0% found this document useful (0 votes)
159 views

Ra For np-4 p-04

The document provides rate analysis for NP4 reinforced concrete pipes of various diameters used in the Ahmedabad Bus Rapid Transit System project. It analyzes the material and labor costs for 300mm, 450mm and 600mm diameter pipes. Material costs include concrete and steel quantities based on 2005-2006 schedule of rates. Labor costs are kept constant. The total cost is calculated which includes a 24.315% tender premium. The rate per running meter is reported as Rs. 1274.47 for 300mm diameter pipe, Rs. 1607.20 for 450mm diameter pipe and Rs. 1488 for 600mm diameter pipe.

Uploaded by

Ashish Rajput
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
159 views

Ra For np-4 p-04

The document provides rate analysis for NP4 reinforced concrete pipes of various diameters used in the Ahmedabad Bus Rapid Transit System project. It analyzes the material and labor costs for 300mm, 450mm and 600mm diameter pipes. Material costs include concrete and steel quantities based on 2005-2006 schedule of rates. Labor costs are kept constant. The total cost is calculated which includes a 24.315% tender premium. The rate per running meter is reported as Rs. 1274.47 for 300mm diameter pipe, Rs. 1607.20 for 450mm diameter pipe and Rs. 1488 for 600mm diameter pipe.

Uploaded by

Ashish Rajput
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

AHMEDABAD BUS RAPID TRANSIT SYSTEM - "JANMARG"

PACKAGE 04 - PIRANA - DANILIMDA - MANINAGAR & DANILIMDA - CHANDOLA - NAROL -12.0 kM


RATE ANALYSIS FOR NP4 300 MM DIA RCC HUME PIPE

Sr.No Particulers Unit Rate Quantity Amount Remarks


1 NP4 600 DIA Rmt 1488.00 BOQ ITEM P-04
A Material Component

Concrete M-35 per Rmt Cum 3304.000 0.183 604.632 S.OR. 2005-2006

Steel per Rmt MT 29.000 0.012 0.347 S.OR. 2005-2006


Total 604.979
B Labour Component 883.021

2 NP4 300 DIA


C Material Component
Concrete M-35 per Rmt Cum 3304.000 0.043 142.072 S.OR. 2005-2006
Steel per Rmt MT 29.000 0.003 0.101 S.OR. 2005-2006
Total 142.173
D Labour Component 883.021

Total cost (C+D) 1025.194

Add tender premium 24.315 % 249.276


Cost of 300 MM DIA NP4 Pipe per Rmt 1274.470
AHMEDABAD BUS RAPID TRANSIT SYSTEM - "JANMARG"
PACKAGE 04 - PIRANA - DANILIMDA - MANINAGAR & DANILIMDA - CHANDOLA - NAROL -12.0 kM
RATE ANALYSIS FOR NP4 450 MM DIA RCC HUME PIPE

Sr.No Particulers Unit Rate Quantity Amount Remarks


1 NP4 600 DIA Rmt 1488.00 BOQ ITEM P-04
A Material Component

Concrete M-35 per Rmt Cum 3304.000 0.183 604.632 S.OR. 2005-2006

Steel per Rmt MT 29.000 0.012 0.347 S.OR. 2005-2006


Total 604.979
B Labour Component 883.021

2 NP4 450 DIA


C Material Component
Concrete M-35 per Rmt Cum 3304.000 0.124 409.696 S.OR. 2005-2006
Steel per Rmt MT 29.000 0.005 0.135 S.OR. 2005-2006
Total 409.831
D Labour Component 883.021

Total cost (C+D) 1292.852

Add tender premium 24.315 % 314.357


Cost of 450 MM DIA NP4 Pipe per Rmt 1607.209
Concrete quantity of NP-4 pipe

NP4 600 DIA


A-1 3.14/4 0.77 0.77 0.47
A-2 3.14/4 0.60 0.60 0.28
0.183 0.183

NP4 450 DIA


A-1 3.14/4 0.60 0.60 0.28
A-2 3.14/4 0.45 0.45 0.16
0.124 0.124

NP4 450 DIA


A-1 3.14/4 0.38 0.38 0.11
A-2 3.14/4 0.45 0.45 0.07
0.043 0.043

Bags per cum Consumption


M-25 9 450.00
M-35 10 500.00

Diff of cement consumption 1.00 Bags


Basic rate of cement 210.00 Bags
Total amount of cement 210.00 per Cum

Rate of M-25 3094.00 per Cum

Hence rate of M-35 3304.00 per Cum


0.38

0.38
Providing and casting in situ
precast controlled cement
concrete M.350 for
Prestressed concrete work
Cu.M 500-00