0% found this document useful (0 votes)
22 views

Mold Fill Analysis: CEI - Bracket

The document provides specifications for molding analysis of a bracket part including: 1) Mold design details such as part volume, weight, thickness, and projected area. 2) Machine requirements for the molding process such as clamp force, shot size, injection rate, and temperatures. 3) Analysis results including estimated fill time, pressures, fiber orientation, sink displacement, and cooling time. 4) A disclaimer that the estimates do not include sprue/runner/gate systems which would increase requirements.

Uploaded by

lam nguyen
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Mold Fill Analysis: CEI - Bracket

The document provides specifications for molding analysis of a bracket part including: 1) Mold design details such as part volume, weight, thickness, and projected area. 2) Machine requirements for the molding process such as clamp force, shot size, injection rate, and temperatures. 3) Analysis results including estimated fill time, pressures, fiber orientation, sink displacement, and cooling time. 4) A disclaimer that the estimates do not include sprue/runner/gate systems which would increase requirements.

Uploaded by

lam nguyen
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 9

Mold Fill Analysis

CEI – Bracket
06-25-04
Process & Machine
Specifications
• ==== Mold design information ==== • ==== Machine specification ====

• Total part volume = 4.99 in^3 • Required clamp force = 18.20 ton(US)
• Required shot size = 3.08 oz
• Total part weight = 2.77 oz
• Max injection rate = 5.82 in^3/s
• Total projected area = 21.76 in^2 • Machine performance = Best
• Average part thickness = 0.07 in
• Deviation of part thickness = 0.02 in • ==== Resin specification ====

• ==== Machine setup ==== • Polymer : PP 40% mineral filled.

• ==== Warning (Disclaimer) ====


• Fill time = 0.86 s
• Packing/Holding time = 2.98 s
•  The injection pressure, clamp force, shot size and fill-
• Cooling time = 6.61 s time estimates do not include the sprue/runner/gate
• Maximum injection pressure = 2072.62 psi system.
• • Inclusion of the sprue/runner/gate system will increase
Packing/Holding pressure = 1658.10 psi
the required injection pressure, clamp force, shot size
• Melt temperature = 450.00 F and fill-time.
• Mold temperature = 120.00 F •  Holding pressure is estimated as 80% of the injection
pressure.
Melt Front Advancement

Gate Location Gate Location


#1 #3

Gate
Gate Location
Location
#2
#4
Melt Front @ 92% full

Last to Fill

Last to Fill

Last to Fill

Last to Fill
Pressure Distribution
Cooling Time
Fiber Orientation
SINK DISPLACEMENT
SINK DISPLACEMENT