9 Al Bandar Swimming Pool Log Form

This document is a weekly log for maintaining multiple swimming pools at a resort in Oman. Each day includes testing chlorine and pH levels, cleaning floors, walls and surfaces, and logging the tasks. Pools are checked daily and deeper monthly maintenance includes inspecting equipment, seals, pipes and pump bearings. Staff log their time and tasks are verified by a supervisor.

Uploaded by

abokoraa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
331 views

9 Al Bandar Swimming Pool Log Form

This document is a weekly log for maintaining multiple swimming pools at a resort in Oman. Each day includes testing chlorine and pH levels, cleaning floors, walls and surfaces, and logging the tasks. Pools are checked daily and deeper monthly maintenance includes inspecting equipment, seals, pipes and pump bearings. Staff log their time and tasks are verified by a supervisor.

Uploaded by

abokoraa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

AL BANDAR SWIMMING POOL LOG

REPORT Nº:

Shangri-La’s Barr Al Jissah Resort & Spa, Sultanate of Oman

Week From:______________________________________

Day one Date:____________________________________

1/ Test & Treat Main Pool Formal Children Outdoor Lazy River
Pool Pool Jacuzzi
CL reading (2.0-
3.0ppm)
PH reading (7.2 –
7.8)
2/ Cleaning & Main Pool Formal Children Outdoor Lazy River
Vacuum Pool Pool Jacuzzi
Floor
Walls
Skim water surface

Remarks:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

Day two Date:____________________________________

1/ Test & Treat Main Pool Formal Children Outdoor Lazy River
Pool Pool Jacuzzi
CL reading (20-
30ppm)
PH reading (7.2 –
7.8)
2/ Cleaning & Main Pool Formal Children Outdoor Lazy River
Vacuum Pool Pool Jacuzzi
Floor
Walls
Skim water surface

Remarks:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

1/4
Swimming Pool Log
Day three Date:__________________________________

1/ Test & Treat Main Pool Formal Children Outdoor Lazy River
Pool Pool Jacuzzi
CL reading (2.0-
3.0ppm)
PH reading (7.2 –
7.8)
2/ Cleaning & Main Pool Formal Children Outdoor Lazy River
Vacuum Pool Pool Jacuzzi
Floor
Walls
Skim water surface

Remarks:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

Day four Date:___________________________________

1/ Test & Treat Main Pool Formal Children Outdoor Lazy River
Pool Pool Jacuzzi
CL reading (2.0-
3.0ppm)
PH reading (7.2 –
7.8)
2/ Cleaning & Main Pool Formal Children Outdoor Lazy River
Vacuum Pool Pool Jacuzzi
Floor
Walls
Skim water surface

Remarks:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

Day five Date:____________________________________

1/ Test & Treat Main Pool Formal Children Outdoor Lazy River
Pool Pool Jacuzzi
CL reading (2.0-
3.0ppm)
PH reading (7.2 –
7.8)

2/2
Swimming Pool Log
2/ Cleaning & Main Pool Formal Children Outdoor Lazy River
Vacuum Pool Pool Jacuzzi
Floor
Walls
Skim water surface

Remarks:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

Day six Date:____________________________________

1/ Test & Treat Main Pool Formal Children Outdoor Lazy River
Pool Pool Jacuzzi
CL reading (2.0-
3.0ppm)
PH reading (7.2 –
7.8)
2/ Cleaning & Main Pool Formal Children Outdoor Lazy River
Vacuum Pool Pool Jacuzzi
Floor
Walls
Skim water surface

Remarks:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

Day seven Date:__________________________________

1/ Test & Treat Main Pool Formal Children Outdoor Lazy River
Pool Pool Jacuzzi
CL reading (2.0-
3.0ppm)
PH reading (7.2 –
7.8)
2/ Cleaning & Main Pool Formal Children Outdoor Lazy River
Vacuum Pool Pool Jacuzzi
Floor
Walls
Skim water surface

Remarks:____________________________________________________________________
3/3
Swimming Pool Log
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

Monthly Maintenance:

Check & Inspect:______________________________________________________________


____________________________________________________________________________

All pumps seal / gland:__________________________________________________________


____________________________________________________________________________

Pump Room Pipeworks:_________________________________________________________


____________________________________________________________________________

Pump Bearings:_______________________________________________________________
____________________________________________________________________________

Remarks:____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Work completed by:_________________________Time in: _____________________________


Checked by: _____________________________Time out: _____________________________

4/4