Are You Ready? 2012 Building Code Requirements For New Construction
Are You Ready? 2012 Building Code Requirements For New Construction
Energy Efficiency
If you apply for a building permit on or after January 1, 2012, the proposed construction must conform with enhanced energy efficiency requirements of Ontarios Building Code. The 2006 Ontario Building Code set out a roadmap for energy efficiency to be implemented from January 1, 2006 through to December 31, 2011. As part of that roadmap, the Code set out energy efficiency benchmarks for houses and for large buildings. Subsequent Code amendments provided additional compliance paths that are consistent with those benchmarks. The Building Code provides that construction for which an application for a building permit is made on or after January 1, 2012 must meet the following energy efficiency requirements: o Houses and other Part 9 residential buildings intended for occupancy on a continuing basis during the winter months must meet the performance level that is equal to a rating of 80 or more when evaluated in accordance with EnerGuide801 (based on the Hot 2000 V9.34c1,2 software) or conform to Supplementary Standard SB-12, which is referenced in the Building Code. The alternative compliance paths set out in this Supplementary Standard are referenced in an amendment to the Building Code which came into force on January 1, 2010. For more information about the updated Supplementary Standard SB-12 follow the link to Service Ontarios publications site at http://www.publications.serviceontario.ca/ecomlinks/510090.pdf. o Other buildings (including Part 3 residential and commercial buildings) must conform to Supplementary Standard SB-10 (July 1, 2011 update), which is referenced in the Building Code. This Supplementary Standard indicates that the energy efficiency of these buildings shall be at least 25% greater than the
the EnerGuide rating system was developed by Natural Resources Canada to evaluate the energy efficiency of houses
1
energy efficiency levels attained by conforming to the 1997 Model National Energy Code for Buildings, but provides additional compliance paths to achieve them. The updated Supplementary Standard SB-10 is referenced in an amendment to the Building Code which came into force on July 1, 2011. For more information about the updated Supplementary Standard SB-10 follow the link to the Ministry of Municipal Affairs and Housings Building Code website at http://www.mah.gov.on.ca/Page9528.aspx If Code Users havent done so already, they may wish to participate in technical training courses on the Building Codes energy efficiency requirements developed by MMAH and offered by stakeholder organizations such as the Ontario Building Officials Association and community colleges. The Ontario Building Officials Association link to their training information is: http://www.oboa.on.ca/cgi-bin/news2/#a41. Related information is on the Ministry of Municipal Affairs and Housings Building Code website at http://www.mah.gov.on.ca/Page8526.aspx. Other technical training may also be offered by professional and building sector organizations. The Ontario Home Builders Association, for example, can help builders to find out about such opportunities. For more information follow the link to the Ontario Home Builders Association website at http://ohba.ca/ontario-buildingcode-training.
Houses covered under these provisions would include detached, semi-detached and townhouses that meet the criteria outlined above. The provisions will not apply to an existing building, or part thereof, that has been subject to extension, or material alteration or repair. This means that both the existing part of a building and an addition to a building, subject to extension, material alteration or repair, would not be subject to an occupancy permit. The amendments to the Code include criteria that must be met before an occupancy permit can be issued. Sentence 1.3.3.4 (5), Division C, sets out those building components that must be substantially complete, complete, installed or operational, as the case may be, before issuance of an occupancy permit. The amendments also add a new prescribed notice, which is the completion of construction and installation of components required to allow for the issuance of an occupancy permit. Also, amendments to the Building Code include a new additional notice stage, which allows a municipality through a bylaw, to require a notice upon the final completion of a building for which an occupancy permit has already been issued. Supportive information including a model Occupancy Permit that municipalities may wish to use, as well as checklists and best practice information for building officials, is being developed by the Occupancy Permit Working Group established by the Large Municipalities Building Official Association (LMCBO). This Working Group is composed of building officials and is chaired by Techa van Leeuwen, Director of Building and Bylaw Services at the Town of Aurora. Documents prepared by the Working Group will be available on the LMCBO/TACBOC website soon.