Analysis of Ribbed Slab
Analysis of Ribbed Slab
Km Ks
19.00 3.95
20.00 3.96
21.00 3.96
22.00 3.97
23.00 3.98
24.00 3.98
25.00 3.99
26.00 4.00
27.00 4.02
28.00 4.03
29.00 4.04
30.00 4.05
31.00 4.06
32.00 4.07
33.00 4.08
34.00 4.09
35.00 4.10
36.00 4.11
37.00 4.12
38.00 4.15
39.00 4.17
40.00 4.18
41.00 4.20
42.00 4.21
43.00 4.24
44.00 4.26
45.00 4.29
46.00 4.31
47.00 4.34
48.00 4.36
49.00 4.39
50.00 4.41
51.00 4.46
52.00 4.49
53.00 4.51
54.00 4.56
55.00 4.62
56.00 4.65
57.00 4.67
58.00 4.73
Design of slab mat fondatiooon
P1= 1308.60 P3 P4
P2= 1368.00 B
Mx= -
My= - 3.5
P3= 729.00 P1 P2
P4= 849.60 A
Mx= -
My= -
S-1= 1432.49 4
S-2= 982.13
1 2
S-3= 1575.45
N.B .For dimensions please refer the drawings
SP 8245.269 KN
M1,2 17597.73
x= 2.13
MA,B 17265.8655
y= 2.09
ex= 0.13 m
ey= -0.09 m
s=SP(1/A+-ex*y/Ix+-ey*x/Iy)
Ix = 126.00 m4
Iy = 171.50 m4
Mx= 775.33
My= 1107.19
A1-B1 s= 236.94
A2-B2 s= 262.77
M= 295.61 Cantilever
4x(0.4+d)dx641.67=1306
4x(0.4+d)d= 2.04
4d2+1.6d-2.04=0
Reinforcement determination
I- short direction
Km= 31.55
Ks= 4.06
f 20
A S= 2182.31 140 mm
Km= 37.97
Ks= 4.12
f 20
A S= 3207.72 98 mm
III- Cantilever
Km= 31.84
Ks= 4.06
f 20
A S= 2222.58 140 mm
Shop and office Wzr Sewunet
Design Date
fck= 20 MPa
fcd= 11.33 MPa
Design procedure
Loading
References:
EBCS 1, 2, 3 ,& 8
Slab Analysis
Solid slabs are preferable in areas where soil waste pipes pass.
0 S-1 1
Depth determination
d= 133.52 mm
D= 164.52 mm
Use D= 200.00 mm
d= 169.00 mm
q= 29.74 o
0.52 rad
Dead load
Inclined part Concrete 4.8
Screeed 0.69
Marble 0.54
tread + riser 0.54
Total 6.57 Kn/m2
Live load 5 Kn/m2
Pdead= 7.57
Plive= 5.00
Pd= 17.84
Landing part
Concrete 4.8
Screeed 0.69
Marble 0.54
Total 6.03 Kn/m
17.84
12.64 12.64
a b
1.25 2.52 1.6
Reaction determination
Taking moment about b)
Ra= 23.91
Rb= 57.06
Mmax= 22.01 Kn-m Span
Mmax= -15.92 Kn-m Support
Km= 27.76
Ks= 4.02
Ascal= 522.81
Reinf 12 c/c 150 mm
x M(x) Mmax
0 -
0.20 (4.53)
0.40 (8.55)
0.60 (12.07)
0.80 (15.08)
1.00 (17.59)
1.20 (19.59)
1.40 (20.06)
1.60 (19.49)
1.80 (18.21)
2.00 (16.21)
2.20 (13.50) (13.50)
2.40 (10.08)
2.60 (5.94)
2.80 (1.09)
3.00 4.47
3.20 10.75
3.40 17.74
3.60 25.44
3.77 32.55
3.80 30.84
4.00 19.76
4.20 9.18
4.40 (0.89)
4.60 (10.46)
4.80 (19.52)
5.00 (28.07)
5.20 (36.12) 0 0.5 1 1.5 2 2.5 3
5.37 (42.57) 35
30
25
20
15
10
-5
-10
S-1 D [mm]
Lx [m] Ly [m] ba calc d[mm] 60.00
3.50 4.00 38.57 36.30 270.00
Floor finish 5cm Screed Weight Ceiling Plaster Other.D.Load
0.06 1.15 6.75 0.35 0.00
L(in) L(out) h Wall unit weight q
1.70 1.70 2.70 3.30 2.50
10.81 Cover [mm]
3.00 15.00
18.85
r1 r2 r3 r4 nd
0.00 1.33 1.33 1.33 1.00
axs a ys a xf a yf b
0.045 0.037 0.034 0.028 0.32
Mxs Mys Mxf Myf
10.39 8.54 7.85 6.47
170 140 130 110
0.06 0.05 0.05 0.04
417 417 417 417
161 132 121 100
417 417 417 417
# of bars # of bars # of bars # of bars
7 7 7 7
540 540 540 540
180.00 180.00 180.00 180.00
180.00 180.00 180.00 180.00
Load Transfer on Beams Ly/Lx= 1.14
bvcx bvdx bvcy bvdy
0.42 0.00 0.36 0.24
Rcx Rdx Rcy Rdy
27.97 N.A. 23.75 15.84
4.45 N.A. 3.78 2.52
16.04 N.A. 13.62 9.08
Design Date
fck= 20 MPa
fcd= 11.33 MPa
2) Design procedure
2.1 Loading
Rib slab