Method of Procedure CPE Installation / Removal / Modification

This document outlines the method of procedure for a CPE installation, removal, or modification. It includes details such as the start and completion dates and times, order number, circuit number, system type, central office name, technician and supervisor names, job contact number, job description, equipment summary, checklist items to review including safety precautions, disposition of removed equipment, contact numbers, actions for unusual conditions, planned outage reporting, and a post-job work assessment walk-through.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Method of Procedure CPE Installation / Removal / Modification

This document outlines the method of procedure for a CPE installation, removal, or modification. It includes details such as the start and completion dates and times, order number, circuit number, system type, central office name, technician and supervisor names, job contact number, job description, equipment summary, checklist items to review including safety precautions, disposition of removed equipment, contact numbers, actions for unusual conditions, planned outage reporting, and a post-job work assessment walk-through.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Method Of Procedure CPE Installation / Removal / Modification

Start Date:

Start Time:

Completion Date:

Completion Time:

Order Number:

Circuit Number:

System Type:

Central Office Name:

Central Office CLLI:

BAN#:

BVAPP#:

Date:

Design Engineer:

Department:

Technician (Print Name):

Supervisor ( Print Name):

Technician Contact #:

Job Description:

Method Of Procedure COE Installation / Removal / Modification

Switch Job Type


Summary of Installed Equipment:

Switch Power

Method Of Procedure COE Installation / Removal / Modification

DETAILED METHOD OF PROCEDURE - CHECK LIST OF PERTINENT ITEMS


**The following checklist shall be reviewed, completed, and signed during the job start walk-thru by the Technician Installing the Circuit and the NOC On-Site Work Force.

Place a check in the boxes as each of the following items are discussed and agreed upon:
1. 2. 3. Is building ready for installation? YES NO If no contact the C.O. Manager and/or Building Engineer (CP). Verify that no alarm conditions are present before beginning work. Alarms to be disconnected and schedule of disconnect. Establish a power/switch alarm transition plan YES NO Daily visual inspection of power/switch plant alarms YES NO Joint power/switch alarm integrity tests YES NO Safety precautions. Service restoration procedure and responsibilities in the event of service impairment. DATE

4. 5. 6. 7.

Disposition of removed equipment. Does equipment need to be RGM to TSTT? YES NO List of office and emergency contact numbers for Vendor and NOC representatives. (This list must be posted in the office as well as attached to the MOP) 8. Actions to be taken in the event that unusual conditions have occurred. If service affecting, call NOC and follow your Service Interruption process. 9. Is a planned Outage Report required? (TSTT representative responsibility) NOTE: Room should not contain re-circulating Air Return Vents. If so, contact Customer Customer Response: 10. Call NOC with End-of- Job report. 11. ** Work assessment walk-through Completed by

Date

Method Of Procedure COE Installation / Removal / Modification