100% found this document useful (1 vote)
898 views

Sop For Recovery Test

This standard operating procedure outlines the recovery test process to determine the initial cleanup mode of clean rooms and controlled environments. Staff in the engineering department are responsible for taking temperature, relative humidity, and particulate matter readings before and after starting the air handling unit at set intervals. The recovery period is the time required for these environmental factors to reach minimum acceptance criteria levels after starting the air handling unit.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
898 views

Sop For Recovery Test

This standard operating procedure outlines the recovery test process to determine the initial cleanup mode of clean rooms and controlled environments. Staff in the engineering department are responsible for taking temperature, relative humidity, and particulate matter readings before and after starting the air handling unit at set intervals. The recovery period is the time required for these environmental factors to reach minimum acceptance criteria levels after starting the air handling unit.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

STANDARD OPERATION PROCEDURE

No. : ENGP-218 Version No.:01 Supersedes NIL PURPOSE: Procedure for RECOVERY TEST to decide initial cleanup mode. SCOPE: Applicable to all Clean rooms and controlled Environments. RESPONSIBILITY: Engineering Department Staff. DEFINITION: Room in which the concentration of airborne particle is controlled. Which is constructed and used in a manner to minimize the introduction, generation retention of particles inside the room, in which other relevant parameters for e.g. temperature, humidity and pressure area controlled as necessary. Initial Cleanup Period/Recovery Period: Time required to achieve the Temperature, Relative humidity and Particulate Matter Count level to minimum acceptance criteria after starting AHU. PROCEDURE: Take the following readings before starting AHU of clean room at five locations. Temperature, Relative Humidity and Particulate Matter Count. Switch ON the AHU of Clean rooms. After 10 min of AHU operation take readings of Temperature, Relative humidity and Particulate Matter Count at same five locations. After 20 min of AHU operation take readings of Temperature, Relative humidity and Particulate Matter Count at same five locations. Date Of Issue

RECOVERY TEST

Effective Date Page 1 of 2

PREPARED BY Department Head Date:

APPROVED BY Quality Assurance Date:

AUTHORISED BY Unit Head Date:

STANDARD OPERATION PROCEDURE


No. : ENGP-218 Version No.:01 Supersedes NIL Date Of Issue

RECOVERY TEST

Effective Date Page 1 of 2

Observe the readings of Temperature, Relative humidity and Particulate Matter count. Find the time from and at which Temperature, Relative humidity and Particulate matter count have been controlled to acceptance level i.e. Recovery Period. If the above conditions is not achieved take the readings at the interval of 10 minutes.

FREQUENCY : -----------ABBREVIATIONS: AHU : AIR HANDLING UNIT

REFERENCES :-----------ANNEXTURE : ------------

PREPARED BY Department Head Date:

APPROVED BY Quality Assurance Date:

AUTHORISED BY Unit Head Date: