Pole Test Report - 8.3

This 3 sentence summary provides the key details from the pole test report: The report documents the testing of a batch of poles, including visual inspection where some poles were rejected, and load testing of a sample pole. The tested pole satisfied acceptance criteria up to 220% of the ultimate load without any failures. Reinforcement details were verified after breaking the concrete, and the batch was accepted with the exception of the poles noted as rejected.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Pole Test Report - 8.3

This 3 sentence summary provides the key details from the pole test report: The report documents the testing of a batch of poles, including visual inspection where some poles were rejected, and load testing of a sample pole. The tested pole satisfied acceptance criteria up to 220% of the ultimate load without any failures. Reinforcement details were verified after breaking the concrete, and the batch was accepted with the exception of the poles noted as rejected.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

CEB STANDARD 044-3 : 1996

Annex - C
My No: .
Branch: .

POLE TEST REPORT


Name of the Contractor & Place of Site

Date of Testing :
Type of pole:
Working Load :
Factor of Safety :
Ultimate Load :
Place of testing:
Serial Nos. of the Test pole : ..
Serial Nos. of Branch of pole from : .. To .

INSPECTION OF POLE BATCH

(a) Whether all the poles satisfied the VISUAL INSPECTION CRITERIA Given in clause 3.2 ..
if not,
(b) Following poles have been rejected to nonconformity to aspects mentioned herein.
Serial
No.

Pole
Height

Cross
Section

Hole
Position

Hole
Size

Straightness

Finishing

Pole
Marking

Remarks

CEB STANDARD 044-3 : 1996


TEST POLE

(a) Serial No

(b)Date of Manufacture: ..

LOAD APPLIED
In kg

STAGE
1

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

25
50
75
100
0
25
50
75
100
125
150
0
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
440
480
520
560

% ULTIMATE
LOAD
0
10
20
30
40
0
10
20
30
40
50
60
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220

DEFLECTION
IN mm
0
5
10
18
22
0
8
12
19
24
30
38
3
10
14
20
27
33
38
47
61
84
112
135
160
182
218
242
260
315
365
418
518

REMARKS

CEB STANDARD 044-3 : 1996


01. Whether any hair crak/cracks developed during the application of load up to 40% of the
ultimate load:No..
02. Whether the hair cracks produced while loading up to 60% of the ultimate load, have
closed:No

03. Permanent set after 60% of the ultimate load : .mm


04. Test Load at the destruction of the pole : kg
05. Verification of reinforcement after braking of the concrete of the test pole

01)

A) Main Reinforcement
Type

02) Diameter 10mm. 03) Lap length

mm 04) Lap Positioning

B) Stirups

01) Diameter 5.5 mm 02) Spacing 140,130,90mm


Whether the tested pole satisfied the acceptance criteria: Yes..

If not what is the pole No. Selected for second test:..

In view of the above, this batch of poles is accepted / rejected with the expectance of the rejected pole /
poles mentioned in page 01 of this report and the tested pole.

Name and designation of CEB


Testing officer / Engineer

: ..

Signature:

: ..

Tested in the presence of


(Name of contractor of his agent)

Signature:

: ..............................

Date :