0% found this document useful (0 votes)
21 views

VCB 1012 Engineering Drawing Project May 2011

The document provides instructions for an engineering drawing project to produce construction drawings for a bungalow. The construction drawings should include (i) a layout plan, (ii) beam details, (iii) a column details/schedule, and (iv) a foundation layout plan. All drawings must be produced on A1 size paper and plotted/printed for submission by week 14. Dimensions, layers, title blocks, and gridlines must be included appropriately according to engineering drawing standards. Students are advised to consult the instructor for any questions.

Uploaded by

Kalai Kumar
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

VCB 1012 Engineering Drawing Project May 2011

The document provides instructions for an engineering drawing project to produce construction drawings for a bungalow. The construction drawings should include (i) a layout plan, (ii) beam details, (iii) a column details/schedule, and (iv) a foundation layout plan. All drawings must be produced on A1 size paper and plotted/printed for submission by week 14. Dimensions, layers, title blocks, and gridlines must be included appropriately according to engineering drawing standards. Students are advised to consult the instructor for any questions.

Uploaded by

Kalai Kumar
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

VCB 1012 ENGINEERING DRAWING PROJECT MAY 2011

You are required to produce construction drawings for a bungalow. The construction drawing should consist of (i) Layout Plan, (ii) Beam Details, (iii) Column Details/Schedule and (iv) Foundation Layout plan. All this drawing should be produced in A1 size paper and plotted/printed for submission on stipulated date. A. Total area for the Bungalow is approximately 525 m2 [ 35m x 15m].

1. 2. 3.

Use all the appropriate symbols or commonly used for the construction drawings. Include appropriate dimensions and layers. Include appropriate title block in the drawing to define your names, drawing titles and etc. Define gridline accordingly in the drawings. The gridline must be incorpated; failure to do so will result poor marks.

You MUST submit your project, latest by the week 14.

The most important things, please do not hesitate to consult me for any query and consultation!!!