Production Schedule

The production schedule outlines the timeline for creating a music magazine from September 2010 to December 2010. It begins with research and planning in September, followed by a photo shoot on the South Bank in October. Construction of the magazine continues through November with the creation of the front cover, contents page, and features article. Final touches are made and an evaluation is completed by the end of December 2010.

Uploaded by

laurenferdinand
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
242 views

Production Schedule

The production schedule outlines the timeline for creating a music magazine from September 2010 to December 2010. It begins with research and planning in September, followed by a photo shoot on the South Bank in October. Construction of the magazine continues through November with the creation of the front cover, contents page, and features article. Final touches are made and an evaluation is completed by the end of December 2010.

Uploaded by

laurenferdinand
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Production Schedule

September 2010 – Begin research and planning


-          Weeks 1&2: Preliminary task
-          Week 3: Research magazine/decide genre of music
-          Week 4: Research completion/music magazine conventions

October 2010 – Photo shoot


-          Week 1: Decide on name, make flat plans
-          Week 2: Find models, Wardrobe decisions made for models
-          Week 3 : Photo shoot on the South Bank
-          Week 4: Begin construction
-           
November 2010 – Construction
-          Week 1: Construct front cover
-          Week 2: Cont. constructing front cover
-          Week 3: Construct contents page
-          Week 4: Cont. constructing contents page/begin writing Features
article

December 2010 – Evaluation


-          Week 1: Construct features article
-          Week 2: Cont. constructing features article
-          Week 3: Magazine complete. Make finishing touches
-          Week 4: Complete evaluation