbing works, installation of doors, windows, tiles and painting. The document also provides the expected duration of each activity in days.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CODE

A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
a
b
c
d
e
f
g
h
i
j
k
l
m
n

ACTIVITY
Mobilization
Clearing
Site layout
Warehouse Construction
Excavation for footing and wall footing
Fabrication of rebars for footing and wall footing
Installation of forms and rebars for footing and
wall footing
Pouring of concrete for footing
Pouring of concrete for wall footing
Fabrication of forms and rebars for column
Installation of forms nad rebars for columns
Pouring of concrete for columns
Fabrication of forms and rebars for roof beam
Erection of CHB
Installation of rebars and forms for roof beam
Fabrication of roof truss, purlins and roof sheets
Pouring of concrete for roof beams
Installation of roof truss, purlins and roof sheets
Floor slab filling and backfilling
Fabrication of rebars for floor slab
Soil tampering
Installation of rebars for floor slab
Pouring of concrete for floor slab
Fabrication of plumbing and electrical rough ins
Installation of plumbing and electrical fixtures
Installation of doors and windows
Excavation of septic tank
Installation of ceiling joints
Fabrication of rebars for footing (septic tank)
Installation of rebars and forms (septic tank)
Fabrication of rebars for floor slab (septic tank)
Pouring of concrete for footing and wall footing
(septic tank)
Erection of CHB (septic tank)
Plastering of wall (septic tank)
Pouring of concrete for floor slab (septic tank)
Wall plastering
Installation of tiles
Painting of walls
Cleaning
Turnover

DURATION
1
2
2
4
4
4
3
4
4
4
7
4
4
4
4
3
4
3
4
3
4
2
2
4
2
2
2
2
2
5
2
2
1
3
6
6
5
1
1
1

Western Mindanao State University


College of Engineering and Technology
Department of Civil Engineering

ASSIGNMENT
in
CPM
(Construction of one-storey school
building)

Submitted to :
Dr. Vincent R. Geonzon
Professor

Submitted by :
Filcres Anthony Polinar
Jayson Plania
Jerwin Cuanan
King Patrick Manlangit
Leofel Pantoja

BSCE 4B
ACTIVITY
CODE DURATIO
N

A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
a
b
c
d
e
f
g
h
i
j
k
l
m

1
2
2
4
4
4
3
4
4
4
7
4
4
4
4
3
4
3
4
3
4
2
2
4
2
2
2
2
2
5
2
2
1
3
6
6
5
1
1

ES

EF

LS

LF

PRECEE
DS

FOLLO
W

FF

TF