0% found this document useful (0 votes)
2K views

BBS Format (Final)

The bar bending schedule summarizes the rebar requirements for columns of a multi-functional building complex over 8 stories. It lists the quantity of rebar by diameter for the columns from the footing to the ground floor slab and between each higher floor slab. The largest rebar diameter is 1" and most columns require rebar quantities between 1,000-3,000 kg.

Uploaded by

sarwaraw
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

BBS Format (Final)

The bar bending schedule summarizes the rebar requirements for columns of a multi-functional building complex over 8 stories. It lists the quantity of rebar by diameter for the columns from the footing to the ground floor slab and between each higher floor slab. The largest rebar diameter is 1" and most columns require rebar quantities between 1,000-3,000 kg.

Uploaded by

sarwaraw
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

BAR BENDING SCHEDULE

Const. of Multi Functional Building Complex Dated:


Weight in Kg
S. # Description
3/8" 1/2" 5/8" 3/4" 1" Total in Kg

Columns
-

1 Column Footing to G.F Slab


7,795.14 929.01 - 1,328.54 28,936.51 38,989.196

2 " " G.F Slab to F.F Slab


#REF! #REF! #REF! #REF! #REF! #REF!

3 " " F.F Slab to 2nd.F Slab


#REF! #REF! #REF! #REF! #REF! #REF!

4 " " 2nd.F Slab to 3rd.F Slab


#REF! #REF! #REF! #REF! #REF! #REF!

5 " " 3rd.F Slab to 4th.F Slab


#REF! #REF! #REF! #REF! #REF! #REF!

6 " " 4th.F Slab to 5th.F Slab


#REF! #REF! #REF! #REF! #REF! #REF!

7 " " 5th.F Slab to Top.F Slab


- -

8 " " Top.F Slab to Mumty.F Slab


- - - -

Total Weight (Kg)


0 #REF! #REF! #REF! #REF! #REF! #REF!
Total Weight (Tone)
#REF!
Page №:(2)

BAR BENDING SCHEDULE


Const. of Multi Functional Building Complex Dated : 15-12-2010

Ø Total Cut Length Length in Rft


Description Nos of Bars Code A B C D Shape
Bar Nos (Ft) 3/8" 1/2" 5/8" 3/4" 1"
Column up to G.F
Slab
C-1, C-1a
(3'-10"x12")
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 4 x 22 x 1 88 13' - 8 " - - - - 1,202.67 1'-4" 12'-4"

'' '' upto GF Slab 100 18'-0" 18'-0"


8 4 x 22 x 1 88 18' - 0 " - - - - 1,584.00
Rings 501 3'-7" 9" 5" 9" 5"
@ 4", 6" c/c 3 4 x 52 x 1 208 9' - 6 " 1,976.00 - - - - 3'-7"

'' '' 501 3'-7" 4" 5" 4" 5"


3 4 x 52 x 1 208 8' - 8 " 1,802.67 - - - - 3'-7"

'' '' 501 12" 9" 5" 9" 5"


3 4 x 52 x 1 208 4' - 4 " 901.33 - - - - 12"

9"
Tie 206 3"

4.5"
4.5" 9" 3" 2.5"
@ 4", 6" c/c

3 4 x 52 x 2 416 1' - 7 " 658.67 - - - - 2.5"


C-2, C-2c
(3'-0"x12")
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 8 x 16 x 1 128 13' - 8 " - - - - 1,749.33 1'-4" 12'-4"

'' '' upto GF Slab 100 18'-0" 18'-0"


8 8 x 16 x 1 128 18' - 0 " - - - - 2,304.00
Rings 5"
501 2'-9" 9" 5" 9" 2'-9"
@ 4", 6" c/c 3 8 x 52 x 1 416 7' - 10 " 3,258.67 - - - -

'' '' 501 2'-9" 4" 5" 4" 5"


3 8 x 52 x 1 416 7' - 0 " 2,912.00 - - - - 2'-9"

'' '' 501 8" 9" 5" 9" 5"


3 8 x 52 x 1 416 3' - 8 " 1,525.33 - - - - 8"
C-2a, C-2b
(3'-1/8"x9")
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 4 x 14 x 1 56 13' - 8 " - - - - 765.33 1'-4" 12'-4"

'' '' upto GF Slab 100 18'-0" 18'-0"


8 4 x 14 x 1 56 18' - 0 " - - - - 1,008.00
Rings 501 2'-9" 6" 5" 6" 5"
@ 4", 6" c/c 3 4 x 52 x 1 208 7' - 4 " 1,525.33 - - - - 2'-9"

'' '' 501 12" 6" 5" 6" 5"


3 4 x 52 x 1 208 3' - 10 " 797.33 - - - - 12"

C-2d (3'-0"x12")
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 4 x 14 x 1 56 13' - 8 " - - - - 765.33 1'-4" 12'-4"
Vertical Bar upto plinth 200 1'-4" 7'-3" 1'-4" 1'-4" 7'-3" 1'-4"
@ " c/c 8 4 x 2 x 1 8 9' - 11 " - - - - 79.33

'' '' upto GF Slab 8 4 x 14 x 1 56 18' - 0 " - - - - 1,008.00 100 18'-0" 18'-0"

Rings upto plinth 501 2'-9" 9" 5" 9" 5"


@ 4", 6" c/c 3 4 x 20 x 1 80 7' - 10 " 626.67 - - - - 2'-9"

'' '' 501 2'-9" 4" 5" 4" 5"


3 4 x 20 x 1 80 7' - 0 " 560.00 - - - - 2'-9"

'' '' 501 8" 9" 5" 9" 5"


3 4 x 20 x 1 80 3' - 8 " 293.33 - - - - 8"

Rings upto GF Slab 501 5"


2'-9" 6" 5" 6" 2'-9"
@ 4", 6" c/c 3 4 x 32 x 1 128 7' - 4 " 938.67 - - - -

'' '' 501 12" 6" 5" 6" 5"


3 4 x 32 x 1 128 3' - 10 " 490.67 - - - - 12"
C-3, C-3a
(2'-9"x12")
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 4 x 14 x 1 56 13' - 8 " - - - - 765.33 1'-4" 12'-4"

'' '' upto GF Slab 100 18'-0" 18'-0"


8 4 x 14 x 1 56 18' - 0 " - - - - 1,008.00
Rings 501 2'-6" 9" 5" 

@ 4", 6" c/c 3 4 x 52 x 1 208 7' - 4 " 1,525.33 - - - - 

'' '' 501 2'-6" 4" 5"  


3 4 x 52 x 1 208 6' - 6 " 1,352.00 - - - - 

'' '' 501 1'-4" 9" 5"  


3 4 x 52 x 1 208 5' - 0 " 1,040.00 - - - - 
C-4,C-4a, C-4b, C-4c
(2'-6"x12")
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 8 x 14 x 1 112 13' - 8 " - - - - 1,530.67 1'-4" 12'-4"

'' '' upto GF Slab 100 18'-0" 18'-0"


8 8 x 14 x 1 112 18' - 0 " - - - - 2,016.00
Rings 501 5"
2'-3" 9" 5" 9" 2'-3"
@ 4", 6" c/c 3 8 x 52 x 1 416 6' - 10 " 2,842.67 - - - -

'' '' 501 2'-3" 4" 5" 4" 5"


3 8 x 52 x 1 416 6' - 0 " 2,496.00 - - - - 2'-3"

'' '' 501 1'-3" 9" 5" 9" 5"


3 8 x 52 x 1 416 4' - 10 " 2,010.67 - - - - 1'-3"
C-5,C-5a, C-5b, C-5c,
C-5d, C-5e
(2'-6"x12")
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 16 x 14 x 1 224 13' - 8 " - - - - 3,061.33 1'-4" 12'-4"

Unregistered version of BBS Program


Preparaed by Checked by
www.BendingSchedule.com
Page №:(3)

BAR BENDING SCHEDULE


Const. of Multi Functional Building Complex Dated : 15-12-2010

Ø Total Cut Length Length in Rft


Description Nos of Bars Code A B C D Shape
Bar Nos (Ft) 3/8" 1/2" 5/8" 3/4" 1"

'' '' upto GF Slab 100 18'-0" 18'-0"


8 16 x 14 x 1 224 18' - 0 " - - - - 4,032.00
Rings 501 1'-9" 9" 5" 9" 5"
@ 4", 6" c/c 3 16 x 52 x 1 832 5' - 10 " 4,853.33 - - - - 1'-9"

'' '' 501 1'-9" 4" 5" 4" 5"


3 16 x 52 x 1 832 5' - 0 " 4,160.00 - - - - 1'-9"

'' '' 501 1'-0" 9" 5" 9" 5"


3 16 x 52 x 1 832 4' - 4 " 3,605.33 - - - - 1'-0"

C-6

Vertical Bar upto plinth 111 12" 11'-9"


@ " c/c 6 1 x 7 x 1 7 20' - 0 " - - - 140.00 - 12" 11'-9"

'' '' upto GF Slab 100 16'-9" 16'-9"


6 1 x 15 x 1 15 23' - 6 " - - - 352.50 -
Rings 501 3'-1" 9" 5" 9" 5"
@ 4", 6" c/c 3 1 x 46 x 1 46 8' - 6 " 391.00 - - - - 3'-1"

'' '' 501 18" 9" 5" 9" 5"


3 1 x 46 x 1 46 5' - 4 " 245.33 - - - - 18"

'' '' 501 1'-9" 9" 5" 9" 5"


3 1 x 10 x 1 10 5' - 10 " 58.33 - - - - 1'-9"

'' '' 501 2'-6" 9" 5" 9" 5"


3 1 x 56 x 1 56 7' - 4 " 410.67 - - - - 2'-6"

'' '' 501 1'-9" 9" 5" 9" 5"


3 1 x 56 x 1 56 5' - 10 " 326.67 - - - - 1'-9"

Grid ties 201 3" 12" 3" 3" 12"


@ 12" c/c 3 1 x 14 x 6 84 1' - 6 " 126.00 - - - - 3"

'' '' 201 3" 12" 3" 3" 12"


3 1 x 3 x 4 12 1' - 6 " 18.00 - - - - 3"

C-7

Vertical Bar upto plinth 111 12" 11'-9"


@ " c/c 6 1 x 7 x 1 7 20' - 0 " - - - 140.00 - 12" 11'-9"

'' '' upto GF Slab 100 16'-9" 16'-9"


6 1 x 17 x 1 17 23' - 6 " - - - 399.50 -
Rings 501 3'-1" 9" 5" 9" 5"
@ 4", 6" c/c 3 1 x 46 x 1 46 8' - 6 " 391.00 - - - - 3'-1"

'' '' 501 18" 9" 5" 9" 5"


3 1 x 46 x 1 46 5' - 4 " 245.33 - - - - 18"

'' '' 501 1'-9" 9" 5" 9" 5"


3 1 x 10 x 1 10 5' - 10 " 58.33 - - - - 1'-9"

'' '' 501 2'-4.5" 9" 5" 9" 5"


3 1 x 56 x 1 56 7' - 1 " 396.67 - - - - 2'-4.5"

'' '' 501 2'-3" 9" 5" 9" 5"


3 1 x 56 x 1 56 6' - 10 " 382.67 - - - - 2'-3"

Grid ties 201 3" 12" 3" 3" 12"


@ 12" c/c 3 1 x 14 x 5 70 1' - 6 " 105.00 - - - - 3"

'' '' 201 3" 12" 3" 3" 12"


3 1 x 3 x 3 9 1' - 6 " 13.50 - - - - 3"
Sec C-C
(Down Portion)
H. Bar 100
@ " c/c 6 1 x 8 x 1 8 10' - 9 " - - - 86.00 -
10'-9" 10'-9"

Rings 501 3"


1'-9" 4.5" 3" 4.5" 1'-9"
@ 4" c/c 3 1 x 33 x 1 33 4' - 9 " 156.75 - - - -
Sec C-C
(Up Portion)
H. Bar
6 1 x 8 x 1 8 15' - 6 " - - - 124.00 - 100 15'-6" 15'-6"
@ " c/c

Rings 501 3"


1'-9" 4.5" 3" 4.5" 1'-9"
@ 4" c/c 3 1 x 48 x 1 48 4' - 9 " 228.00 - - - -
SW-1

Vertical Bar upto plinth 111 1'-4" 12'-4"


@ " c/c 8 1 x 8 x 2 16 13' - 8 " - - - - 218.67 1'-4" 12'-4"

'' '' upto GF Slab 100 18'-0" 18'-0"


8 1 x 8 x 2 16 18' - 0 " - - - - 288.00
Vertical Bar upto plinth 111 12" 11'-9"
@ 8" c/c 6 1 x 6 x 2 12 12' - 9 " - - - 153.00 - 12" 11'-9"

'' '' upto GF Slab 100 16'-9" 16'-9"


6 1 x 6 x 2 12 16' - 9 " - - - 201.00 -
ELEVATION
4'-8"

4'-8"

Rings 874 A 4'-8" 6" 4'-8"


@ 6" c/c

PLAN 6"
4 1 x 42 x 2 84 9' - 10 " - 826.00 - - - A E

'' '' 501 21" 6" 5" 6" 5"


4 1 x 42 x 2 84 5' - 4 " - 448.00 - - - 21"

'' '' 501 8" 6" 5" 6" 5"


4 1 x 42 x 2 84 3' - 2 " - 266.00 - - - 8"

SW-2
Vertical Bar upto plinth 111 1'-4" 12'-4"
@ " c/c 8 1 x 8 x 2 16 13' - 8 " - - - - 218.67 1'-4" 12'-4"

'' '' upto GF Slab 8 1 x 8 x 2 16 18' - 0 " - - - - 288.00 100 18'-0" 18'-0"

Unregistered version of BBS Program


Preparaed by Checked by
www.BendingSchedule.com
Page №:(4)

BAR BENDING SCHEDULE


Const. of Multi Functional Building Complex Dated : 15-12-2010

Ø Total Cut Length Length in Rft


Description Nos of Bars Code A B C D Shape
Bar Nos (Ft) 3/8" 1/2" 5/8" 3/4" 1"
Vertical Bar upto plinth 111 12" 11'-9"
@ " c/c 6 1 x 6 x 2 12 12' - 9 " - - - 153.00 - 12" 11'-9"

'' '' upto GF Slab 100 16'-9" 16'-9"


6 1 x 6 x 2 12 16' - 9 " - - - 201.00 -
ELEVATION

4'-7"

4'-7"
Rings 874 A 4'-7" 6" 4'-7"
@ 6" c/c

PLAN 6"
4 1 x 42 x 2 84 9' - 8 " - 812.00 - - - A E

'' '' 501 21" 6" 5" 6" 5"


4 1 x 42 x 2 84 5' - 4 " - 448.00 - - - 21"

'' '' 501 8" 6" 5" 6" 5"


4 1 x 42 x 2 84 3' - 2 " - 266.00 - - - 8"

Total Length Rft 45,705.25 3,066.00 - 1,950.00 23,892.67


Weight Per Rft Kg 0.171 0.303 0.473 0.681 1.211 38.989
Weight Kg 7,795.14 929.01 - 1,328.54 28,936.51
M.Ton
Prepared by : Total Weight Kg 38,989.20
Wastage 5 %
Weight Kg 389.76 46.45 - 66.43 1,446.83 40.939
Checked by : Total Weight Kg 1,949.46 M.Ton

Unregistered version of BBS Program


Preparaed by Checked by
www.BendingSchedule.com
Page №:(5)

Type your name of company here.


Name of Project
Name of Structure
SUMMARY OF REINFORCEMENT STEEL
Size of bar T8 T10 T12 T16 T20 T25 T32 Total
Weight (Kg) 0 0 0 0 0 0 0 0

Unregistered version of BBS Program


Preparaed by Checked by
www.BendingSchedule.com
BBS Ref: Page №:(6)

Bar Description of ø of №of №of Total Cutting Weight


Code A B C D E F Shape
Mark Elements Bars Elmts Bars № length (Kg)

Unregistered version of BBS Program


Preparaed by Checked by
www.BendingSchedule.com