0% found this document useful (0 votes)
151 views

Principles of Engineering Construction

Uploaded by

Arif Samoon
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
151 views

Principles of Engineering Construction

Uploaded by

Arif Samoon
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
NED UNIVERSITY OF ENGINEERING & TECHNOLOGY THIRD YEAR (URBAN ENGINEERING) ANNUAL EXAMINATION 2009 BATCH 2006-07 Time: 3 Hours PRINCIPLES OF ENGINEERING C (UE-318) STRUCTION Instructions: |. Attempt any five (5] questions from Section A and two [2] questions from section B IL Keep your answers Suceinet. Jil, Draw well labeled diagrams where needed IV. Assume any missing data where ever needed Section A Question 1, a. Describe briefly the building construction team; highlight the major roles and responsibilities of several stakeholders. [5] b. What are problem and non problem soils? [5] Question 2. ‘Write a note on the following properties of soil [10] es Internal friction a b. Cohesion c. Plasticity d. Bearing capacity fe. Settlement, Question 3. Draw neat and label diagram for the following ( a. Typical footing form b. Large column footings © Wall forms Question 4, L_-~ 2 What is the difference between surface water and ground water? Explain terms [5] i. Water table rise ii, Capillary rise b. Write a note on different types of doors [4] Question 5. he Write a brief note on the following terms [6] i. Bleeding. ii, Screeding. lil. Leveling of placed concrete. b. What are the materials for temporary and permanent forms? [4] Question 6. ‘What are the properties of plastic mortar? Enumerate all and describe any 2 [4] Le Discuss the process of structural concrete as followed in cast in place concreting for the following members; (6] 1 Columns Beamg Question 7, 1 2 What are the different types of structural slabs (intermediate and roof)? Briefly describe the method for cast in place structural fone way solid siab” [5] b. How solls are classified? Discuss with respect to major divisions of ASTM soil classification, [5] Question 8, \ Write a note on precast concrete, Explain with reference to site east units and plant cast ~~ \ units, (20) Section B Question 9. __A&Acy wheel loader will be used to charge the aggregate bins of an asphalt plant that is \-~ located at the quarry. The one-way haul distance from the 1.25 in, aggregate stockpile to the cold bins of the plant is 220 ft. The asphalt plant uses 105 tons per hour of 1.2: in. aggregate. Can the loader meet this requirement if the loose unit weight aggregate is 3100 lb per cy? [15) of Question 10. _ASelf-propelled tamping foot compactor will be used to compact a fill being constructed \- of clay material, Field tests have shown that the required density can be achieved with four passes of the roller operating at an average speed of 3 mph. The compacted lift will have a thickness of 6 in. The compacting width of this machine is 7 ft, One bank cubic yard equals 0.83 compacted cubic yards. The scraper production estimated for the Project is 510 bey per hour. How many rollers will be required to maintain this Production? Assume S0-min hour efficiency. [35) Question 14. A shovel with 2 3-cy heaped bucket is loading well-blasted rock on a highway project. Zhe average face height is expected to be 22ft. The shovel has a maximum rated digging height of 30ft. Most of the cut will require a 140° swing of the shovel to load the haul tits. What is a conservative production estimate in bank cubie yards? AS = 90°, stick length = 12° (15) Question 12. A crawler hoe having a 3.5 cy bucket is being considered for use on a project to excavat very hard clay from @ borrow pit. The clay will be loaded into trucks Having 2 loading height of 9ft 9 in, Sol-boring information indicates that below & ft, the material changes to an unacceptable silt material. What is the estimated production of the hoe in cubic yards bank measure, ifthe efficiency factor is equal to a 50 min-hour? [15}

You might also like