MUSCAT MUNICIPALITY
CONSTRUCTION OF WADI ADAI
INTERCHANGE
EXISTING BOX CULVERT
Consultant: Contractor:
These trial pits for bridge 2 revealed huge quantities of unforeseen reinforced concrete lately
identified to be an existing box culvert.
This box culvert can be followed threw the iron covers located in the road, and it can be
showed with exact details at foundations location where it’s possible to excavate.
This box started with 3 cells, and it ends up to be joined by a 4th cell that starts from Wadi Adai
Round About. It will be affecting: Pier No. 7 (for bridge 1)
Pier No.1, pier No. 2, pier No.5, pier No.6 and abutment 2 (for bridge 2)
This channel is not in very good conditions, some steel is hanging from its top slab, and some
cracks appear on the asphalt coarse on its top.
Attached with this report you can find drawings and pictures showing: