Madhyamaheshwar SHP (3X5) MW

The document summarizes the status of excavation work for the Madhyamaheshwar Small Hydro Power project as of June 20, 2016. It includes a 142 meter long raised weir, a 69 meter long inlet adit, and a 171 meter long adit II with 99 meters excavated. The 3928 meter long main tunnel is partially completed with 1088 meters and 1260 meters excavated, leaving 2668 meters remaining.

Uploaded by

krishbist
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views

Madhyamaheshwar SHP (3X5) MW

The document summarizes the status of excavation work for the Madhyamaheshwar Small Hydro Power project as of June 20, 2016. It includes a 142 meter long raised weir, a 69 meter long inlet adit, and a 171 meter long adit II with 99 meters excavated. The 3928 meter long main tunnel is partially completed with 1088 meters and 1260 meters excavated, leaving 2668 meters remaining.

Uploaded by

krishbist
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

Raised weir Power duct

142 m long

Desilting Tank
Inlet Adit

I
69 m
long

Adit II:-171 m
long & 99 m
excavated

Legend
Work Executed

Work yet to be done

Critical position

Escape pipe
200 m long

Penstock
1.7 m dia
500 m long up
to trifercation

261 m
Tunnel 3928 m long
Completed 1205M
Remaining 2723m
2105 m
1823 m

Forebay
40.1m X 8 m

1048 m excavated

Power channel
21 M Long

20

157 m tunnel
from outlet has
been excavated

859 m
excavation is
remaining up to
adit II

73.75 m long
500 m

Power house
55m long

960.5 m underground
excavation has been
completed

Power channel

Intake

power tunnel
141 m long

-2723.00

15 m

Switchyard

MADHYAMAHESHWAR SHP (3X5) MW

power tunnel
141 m long

MADHYAMA

Intake

Tunnel
73.75 m long

1088 m excavated
20
261 m

Raised weir
142 m long

Desilting TaPower chaannel Inlet

MADHYAMAHESHWAR SHP (3X5) MW tunnel status as on 20-06-2


###

3928 m long
Completed 1088+ 1260

excavated

Remaining m

2668
2105

1823 m

Remaining

Remaining 735

Adit I
69 m
long

Adit
II:171
m
long
& 99
m
exca
vate

1933

Legend

15 m
500 m

Power house

s as on 20-06-2016

172
m
Power
chann Foreb Penstock
ay
1.7 m dia
el
500 m long
21 M
up to
Long 40.1m
X 8 m trifercation

long

Work Executed
Critical position