Halon
Halon
Systems
I CAN’T SEE WHAT’S GOING ON
DOWN THERE. YOU’D BETTER
POKE ANOTHER HOLE IN THE
OZONE LAYER.
HALON IS A SEVERE
OZONE DEPLETING
SUBSTANCE
HALON
■ MONTREAL PROTOCOL OF 1987
◆ ALL HALON PRODUCTION CEASED AS OF
JAN 1994
◆ IN 1996, THE US NAVY HAD 1.6 MILLION LBS
OF HALON 1301 IN STORAGE (ENOUGH TO
LAST 30 YEARS)
■ ALTERNATIVES
◆ FM-200
◆ HIGH PRESSURE WATER MIST
HALON
■ HOW TO GET (AND GET RID OF) HALON
1301
◆ COMNAVSUPSYSCOM MECHANICSBURG
111211Z AUG 99 IDENTIFIED DSC
RICHMOND AS THE ODS RESERVE
CENTRAL POINT OF ISSUE
◆ REPLACEMENT AGENT IS AVAILABLE
FREE OF CHARGE
HALON
■ 1 1 - NUMBER OF CARBON ATOMS
■ 3 2 - NUMBER OF FLUORINE ATOMS
■ 0 1 - NUMBER OF CHLORINE ATOMS
■ 1 1 - NUMBER OF BROMINE ATOMS
POWER AVAILABLE
SYSTEM ACTIVATED
HALON DISCHARGED
HALON SYSTEM
Pressure Switches
- Vent Shutdown
-Pre-discharge Alarm
- Vent Damper control
- Discharge Alarm
TDD Bypass
Valve
TDD
CO2 Actuation
Bottle
HALON 1301 SYSTEM
COMPONENTS
■ HALON CYLINDER
◆ PRESSURIZED WITH NITROGEN TO 600-675
PSI AT 700F
◆ COMES IN 10/15/60/95 AND 125 LB SIZES
◆ NON-SHATTERABLE STEEL CYLINDERS
◆ COLOR CODED RED WITH 3”WHITE STRIPE
ABOVE 3” GRAY STRIPE
HALON 1301 SYSTEM
COMPONENTS
■ HALON CYLINDER
■ PMS REQUIRES ULTRASONIC
INSPECTION ON A SEMI ANNUAL
BASIS
■ CYLINDERS MUST BE WEIGHED UPON
INITIAL RECEIPT / WHENEVER
ULTRASONIC RESULTS INDICATE
LIQUID LEVEL IS TOO LOW
Halon Cylinder
Storeroom
(DDG 51 class)
HALON 1301 SYSTEM
COMPONENTS
■ INSPECT CYLINDER VALVES /
ACTUATORS
◆ NAVSAFECEN SAFETY ADVISORY
14-95 DEFINES CRITICAL
MEASUREMENTS TO IDENTIFY
WHICH VALVE ACTUATORS ARE
INSTALLED
HALON 1301 SYSTEM
COMPONENTS
■ CYLINDER VALVE ASSEMBLY
AND RUPTURE DISC
◆ SPOOL TYPE VALVE
◆ RUPTURE DISC RELIEVES AT 2650-
3000 PSI (APPROX 2400F)
ACTUATOR HEAD
Wire braided
discharge
hose
Pressure gage
HALON 1301 SYSTEM
COMPONENTS
■ CYLINDER PRESSURE GAGE
◆ 0-1500 PSI
◆ CYLINDER PRESSURE IS DIRECTLY
PROPORTIONAL TO SPACE TEMP.
◆ PMS REQUIRES INSPECTION OF
CYLINDER PRESSURES MONTHLY
HALON 1301 SYSTEM
COMPONENTS
■ HALON DISTRIBUTION PIPING AND
NOZZLES
◆ PROVIDES AGENT DISTRIBUTION
THROUGHOUT SPACE
◆ PIPING CONNECTED BY 11/2 ” STEEL
BRAIDED FLEXIBLE HOSES
✦ HYDROSTATICTESTING AT REGULAR INTERVALS
PER FLEX HOSE MANAGEMENT PROGRAM NO
LONGER REQUIRED / VISUAL INSPECTION
ANNUALLY
HALON 1301 SYSTEM
COMPONENTS
■ HALON DISTRIBUTION PIPING
AND NOZZLES
◆ NOZZLE ORIFICE AND BODY SIZE
VARY DUE TO VOLUME OF SPACE
PROTECTED AND NOZZLE
LOCATION
HALON 1301
■ SPACE RE-ENTRY REQUIREMENTS
◆ 15 MINUTE SOAK TIME REQUIRED TO
ALLOW FOR SPACE COOLING
◆ OBA REQUIRED FOR ENTRY
◆ FFE, BOOTS, GLOVES, FLASH GEAR,
HELMET
◆ 2 CHARGED AFFF HOSES
INLINE TIME DELAY
FILTER
DEVICE Halon 1301 Flooding System
RELEASE ALARM ACTUATION
PRESSURE SWITCH VENT FITTING
TDD BYPASS
VENT
SHUTDOWN 11/2 ”
AND CHECK
PRE-DISCHARGE VALVE
ALARM
PRESSURE
SWITCHES
5 LB CO2
ACTUATION RESERVE BANK
CYLINDER
PROTECTED SPACE
HALON-1301 vs FM-200
HALON FM-200
ODP 15 0
ATM LIFE 77 31
EFF % 3% 8.5%
RDC 5-7% 12-13%
# OF CYL 12 23
WT/VOL 1 1.9
DECOMP TEMP 9000F 12920F
LOAEL 7.5% 10.5%
FM-200
■ SKED FOR INSTALLATION IN
FLAMMABLE LIQUID STOREROOMS
ON LPD-17 / CVN-76
■ DESIGNATED HFC-227ea
FRESH WATER
HIGH
STORAGE M PRESSURE
TANK
WATER MIST
1000 PSI
DISCHARGE
PRESSURE
Unit 5.9