The objectives of the PM & C Programme are to enable better communication between group and corporate management regarding the progress of major projects, allow group management to more closely monitor major project progress, and provide group personnel the capability to better manage and control major projects. Specifically, the programme aims to establish a reporting and control system for communicating project activity with group and corporate management, initially for high-cost capital projects and then expanding to "critical" and all other projects, along with developing a procedures manual.

Uploaded by

10805997
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Presentation 4

The objectives of the PM & C Programme are to enable better communication between group and corporate management regarding the progress of major projects, allow group management to more closely monitor major project progress, and provide group personnel the capability to better manage and control major projects. Specifically, the programme aims to establish a reporting and control system for communicating project activity with group and corporate management, initially for high-cost capital projects and then expanding to "critical" and all other projects, along with developing a procedures manual.

Uploaded by

10805997
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 2

General objectives OF PM & C PROGRAMME

1. Enable better communication between group


& corporate management with regards to
progress of major projects .
2. Enable group management to more closly
moniter the progress of major projects
3. Provide the capabilty for group personnel to
better manage & control major projects .
Specific objectives

• Reporting & control system


For communication of project activity with
group & corporate.
Initially for high cost capital projects then for
“critical”, then all others
Procedures manual