Operations Management: William J. Stevenson
Operations Management: William J. Stevenson
Operations Management
William J. Stevenson
8th edition
14-2 JIT and Lean Operations
CHAPTER
14
JIT and
Lean Operations
JIT/Lean Production
Goal of JIT
Ultimate A
Goal balanced
rapid flow
Supporting
Goals Eliminate disruptions
Make the system flexible Eliminate waste
Supporting Goals
Eliminate disruptions
Make system flexible
Eliminate waste, especially excess
inventory
14-7 JIT and Lean Operations
Sources of Waste
Overproduction
Waiting time
Unnecessary transportation
Processing waste
Inefficient work methods
Product defects
14-8 JIT and Lean Operations
Product design
Process design
Personnel/organizational
elements
Manufacturing
planning and control
14-10 JIT and Lean Operations
Product Design
Standard parts
Modular design
Highly capable production systems
Concurrent
engineering
14-11 JIT and Lean Operations
Process Design
Reduces inventory
Less rework
Less storage space
Problems are more apparent
Increases product flexibility
Easier to balance operations
14-13 JIT and Lean Operations
Production Flexibility
Quality Improvement
Autonomation
Automatic detection of defects during
production
Jidoka
Japanese term for autonomation
14-16 JIT and Lean Operations
Personnel/Organizational Elements
Workers as assets
Cross-trained workers
Continuous
improvement
Cost accounting
Leadership/project
management
14-17 JIT and Lean Operations
Level loading
Pull systems
Visual systems
Close vendor relationships
Reduced transaction
processing
Preventive maintenance
14-18 JIT and Lean Operations
Pull/Push Systems
Kanban Formula
DT(1+X)
N =
C
N = Total number of containers
D = Planned usage rate of using work center
T = Average waiting time for replenishment of parts
plus average production time for a
container of parts
X = Policy variable set by management
- possible inefficiency in the system
C = Capacity of a standard container
14-21 JIT and Lean Operations
Buyer
Buyer
Supplier
Supplier Supplier
Supplier
Supplier
Supplier
Supplier
Supplier Supplier
Supplier Supplier
Supplier Supplier
Supplier
14-22 JIT and Lean Operations
Obstacles to Conversion
JIT in Services
JIT II
Elements of JIT
Table 14.4
Smooth flow of work (the ultimate goal)
Elimination of waste
Continuous improvement
Eliminating anything that does not add
value
Simple systems that are easy to manage
Use of product layouts to minimize moving
materials and parts
Quality at the source
14-31 JIT and Lean Operations
Good housekeeping
Cross-trained employees
A pull system
14-32 JIT and Lean Operations
CHAPTER
14
Additional PowerPoint slides
contributed by
Geoff Willis,
University of Central Oklahoma.
14-33 JIT and Lean Operations
Kanbans
Gortrac Manufacturing
GTE3
Layout/Lean Improvements/Examples
14-35 JIT and Lean Operations
JTM5
Order System: Demand/Order Overview at McDonald’s