0% found this document useful (0 votes)
31 views

Ahp Status 5 Jan

The document provides a status update on an AHP project as of January 5th, 2012. It summarizes the drawing status, with over 80% of drawings submitted and approved, material status with few items received, and erection status which has not yet begun. The majority of pending items are vendor drawings for electrical equipment.

Uploaded by

Vinodh Crescent
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

Ahp Status 5 Jan

The document provides a status update on an AHP project as of January 5th, 2012. It summarizes the drawing status, with over 80% of drawings submitted and approved, material status with few items received, and erection status which has not yet begun. The majority of pending items are vendor drawings for electrical equipment.

Uploaded by

Vinodh Crescent
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

AHP STATUS AS ON 05-01-2012

1. DRAWING STATUS: TOTAL DRAWINGS Drawings submitted Approved drawings INFORMATION CATEGORY PENDING DRAWINGS % OF COMPLETION
Pending from MB Vendor Drawings for PMCC Vendor Drawings for MCC Vendor Drawings for Battery Charger Vendor Drawings for 7.2KV Bus Duct Vendor Drawings for 415V Bus Duct Data Sheets of Lighting Fixtures Cable Interconnection diagram QAP of PMCC/MCC panels QAP of Battery charger 1-Jul-11 1-Jul-11 1-Jul-11 11-Jul-11 11-Jul-11 6-Aug-11 15-Sep-11 1-Jul-11

86 Nos 76 Nos 51 Nos 23 Nos 10 Nos 88%

2.MATERIAL STATUS : SUPPLY -70 NOS

MATERIALS RECEIVED 11 /6.9 Kv Transformer 5 MVA, ONAN type 11KV & 6.6KV HT Cables % OF COMPLETION -1 No -2Nos

- 03NOS

- 4%

3. ERECTION STATUS:

-NIL