This document is a timesheet for March 2010 listing the names, designations, leave periods, and remarks for 15 employees working on sites in Madgaon and Panjim, Goa. It shows that the Project Manager Pravin Shrivastwa was on leave from March 4-13 and will receive full payment. Site Engineer Santosh Singh was on leave from March 1-8 and will also receive full payment. The Electrician Supervisor Sandeep Vide was on leave from March 20-21 and visited Bombay on the 22nd, and will be paid for 3 days.

Uploaded by

asharamnishad
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Time Sheet Send To HO

This document is a timesheet for March 2010 listing the names, designations, leave periods, and remarks for 15 employees working on sites in Madgaon and Panjim, Goa. It shows that the Project Manager Pravin Shrivastwa was on leave from March 4-13 and will receive full payment. Site Engineer Santosh Singh was on leave from March 1-8 and will also receive full payment. The Electrician Supervisor Sandeep Vide was on leave from March 20-21 and visited Bombay on the 22nd, and will be paid for 3 days.

Uploaded by

asharamnishad
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

TIME SHEET March' 2010

Sr.
No. Name Design. Leave period Remarks

1 Shri Pravin Shrivastwa Project Manager on leave 04.03.10 to 13.03.10 Full Payment
Goa

2 Shri Santosh Singh Site Engineer on leave 01.03.10 to 08.03.10 Full Payment
Madgaon

3 Ms Ponita Pereira Site Engineer Nil


Madgaon

4 Shri Mukesh Singh Site Supervisor on leave 01.03.10 to 09.03.10 Full Payment
Madgaon

5 Shri Debnath Jaiswal Site Supervisor Nil


Madgaon

6 Shri Santosh George Kutty Site Supervisor Nil


Madgaon

7 Shri Kundan Rai Site Supervisor Nil


Madgaon

8 Shri Somnath Kamble Store Keeper Nil


Madgaon

9 Shri Sonu Sehwag Stores Asstt. Nil


Madgaon

10 Shri Batista Silva Driver Nil


Madgao

11 Shri Eshak Shaikh Trainee Accountant 2days only on leave 04.03.10 & 16.03.10, Full Payment
Madgaon

12 Shri N.H. Tiwari Project Manager Reported to H.O. from 15.03.10 to 23.03.10 Full Payment
Madgaon on leave from 24.3.10 to 29.3.10

12 Shri Sebstain Thomas Site Engineer Nil Full payment


Panjim

13 Shri Santosh Jaiswal Site Supervisor on leave on 04.03.10 Full payment


Panjim
15 Shri Sandeep Vide Electrician Sup. on leave 20.03.10 to 21.03.10 Full payment
Madgaon & Pajim & on 22.03.10 visited to bombay
(only 3 days)