0% found this document useful (0 votes)
179 views

Appendix VII-EMP Matrix

Signed Copy of EMP Matrix

Uploaded by

sabul1276
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
179 views

Appendix VII-EMP Matrix

Signed Copy of EMP Matrix

Uploaded by

sabul1276
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5
Table 5: EMP Implementation Matrix for “Yamuna Expressway ee cn eed reer 1 | Tree Plentation |+ Trees to be planted on both sides ; ‘+ Trees to be planted on both sides of Expressway and + Budget allocation; ‘also median plantation + Implementation ‘+ The plantation Scheme is being worked out and is being submitled to Department of Forest Govt. of Uttar Pradesh (GoUP) for final approval from Regional office Ministry of Environment and Forest Aligan Lucknow. Z| Stipping, > The top sol vibe covered; — ‘Concessionaire | Being Implemented stocking and_— | « Top soiltobe stripped toa specified depth of | through preservation of |” 150mm Contractor top soil + Top sol to be stored in stockpiles and shall be covered. = Stockpile to be desi slope do not exceed horizontal). 3 | Guany Sites Contractorindep | Borrow area are being operated only alter necessary permission cendent from the Mining Authorities after obtaining of MiM-12 form Borrow Pits Consultant and all applicable permits Mining ‘be opened only after taking | Department. Dapariment of Mining. the approved Closure plans, © | Disposal of [+ Debris generated from construction activities | Concessionaire construction ‘shall not disposed to nearby water course; + The Construction Waste has been reused in the wastes construction onl 5 | Slope “slopes of al cuts and file areas wil | Concessionaire > Grassing is being done on slopes. Protection and | be graded and covered with stone pitching, Control of Soil ‘grass and shrub etc Erosion Coa streamicanals/any other _water_body for | Site for storage | The location, layout and basic facility provision of “Three nos. of contractor camp is located inthe non-culable and ‘each construction camp to be maintained ‘areas. ‘construcion ‘camp “The location of the contractor camp shill be restored or condition be improved prir to return of propery to the owner. | —[ pig water] Supply of suficient quantity of polabie water fas | Concessionaire | + Water supply fcity has Bean provided inthe facilty at ‘per IS) in every labor camp Contractor ‘construction and labor camp. Contractor camp | Sewerage and | Proper sanitation facies atthe construction | Contractor Proper sanfation facilies and tallets have been provided in the Sold Waste | workers camp, ‘workers eamp along with regular collection of solid wastes, disposal Collection of sisposal of solid wastes a + Safely measures shall be undertaken By Contractor ‘Road Signs and marking as per relevant IRC guidelines have Management Installing road signs and marking for safe and been planned and would be provided before opening for traffic, le ‘smooth maverent of trafic. a 70 | Noise Lever Concessionaire > Workers are provided with 6@r-plugs + New Machinery and Vehicles are being used in the construction and are aiso being maintained. ‘+ Noise Levels are being monitored regularly in ‘accordance with Approved Environment Monitoring Programme and Noise levels has been reported 10 be swthin permissible limits, 7 | ArQualiy + Wehicles covering construction materials shal | Concessionaire > Trucks carrying construction materials are covered with be covered; tarpaulin, ‘+ Water sprinkling is being done regularly for dust ‘Suppression in the construction site, Construction ‘Camps and Haulage Road strictly monitored to minimize ‘+ Hot mix and batch mix plants are more than tkm away from nearest habitation. {Z| Water Gually |» The contractor wil not excavate beds of any | Concessioneire = Compiled (BEN ie Con CC ae Construction Stage ‘+ Sedimentation cum Oil and Grease Chambers s provided atthe outfall ofthe drains faling in bodies. + Improve drainage: sides: + Avoiding obstruction of existing drains during ‘construction activi 73 | Occupational Concassionaire + Use of PPE by concemed slafi(e.g, Safety shoes, health and ‘ear-muf, gas masks, ace safely Period heath checkup of constuction ricly enforced). Three no. of workers ‘emination Prior to engagement workers undergo medical check-up, am is conducted for al the labors, und (10 am), 75 | Drainage * Provide adequate drainage structures, ‘Contractor or ‘Compiled wih System * Construct te drain along the road on both Concessioneire | Complied with Operation performance ‘Concessionaire ing period. During the concessioning ‘hall maintain the mitigation Maintenance of ‘Conesssionaire | Shall be complied with Drainage ‘Fir Qualiy Concessionaire | The Ar Gually monitoring shal be canied out in accordance with Environment Monitoring Programme. + Maintenance of road side plantation for polltion sinking; Road Side Plantation Shall be monitored for Survival rates and immediate repi be carried out Water Qualiy Monitor periodically the water quality at ‘Concessronaire | The Water Quality pollution monitoring shall be caried out locations; In accordance with Approved Environment Menitoring be taken to maintain the Programme. measures for maintaining water entation trap and Sedimentation cum grease traps. 'be provided at the outer mouth of the drains out in Water bodes. Noise Quality |» Periodie Monitoring of noise quailty at Concessionaire | The ambient noise level monitoring shall be carried out in ‘suggested locations; ‘accordance with Approved Environment Monitoring ‘+ Growing road side plantations to prevent the Programme. noise levels Road side tree plantations are expected to reduce noise levels. Prevention of road ‘control development aciviies; | Concessionaie | Construction camps areas shall be rehabi side squatiers or ‘Channel Fencing Shall be provided on be induced urban Fencing on both sides of ‘expressway, sorawis y oi on ‘Road Safely and Coe Coed rf ‘Action to be taken as per EMP “+ Prepare and administer monitoring system for road accidents; + Adequate number of signs with clear visibility ‘hall be installed. Concessionare HTMS system including VMS, CCTV and ECB willbe installed on Yamune Expressway. Road Signs are being Installed for providing necessary ‘guidance to the road users Soll erosion and Visual monitoring and inspection of sol ‘Concessionaire pection of Boro areas and slopes of ‘monitoring of ‘erosion in borrow areas and embankments hal be carried out and miigalive measures borrow areas more than 2m and piaces of hill cutting. immediate o Waintonance of |» Plantation shall be mainisined along the | Concessionaire | Regular Monitoring of Road Side and) Road Side project road; shall be carried outand dead plants st Plantation replaced {iigation Network shal be maintained regulary.

You might also like