11-01 Site Preparation & Earthwork
11-01 Site Preparation & Earthwork
Accepted
Item Action Results
Yes No
SAFETY Before commencing this inspection
check the area is safe
1 Check clearing & grubbing have been
completed in accordance with project
requirements
2 Verify drainage preparation is adequate
to ensure full drainage until backfilling
is complete
3 Verify all the required surveys,
inspections, tests have been completed
and properly recorded
A Topography
B Soil Testing
C Aggregate Testing
D Compaction