This document contains a quick changeover analysis of 18 tasks involved in a manufacturing process. It lists each task, the time to complete it, and categories the tasks as either external (requiring movement or travel) or internal (work at the machine). The overall current total time for the process is 32 minutes. The document aims to identify improvement ideas to reduce the total time and re-categorize tasks as internal where possible.
Download as XLS, PDF, TXT or read online on Scribd
0%(1)0% found this document useful (1 vote)
379 views
4 Ram Changeover Analysis Part 1
This document contains a quick changeover analysis of 18 tasks involved in a manufacturing process. It lists each task, the time to complete it, and categories the tasks as either external (requiring movement or travel) or internal (work at the machine). The overall current total time for the process is 32 minutes. The document aims to identify improvement ideas to reduce the total time and re-categorize tasks as internal where possible.