Terminal Management System
Terminal Management System
1
COMPUTERISATION AND INFORMATION SYSTEM (C & IS)
DIRECTORATE OF RAILWAY BOARD
2
VISION STATEMENT
3
CENTRE FOR RAILWAY
INFORMATION SYSTEMS (CRIS)
• IN 1986,Ministry of Railways established the CENTRE FOR
RAILWAY INFORMATION SYSTEMS (CRIS), Chanakyapuri, New
Delhi - 21 to be an umbrella organization for all computer
activities on Indian Railways (IR).
5
WELCOME TO FOIS
6
FOIS IS A TOOL FOR IMPROVING
EFFICIENCY IN IR
Using FOIS, the Railways have been able to
reduce the turn around time for freight
wagons from 8 days to about 5.5 days. And,
there has been a 10% jump in wagon-loading
in the past three years without needing to
add more wagons. Because the information
is directly captured digitally and is fed into a
relational database (Oracle), report can be
generated used by operational and policy
planners with whatever pivots they require.
7
FREIGHT OPERATIONS
INFORMATION SYSTEM (FOIS)
• FOIS comprises the Rake Management System
(RMS) for handling the operating portion and
Terminal Management System (TMS) pertaining to
the commercial transactions.
8
FOIS IS COMPULSORY
• As per the Railway Board Freight Marketing
Circular No.10 of 2006, all future sidings
shall have FOIS terminal.
• As per the Railway Board Freight Marketing
Circular No.16 of 2007, automatic timing
devices linked to
specified track circuits would have to be
installed by the Siding Owner (in sidings
which are working under TILES scheme) for
ascertaining placement and release timings.
9
TERMINAL MANAGEMENT
SYSTEM
Terminal Management System (TMS)
captures all commercial information relating
to goods traffic from booking to delivery
10
TMS MAIN SCREEN
11
JPO FOR TMS
THE RAILWAY BOARD FREIGHT RATE
CIRCULAR NO.2 OF 2005 CONTAINS
THE JOINT PROCEDURE ORDER FOR
TMS AND IT IS CONSIDERED TO BE AN
IMPORTANT DOCUMENT FOR TMS
WORKING.
12
DEMAND REGISTRATION IN
TMS
13
DEMAND REGISTRATION
• THE DETAILS TO BE FED INCLUDE TIME OF
REGISTRATION,CONSIGNOR CODE,GROUP RAKE
COMMODITY NAME,TRAFFIC TYPE,CONSIGNEE
CODE,TO STATION ETC.
15
F/NOTE REGISTRATION IN TMS
• NO OF WAGONS, COMMODITY
CODE,WEIGHT,ROUTE,RATE TYPE,CHARGED VIA ETC. ARE
FED IN TMS.
• WHILE SAVING THE DETAILS OF F/NOTE REGISTRATION,
THE F/NOTE NUMBER IS AUTOMATICALLY GENERATED BY
THE SYSTEM.
• THIS NUMBER IS USED FOR PLACING THE WAGONS
WHICH ARE COVERED BY THE SUBJECT F/NOTE.
• THERE ARE ADEQUATE PROVISIONS TO MODIFY F/NOTE
SUBJECT TO THE RULES IN FORCE.
• THROUGH TMS,A MAXIMUM OF 12 RAILWAY RECEIPTS
CAN BE ISSUED FOR A EIGHT WHEELED BG WAGON IN
ACCORDANCE WITH THE RAILWAY BOARD FREIGHT RATE
CIRCULAR NO.11 OF 2003.
16
OUTWARD INDEX IN TMS
17
PROVISION TO CHARGE FREIGHT CHARGES THROUGH
DIFFERENT VIAs FOR THE SAME DESTINATION
18
TMS ACCEPTS DEMAND REGISTRATION
THROUGH LSD AND WDRF
19
ALLOTMENT,RELEASE,RELEASECOMPLETE,REMOVAL & REMOVAL
CONFIRM OF WAGONS IN OUTWARD CYCLE OF TMS
• Rebates for short lead traffic can be granted in TMS without registration of
demand through repeat way bill.
• To grant all other rebates , demand should be registered through repeat way bill.
21
REPEAT WAY BILL IN TMS
22
LOADING TASK IN TMS
• AFTER COMPLETION OF LOADING, THE
FORWARDING NOTE REMARKS,NO OF
PACKAGES,ACTUAL WEIGHT ARE FED IN THE
SYSTEM.
23
FORWARDING NOTE
REMARKS
24
LOADING TASK IN TMS
25
MODIFICATION OF ENTRIES OF TMS
LOADING REGISTER
26
WEIGHMENT IN PRIVATE SIDINGS
AND TMS
• AS PER THE RAILWAY BOARD FREIGHT
RATE CIRCULAR NO.12 OF 2007, THE
ELECTRONIC-IN MOTION WEIGH
BRIDGE WHICH IS INSTALLED IN THE
PREMISES OF THE SIDING OWNER
SHOULD HAVE TO BE LINKED WITH
FOIS AT THE COST OF THE PARTY SO
THAT THE RR IS BASED ON ACTUAL
WEIGHMENT .
27
ISSUE OF RR AFTER WEIGHMENT OF
CONSIGNMENT AT WEIGH BRIDGE
• FOIS will develop an interface between the weighbridge and TMS so that the
weighment information is directly transmitted from weighbridge to the TMS system.
29
RR GENERATION
30
INVOIKING ‘EXPECTED FREIGHT’MENU OF TMS BEFORE
SAVING DETAILS OF RR GENEATION
31
GENERATION OF RR WITH CORRECT
FREIGHT CHARGES
• DURING RR GENERATION,PAID/TOPAY,VALUE OF GOODS (FOR
COLLECTION OF PCEV CHARGES),PAYMENT MODE,OTHER
CHARGES,AUTHORITY DETAILS (FOR GRANTING THE TRAIN LOAD
WHEN THE NUMBER OF WAGONS SUPPLIED ARE LESS THAN THE
PRESCRIBED STANDARD SIZE RAKE ON ADMINISTRATIVE
GROUNDS),RISK RATE ETC. ARE TO BE FED BY THE TMS USER.
• BEFORE SAVING THE DETAILS IN THE RR GENERATION SCREEN,
‘EXPECTED FREIGHT’ MENU OF TMS IS INVOKED TO ASCERTAIN
WHETHER THE MANUALLY CALCULATED FREIGHT CHARGES
TALLIES WITH THE SYSTEM GENERATED FREIGHT CHARGES.IF THE
SYSTEM CACULATED FREIGHT CHARGES ARE LESS THAN
MANUALLY CALCULATED FREIGHT CHARGES, THEN THE
DIFFERENCE BETWEEN THE TWO ARE FED AS ‘UNDERCHARGES’ IN
THE ‘OTHER CHARGES’ COLUMN OF RR GENERATION.
32
E-PAYMENT ONLY AT TMS
LOCATIONS
• E-Payment facility is available only at terminals where
Terminal Management System (TMS) has been commissioned.
33
RC 39 OF 2008 on E-PAYMENT
• The Railway Board Freight Rate Circular No.39 of 2008 gives detailed
guidelines for E-payment.
• Any rail customer having regular business with Railway may apply
to the Chief Commercial Manager (CCM) of the Zonal Railway on
which the booking station is located.
35
CUSTOMER CAN TAKE THE PRINT OUT THE RR AT HIS
DESIRED LOCATION
37
REBOOKING AND DIVERSION IN TMS
39
GOODS BALANCE SHEET IN TMS
40
TMS QUERIES
41
OUTWARD QUERIES MENUS IN TMS
42
INWARD CYCLE FROM PLACEMENT TO RELEASE
43
INWARD CYCLE FROM REMOVAL TO DELIVERY
44
NORMAL DELIVERY BOOK OF TMS
45
INWARD MENUS OF TMS
46
MESSAGE CAN BE SENT TO ALL LOCATIONS IN IR THROUGH FOIS
47
DAY END OPERATION IN TMS
49
MESSAGES AND CIRCULARS THROUGH FOIS
50
WEB REPORTS BY CRIS
51
WEB REPORTS MEANT FOR CCM
IN FOIS
52
WEB REPORTS FOR ALL
• BASED ON THE VARIOUS INPUTS OF TMS & RMS OF VARIOUS
LOCATIONS OVER IR, SEPARATE WEB REPORTS ARE GENERATED BY
OCC/CRIS/NDLS.
54
LAUNCHING OF FOIS NEWS BY SRHQ
• “FOIS NEWS”, THE QUARTERLY LEAFLET WAS LAUNCHED DURING
APRIL 2007 BY SRHQ.
55
RELEASING OF THE FIRST EVER FOIS INSPECTION REGISTER IN
IR BY SHRI.ABRAHAM JACOB, THE THEN COM/MAS ON
21.02.2007
56
RELEASING OF FIRST EVER FOIS FAILURE REGISTER IN IR ON 21.02.2007
BY SHRI.ABRAHOM JACOB THE THEN COM/MAS
57
OTHER RAILWAYS TO FOLLOW
58
MODIFICATIONS OF FOIS SOFTWARE
59
CONCLUSION OF IT VISION 2025 DOCUMENT
60
61