Madhyamaheshwar SHP (3X5) MW
Madhyamaheshwar SHP (3X5) MW
142 m long
Desilting Tank
Inlet Adit
I
69 m
long
Adit II:-171 m
long & 99 m
excavated
Legend
Work Executed
Critical position
Escape pipe
200 m long
Penstock
1.7 m dia
500 m long up
to trifercation
261 m
Tunnel 3928 m long
Completed 1205M
Remaining 2723m
2105 m
1823 m
Forebay
40.1m X 8 m
1048 m excavated
Power channel
21 M Long
20
157 m tunnel
from outlet has
been excavated
859 m
excavation is
remaining up to
adit II
73.75 m long
500 m
Power house
55m long
960.5 m underground
excavation has been
completed
Power channel
Intake
power tunnel
141 m long
-2723.00
15 m
Switchyard
power tunnel
141 m long
MADHYAMA
Intake
Tunnel
73.75 m long
1088 m excavated
20
261 m
Raised weir
142 m long
3928 m long
Completed 1088+ 1260
excavated
Remaining m
2668
2105
1823 m
Remaining
Remaining 735
Adit I
69 m
long
Adit
II:171
m
long
& 99
m
exca
vate
1933
Legend
15 m
500 m
Power house
s as on 20-06-2016
172
m
Power
chann Foreb Penstock
ay
1.7 m dia
el
500 m long
21 M
up to
Long 40.1m
X 8 m trifercation
long
Work Executed
Critical position