Prot Philsopy
Prot Philsopy
Trip Unit CB
-load rejection -over speed -Island operation Protection against external grid faults Aux.service supply is possible
-fast possible,elect. and mech.prot. -Over speed risk -stresses owing to load rejection
G E N T R I P R E L A Y 86G1
TOTRIP GT BKR TO TRIP GEN FIELD BKR TO TRIP EX.FIELD BKR TO TRIP TURBINE FAST AUTO C/ O UNIT SUPPLY
LOW FORWARD POWER RALAY (32G2) GEN OVER VOLTAGE (59 G1)(EXTREME) GEN ROTOR E/F (64R1)(2ND STAGE) GEN T/F OVER FLUXING (99 GT) GEN T/F REF(64 GT) GEN T/F BUCHHOLZ (2ND STAGE) GEN T/F O/C,BACK-UP E/F (51 GT+51NGT) GEN T/F OLTC BUCHHOLZ (2nd STAGE) GEN T/F PR.RELIEF TRIP
G E N T R I P R E L A Y 86G2
LOSS OF EXCITATION (40G) 86 G1 OPERATED 86 G2 OPERATED GEN T/F OIL,WDG TEMP HI-HI UAT OIL,WDG TEMP HI-HI
G E N T R I P R E L A Y 86G1
TO TRIP TURBINE
52GT
2ND
STEP
V/B
G E N T R I P R E L A Y 86G2
Slide 73
70 MVA 132/11KV MAIN POWER T/F
GCB LINE CT
6.6 kV SWGR
132 KV 11 KV 6.6 KV
NEUTRAL CT
CT
1 EARTH
GCB
CT10 CT9 CT38 CT 7 CT6 87G1 87G2 87TL
VT 4
VT 1,2,3
METERING AVR CH 1 27G1, 27G2, 59G1, 81G1, 96G, 99G, 64G1
GEN
CT5 CT4 CT3 CT 2 AVR CH 2, LOAD TRANSDUCER 98G, 40G1, 51G, 21G1, 50GDM, 50GLBB, 40G2, 46G 37G1, 37G2 87G2 87G1 96G, 64GIT ON NEUTRAL
1
NGR
CT1