Boq Summary
Boq Summary
CALC BY
S.P.
23/11/2015
INCLUDING LABOUR
4000 per m3
55 kg
INCLUDING BENDING
50 Rs/m2
COLUMNS
CONC(M3)
FOUNDATION
STEEL(KG_)
--
PLINTH
FIRST
CONC(M3)
STEEL(KG_)
--
BASEMENT
SLABS INC.
FOUNDATION
SHEAR WALLS
CONC(M3)
BEAMS
STEEL(KG_)
12.40
CONC(M3)
302.97
LEVELWISE CONSUMPTION
STEEL(KG_)
(M2)
13.02058212
334.0212318
30.46
71976.26623
0
10.686712
1694.008262
15.72
1,858.90
58.63436534
6168.902576
295.83
588618.377
12.43851
1754.184735
29.43
1,533.80
21.85
2,848.79
66.91100997
7442.373036
610.57
707503.2969
SECOND
7.5728328
1063.633175
35.30
1,677.27
22.43
4,601.29
96.83721285
10487.01709
575.85
992927.4573
TERRACE
7.5728328
1063.633175
62.22
2,982.38
21.91
3,139.30
96.28899767
8713.989035
788.42
903846.3206
40.18
6,761.64
0.00
0.00
146.32
7,845.13
86.01
15,096.64
331.6921679
33146.30297
160737.7279
371890.1078
585288.362
431482.156
344051.9914
830315.0735
2,301.13
3264871.718
TOTAL
CONSUMTIONS
TOTAL COSTS
10% FOR LAP LENGTHS FOR SLABS, COLUMNS, BEAMS, NO NEED FOR ISOLATED FOOTINGS WHICH DO NOT HAVE LAPS
ADDED
5% FOR WASTAGE
ADDED
5% FOR WASTAGE
35.455873
30.39074829
kg/sq.ft
3.295155484
837.7570093 m2
2.824418986
977.3831776 m2
362.189437