The document provides survey measurements including an invert level of 210.48 at the start of a 2000mm line, total station points for a house benchmark where the machine station was at Pillar 5 and backsight was Pillar 1 with listed horizontal and vertical readings, and additional numbers that may be coordinates or measurements.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
7 views
Important Notes
The document provides survey measurements including an invert level of 210.48 at the start of a 2000mm line, total station points for a house benchmark where the machine station was at Pillar 5 and backsight was Pillar 1 with listed horizontal and vertical readings, and additional numbers that may be coordinates or measurements.
A Lightweight Interpolation Algorithm For Short-Segmented Machining Toolpaths To Realize Vibration Avoidance, High Accuracy, and Short Machiningtime PDF