1. Objective
The Consultant shall conduct a topographic survey of the area and produce a
topographic map of the entire 51 sqkm area earmarked for Town Planning Scheme
1 at Dholera Special Investment Region project, the Consultant will be responsible
to perform the following services:
4. Duration of Work
As per contract the topographic survey shall take a period of 60 working days.
5. Technical Specification of equipment use
The survey shall be undertaken using survey equipment with the following specification:
High precision Real Time Kinematic (RTK) GPS system using GNSS
Total station with 2/5 second accuracy level with list count of 1second.
6. Methodology
After establishing base station, Primary station shall be established at the outer
boundary of the projects and also fixing the control grid within the project area
at every 2km by the same procedure using DGPS and with observation of
minimum 2hrs.
Secondary station or control point shall be established at the time of detail
topographic survey if required, using static GPS survey procedure using
deferential global positioning system (DGPS) and with observation of minimum
1hrs.
RCC/brick pillar shall be constructed of size 20cmx20cmx 50cm as benchmark
pillar/ control point pillar at base station and every Primary and secondary
stations. And the GTS value and level shall be painted over the pillar.
Fly level shall be conducted for determining the Z value of the base point from
any nearby permanent bench mark of Survey of India, Indian Railway of
PWD/CPWD. Z value of all primary and secondary control points shall be
determined w.r.t the base point Z value.
After completing the traverse, detailed survey shall be started using Real time
kinematics system. Two separate team shall be deployed for detail survey using
RTK, first team shall be engaged in recording the spot levels and co-ordinate, 2 nd
team shall be engaged in collecting features and foot prints.
Each team having minimum 5nos of rover mounted in two wheeler/ four wheeler
or pedestrian, i.e. 10nos of rover apart from the station shall be used at a time
for detail survey.
Total station shall be used where RTK system shall not able to connect with
satellite.
Existing ground level/ Spot levels shall be collected with a grid of 100m in flat
terrain, and for steep terrain the grid shall be 30 to 50m or less as per the
scenario.
At all road junctions (State highway, national highway, district road, any other
major road) existing ground levels shall be recorded as per recommendation of
MoRT&H specification.
Also in the case of any major bridge, existing ground level shall be collection
500m of each side of approach as per recommendation of MoRT&H specification.
Apart from the ground levels and co-ordinates the Following
features/establishment shall be recorded separately and given in the survey
map/drawing:
Foot prints of all buildings, monuments and structures.
Foot prints of existing villages.
Foot prints of existing canals and water bodies.
All electrical lines and poles location.
Route of existing Gas pipe lines. (If any)
Route of existing water supply line (Trunk main & distribution). (If any)
Route of existing sewerage system (Trunk main & internal collection
network). (If any)
Route of existing storm water drainage line (Trunk main & internal
collection network). (If any)
Route of existing telephone/OFC line. (If any)
Any other underground service line.
Foot print of Solid waste dumping yard. (if any)
All existing road with ROW. (Bituminous and concrete)
All existing Kaccha road. (Cart track).
Bridges and culverts.
Existing Railway line. (if any)
Wells
Natural or artificial drain. (If any)