Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
179 views
Appendix VII-EMP Matrix
Signed Copy of EMP Matrix
Uploaded by
sabul1276
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF, TXT or read online on Scribd
Download now
Download
Save Appendix VII-EMP Matrix For Later
Download
Save
Save Appendix VII-EMP Matrix For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
179 views
Appendix VII-EMP Matrix
Signed Copy of EMP Matrix
Uploaded by
sabul1276
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF, TXT or read online on Scribd
Download now
Download
Save Appendix VII-EMP Matrix For Later
Carousel Previous
Carousel Next
Save
Save Appendix VII-EMP Matrix For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 5
Search
Fullscreen
Table 5: EMP Implementation Matrix for “Yamuna Expressway ee cn eed reer 1 | Tree Plentation |+ Trees to be planted on both sides ; ‘+ Trees to be planted on both sides of Expressway and + Budget allocation; ‘also median plantation + Implementation ‘+ The plantation Scheme is being worked out and is being submitled to Department of Forest Govt. of Uttar Pradesh (GoUP) for final approval from Regional office Ministry of Environment and Forest Aligan Lucknow. Z| Stipping, > The top sol vibe covered; — ‘Concessionaire | Being Implemented stocking and_— | « Top soiltobe stripped toa specified depth of | through preservation of |” 150mm Contractor top soil + Top sol to be stored in stockpiles and shall be covered. = Stockpile to be desi slope do not exceed horizontal). 3 | Guany Sites Contractorindep | Borrow area are being operated only alter necessary permission cendent from the Mining Authorities after obtaining of MiM-12 form Borrow Pits Consultant and all applicable permits Mining ‘be opened only after taking | Department. Dapariment of Mining. the approved Closure plans, © | Disposal of [+ Debris generated from construction activities | Concessionaire construction ‘shall not disposed to nearby water course; + The Construction Waste has been reused in the wastes construction onl 5 | Slope “slopes of al cuts and file areas wil | Concessionaire > Grassing is being done on slopes. Protection and | be graded and covered with stone pitching, Control of Soil ‘grass and shrub etc ErosionCoa streamicanals/any other _water_body for | Site for storage | The location, layout and basic facility provision of “Three nos. of contractor camp is located inthe non-culable and ‘each construction camp to be maintained ‘areas. ‘construcion ‘camp “The location of the contractor camp shill be restored or condition be improved prir to return of propery to the owner. | —[ pig water] Supply of suficient quantity of polabie water fas | Concessionaire | + Water supply fcity has Bean provided inthe facilty at ‘per IS) in every labor camp Contractor ‘construction and labor camp. Contractor camp | Sewerage and | Proper sanitation facies atthe construction | Contractor Proper sanfation facilies and tallets have been provided in the Sold Waste | workers camp, ‘workers eamp along with regular collection of solid wastes, disposal Collection of sisposal of solid wastes a + Safely measures shall be undertaken By Contractor ‘Road Signs and marking as per relevant IRC guidelines have Management Installing road signs and marking for safe and been planned and would be provided before opening for traffic, le ‘smooth maverent of trafic. a 70 | Noise Lever Concessionaire > Workers are provided with 6@r-plugs + New Machinery and Vehicles are being used in the construction and are aiso being maintained. ‘+ Noise Levels are being monitored regularly in ‘accordance with Approved Environment Monitoring Programme and Noise levels has been reported 10 be swthin permissible limits, 7 | ArQualiy + Wehicles covering construction materials shal | Concessionaire > Trucks carrying construction materials are covered with be covered; tarpaulin, ‘+ Water sprinkling is being done regularly for dust ‘Suppression in the construction site, Construction ‘Camps and Haulage Road strictly monitored to minimize ‘+ Hot mix and batch mix plants are more than tkm away from nearest habitation. {Z| Water Gually |» The contractor wil not excavate beds of any | Concessioneire = Compiled (BEN ieCon CC ae Construction Stage ‘+ Sedimentation cum Oil and Grease Chambers s provided atthe outfall ofthe drains faling in bodies. + Improve drainage: sides: + Avoiding obstruction of existing drains during ‘construction activi 73 | Occupational Concassionaire + Use of PPE by concemed slafi(e.g, Safety shoes, health and ‘ear-muf, gas masks, ace safely Period heath checkup of constuction ricly enforced). Three no. of workers ‘emination Prior to engagement workers undergo medical check-up, am is conducted for al the labors, und (10 am), 75 | Drainage * Provide adequate drainage structures, ‘Contractor or ‘Compiled wih System * Construct te drain along the road on both Concessioneire | Complied withOperation performance ‘Concessionaire ing period. During the concessioning ‘hall maintain the mitigation Maintenance of ‘Conesssionaire | Shall be complied with Drainage ‘Fir Qualiy Concessionaire | The Ar Gually monitoring shal be canied out in accordance with Environment Monitoring Programme. + Maintenance of road side plantation for polltion sinking; Road Side Plantation Shall be monitored for Survival rates and immediate repi be carried out Water Qualiy Monitor periodically the water quality at ‘Concessronaire | The Water Quality pollution monitoring shall be caried out locations; In accordance with Approved Environment Menitoring be taken to maintain the Programme. measures for maintaining water entation trap and Sedimentation cum grease traps. 'be provided at the outer mouth of the drains out in Water bodes. Noise Quality |» Periodie Monitoring of noise quailty at Concessionaire | The ambient noise level monitoring shall be carried out in ‘suggested locations; ‘accordance with Approved Environment Monitoring ‘+ Growing road side plantations to prevent the Programme. noise levels Road side tree plantations are expected to reduce noise levels. Prevention of road ‘control development aciviies; | Concessionaie | Construction camps areas shall be rehabi side squatiers or ‘Channel Fencing Shall be provided on be induced urban Fencing on both sides of ‘expressway, sorawis yoi on ‘Road Safely and Coe Coed rf ‘Action to be taken as per EMP “+ Prepare and administer monitoring system for road accidents; + Adequate number of signs with clear visibility ‘hall be installed. Concessionare HTMS system including VMS, CCTV and ECB willbe installed on Yamune Expressway. Road Signs are being Installed for providing necessary ‘guidance to the road users Soll erosion and Visual monitoring and inspection of sol ‘Concessionaire pection of Boro areas and slopes of ‘monitoring of ‘erosion in borrow areas and embankments hal be carried out and miigalive measures borrow areas more than 2m and piaces of hill cutting. immediate o Waintonance of |» Plantation shall be mainisined along the | Concessionaire | Regular Monitoring of Road Side and) Road Side project road; shall be carried outand dead plants st Plantation replaced {iigation Network shal be maintained regulary.
You might also like
Making of A Godol
PDF
67% (12)
Making of A Godol
316 pages
Tradesman BT2500W2 Table Saw Manual
PDF
No ratings yet
Tradesman BT2500W2 Table Saw Manual
25 pages
Music and Songs - by Tim Murphey
PDF
100% (1)
Music and Songs - by Tim Murphey
69 pages
Dick Higgins - Horizons, Intermedia
PDF
No ratings yet
Dick Higgins - Horizons, Intermedia
17 pages
State's 992
PDF
No ratings yet
State's 992
55 pages
Dictionar Englez Roman
PDF
No ratings yet
Dictionar Englez Roman
252 pages
Notice Clarion DRX8175R
PDF
No ratings yet
Notice Clarion DRX8175R
15 pages
VODOGRADNJE
PDF
No ratings yet
VODOGRADNJE
100 pages
Rosaldo - Cultural Citizenship, Inequality, and Multiculturalism
PDF
No ratings yet
Rosaldo - Cultural Citizenship, Inequality, and Multiculturalism
6 pages
Mierea Si Alte Produse Naturale
PDF
No ratings yet
Mierea Si Alte Produse Naturale
65 pages
Alinco DR-510 Instruction Manual
PDF
No ratings yet
Alinco DR-510 Instruction Manual
8 pages
C 107-6-2002 Calc - Transfer.de Masa Ate
PDF
No ratings yet
C 107-6-2002 Calc - Transfer.de Masa Ate
106 pages
Exercitii BTI0001
PDF
No ratings yet
Exercitii BTI0001
8 pages
Singer 306W Manual, 1
PDF
No ratings yet
Singer 306W Manual, 1
39 pages
More Puzzles To Puzzle You
PDF
100% (1)
More Puzzles To Puzzle You
100 pages
TW100 HF SSB Transceiver - Condensed Operator Manual 1991
PDF
No ratings yet
TW100 HF SSB Transceiver - Condensed Operator Manual 1991
29 pages
Sample Letters Langenscheidt
PDF
No ratings yet
Sample Letters Langenscheidt
75 pages
Casio Fx6200g User Manual
PDF
No ratings yet
Casio Fx6200g User Manual
60 pages
Alinco DJ-560T Instruction Manual
PDF
No ratings yet
Alinco DJ-560T Instruction Manual
16 pages
Wood Magazine - Router Basics and Beyond
PDF
No ratings yet
Wood Magazine - Router Basics and Beyond
16 pages
Dictionar Roman Grec
PDF
0% (1)
Dictionar Roman Grec
16 pages
Laser_scanner
PDF
No ratings yet
Laser_scanner
12 pages
Rachel Allen - Beadmaker Instructions - RA-BM1
PDF
No ratings yet
Rachel Allen - Beadmaker Instructions - RA-BM1
32 pages
Denah Pak Endra
PDF
No ratings yet
Denah Pak Endra
2 pages
Alinco DJ-580T Instruction Manual Part 1
PDF
No ratings yet
Alinco DJ-580T Instruction Manual Part 1
11 pages
KKS Numbering
PDF
No ratings yet
KKS Numbering
100 pages
Drept Civil - Teoria Generala A Obligatiilor - Statescu&Bars
PDF
100% (2)
Drept Civil - Teoria Generala A Obligatiilor - Statescu&Bars
244 pages
Mti SMK
PDF
No ratings yet
Mti SMK
2 pages
McQuay Eco System Training
PDF
No ratings yet
McQuay Eco System Training
336 pages
Starcraft Ghost Academy Vol. 1
PDF
100% (1)
Starcraft Ghost Academy Vol. 1
183 pages
TC Cookbook-Old Version
PDF
50% (2)
TC Cookbook-Old Version
25 pages
Piping Guide
PDF
100% (2)
Piping Guide
257 pages
Chem Revision Package
PDF
100% (2)
Chem Revision Package
115 pages
VGB450 Le Feed Water Guideline
PDF
No ratings yet
VGB450 Le Feed Water Guideline
30 pages
TM 8222 m172 25-Ton Low Bed Semitrailer
PDF
No ratings yet
TM 8222 m172 25-Ton Low Bed Semitrailer
23 pages
Amway Spring Catalogue 2011
PDF
No ratings yet
Amway Spring Catalogue 2011
13 pages
12. Gre_26071-100-Vsc-pf10-00012_jsa Installation Pipe 2023_not From Aconex
PDF
No ratings yet
12. Gre_26071-100-Vsc-pf10-00012_jsa Installation Pipe 2023_not From Aconex
39 pages
Lend Me A Tenor
PDF
No ratings yet
Lend Me A Tenor
6 pages
Percy Jackson - The Stolen Chariot - The Demigod Files
PDF
100% (1)
Percy Jackson - The Stolen Chariot - The Demigod Files
14 pages
Untitled 1
PDF
No ratings yet
Untitled 1
1 page
Aisc s340 Metric Properties of Structural
PDF
No ratings yet
Aisc s340 Metric Properties of Structural
49 pages
Limba Latina
PDF
No ratings yet
Limba Latina
82 pages
Alpha Lubricator Presentation
PDF
100% (2)
Alpha Lubricator Presentation
42 pages
Technics SUV6 Int SM
PDF
No ratings yet
Technics SUV6 Int SM
10 pages
Feasibility Study, ESIA (Environmental and Social Luuq Doolow Beled Hawo)
PDF
No ratings yet
Feasibility Study, ESIA (Environmental and Social Luuq Doolow Beled Hawo)
332 pages
Derrida - Margins of Philosophy (Eng)
PDF
80% (5)
Derrida - Margins of Philosophy (Eng)
181 pages
BS13463 1 2009 Pt1 Basic Method
PDF
No ratings yet
BS13463 1 2009 Pt1 Basic Method
38 pages
Chapter 3
PDF
No ratings yet
Chapter 3
6 pages
Aci 351.3R
PDF
100% (1)
Aci 351.3R
32 pages
Jsa Pekerjaan Piping Site Poboya PT - Apr
PDF
No ratings yet
Jsa Pekerjaan Piping Site Poboya PT - Apr
14 pages
Altenmuller Apotropaia I
PDF
No ratings yet
Altenmuller Apotropaia I
98 pages
Grafologi Book Opt (FILEminimizer)
PDF
No ratings yet
Grafologi Book Opt (FILEminimizer)
115 pages
DRESURA PASA Saharov
PDF
100% (3)
DRESURA PASA Saharov
82 pages
Vintage Chapeau Cloche Crochet Hat Pattern
From Everand
Vintage Chapeau Cloche Crochet Hat Pattern
Mamta Motiyani
No ratings yet
Appendix II (B) Forest Clearance
PDF
No ratings yet
Appendix II (B) Forest Clearance
5 pages
Jaypee Infrateach Limited-4
PDF
100% (1)
Jaypee Infrateach Limited-4
124 pages
Annexure VI - Environmental Monitoring Reports
PDF
No ratings yet
Annexure VI - Environmental Monitoring Reports
52 pages
Appendix IV - Details of Public Hearing Meeting
PDF
No ratings yet
Appendix IV - Details of Public Hearing Meeting
42 pages
Annexure VIII - Site Visit Photographs
PDF
No ratings yet
Annexure VIII - Site Visit Photographs
2 pages
Environment Clearance
PDF
No ratings yet
Environment Clearance
4 pages
Appendix III-Compliance To Clearance Conditions
PDF
No ratings yet
Appendix III-Compliance To Clearance Conditions
8 pages
Annexure I - EIA Report
PDF
No ratings yet
Annexure I - EIA Report
79 pages
Environment Clearance
PDF
No ratings yet
Environment Clearance
4 pages
Annexure IV (A) EMP IJM India
PDF
No ratings yet
Annexure IV (A) EMP IJM India
36 pages
Annexure-VIII Sanitation and House Keeping
PDF
No ratings yet
Annexure-VIII Sanitation and House Keeping
5 pages
Photoplate-I: Site Visit: Table 2.4: Details of Site Visit For Environmental Safeguards
PDF
No ratings yet
Photoplate-I: Site Visit: Table 2.4: Details of Site Visit For Environmental Safeguards
4 pages
Annexure VI Environmental Monitoring Oriental Structures
PDF
No ratings yet
Annexure VI Environmental Monitoring Oriental Structures
16 pages
Annexure IV (B) EMP-Oriental Structural Engineers Ltd.
PDF
No ratings yet
Annexure IV (B) EMP-Oriental Structural Engineers Ltd.
24 pages