0% found this document useful (0 votes)
205 views

Test Results Tracker Template

The test results summary shows that no defects were logged or open across all severities. All scripts were passed with 0% failed or incomplete. The regression testing was completed as planned across the testing schedule from February 27 to March 3.

Uploaded by

kdhingra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
205 views

Test Results Tracker Template

The test results summary shows that no defects were logged or open across all severities. All scripts were passed with 0% failed or incomplete. The regression testing was completed as planned across the testing schedule from February 27 to March 3.

Uploaded by

kdhingra
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 11

Test Results Summary as of <Date> for <Build No.

>

Execution Status %
Total % scripts Executed #REF!
Total % scripts Passed #REF!

Defect Count Test Results Summary

Fixed for
Severity Logged Open Retest Closed Regression testing
% of all
P1 (Showstoppers) 0 0 0 0 Status # test cases scripts
P2 (Majors) 0 0 0 0 Passed #REF! #REF!
P3 (Minor) 0 0 0 0 Failed 0 #REF!
P4 (Cosmetic) 0 0 0 0 Deferred 0 #REF!
Total 0 0 0 0 Not Run 0 #REF!
Incomplete 0 #REF!
Total #REF! #REF!
SPI*

Test Results Summary Test Execution


120.00%

100.00%

% Pass Scripts
80.00%

60.00% Planned
40.00%
Actual

20.00%

0.00%
2/27 2/28 3/1 3/2 3/3

Testing Schedule
Passed Failed Deferred Not Run Incomplete

* SPI is Schedule Performance Index : It is calculated on the cumulative basis as total actual scripts executed/total planned scripts executed
HLS # High Level Script(HLS) Description Complexity Status Date Tester Comments
HLS #
Deferred
Failed
Pass
Incomplete
Not Run

High
Medium
Low
High Level Script(HLS) Description Complexity
Status Date Tester Comments
Script Execution
Start Date 02/27/06 Total Days
End Date 03/08/06 Total Scripts
Date 27 28 1 2
Day 1 2 3 4

Planned 13 13 13 13
Total Cumulative 13 26 39 52
Planned % 21.31% 42.62% 63.93% 85.25%

Actual 0 0 0 0
Total Cumulative 0 0 0 0
Actual % 0.00% 0.00% 0.00% 0.00%
5
61
3 4 5 6 7 8
5 5 5 6 7 8

9 0 0
61 61 61
100.00% 0.00% 0.00%

0 0
0
0.00%

You might also like