Tapping Day/Night Planning Month of Jan-2011

The document is a production planning table showing the scheduled operations for various parts for the month of January 2011. It includes the item names, scheduled operations, shifts, and planned production quantities for each date from the 1st to the 16th of the month. Operations included are tapping, re-tapping, cutting, drilling, broaching, deburring, and retapping. Production is planned for both day and night shifts.

Uploaded by

Mahesh Jangra
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views

Tapping Day/Night Planning Month of Jan-2011

The document is a production planning table showing the scheduled operations for various parts for the month of January 2011. It includes the item names, scheduled operations, shifts, and planned production quantities for each date from the 1st to the 16th of the month. Operations included are tapping, re-tapping, cutting, drilling, broaching, deburring, and retapping. Production is planned for both day and night shifts.

Uploaded by

Mahesh Jangra
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

TAPPING DAY/NIGHT PLANNING MONTH OF JAN-2011

SR.NO. ITEM NAME OPERATION SHIFT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15


1 Nut Tappet Ad.9Hex Tapping Day 2175 - 25055 27715 27735 24265 27715 26865 - 27275 23700 19470 24290 26945 20820
Night 17340 - 29505 29655 33060 34885 29615 34010 - 34900 5260 20155 20125 22570 26150

2 Nut Tappet Ad.10Hex Tapping Day 3460 - 3465 3465 3470 3475 3465 2600 - 3465 4100 8270 7840 7835 3470
Night 3470 - 3465 - 3460 4365 3465 4370 - 4360 5260 9635 5250 7805 8820

3 Nut Strg Stem Re-Tapping Day - - - - - - 460 - 280 - - - - - -


Night - - - - - - - - - - - - - - -

4 Plug Bearing Bush Cutting Day 253 - 436 435 420 370 406 304 - 438 437 320 336 360 387
Night 300 - 400 420 300 220 380 200 - - 350 415 400 510 425
Reamer Day 360 - 635 620 - 445 - 497 - - 128 560 470 - -
Night 520 - 664 400 660 715 640 550 - - 500 710 695 - -

5 Collar Spline Drilling Day - - - - - - 300 800 - 800 - 1050 860 1200 1000
Night 1500 - 1100 1500 1000 1100 1100 500 - 1400 1200 1500 1000 - -

Broaching Day - - 640 - 500 640 400 - - - - 720 800 720 -


Night 240 - 640 910 950 880 - - - - 720 750 850 - -

6 Guide Cl. Outer(B) Drilling Day - - - - - - - - - - - - - - -


Night - - - - - - - - - - - - - - -

Out Counter Day - - - - - - - - - - - - - - -


Night - - - - - - - - - - - - - - -

Reamer Day - - - - - - - - - - - - - - -
Night - - - - - - - - - - - - - - -

7 Guide Cl. Outer(S) Deburring Day - - - - - - - 900 - - - - - - -


Night 1200 - - - - - 500 - - - - - - - -

8 Pivot Change Pedal Drill Day - - - - - - - - - - 305 305 - - -


Tapping Night - - - - - - - - - - 810 1060 - - -
Retapping - - - 1250 1000 - - - - - 1550 1000 - - -
16
-
-

-
-

-
-