This document is a daily report from a construction site that provides information on work progress, weather conditions, workforce details, delays, inspections, safety meetings, and accidents for a given date. It notes the number of workers and hours, describes the day's activities and quantities, and indicates if any delays, changes, or issues occurred along with relevant details. Signatures from supervisors are included to confirm the report information.

Uploaded by

dhanendrapardhi
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Daily Report Format by DKP

This document is a daily report from a construction site that provides information on work progress, weather conditions, workforce details, delays, inspections, safety meetings, and accidents for a given date. It notes the number of workers and hours, describes the day's activities and quantities, and indicates if any delays, changes, or issues occurred along with relevant details. Signatures from supervisors are included to confirm the report information.

Uploaded by

dhanendrapardhi
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DATE

NAKILAT
NSRY / NSCF

DAILY REPORT Work Finish Time:


Date: REPORT NUMBER: M/C CODE: DAY:

Work Start Time:


Job Details: Location:

Weather Report:

Temperature: High Low o o

WORK FORCE

No. of Men

No. of Hours

* Was work delayed for any reason?


.

If yes, describe

* Was stoppage ordered in writing?

If so, by whom?

* Were verbal instructions received:

If yes, describe

Other:
* Has letter confirming verbal instructions been written? No. of No. of Hours * Have you given any Subcontractor special written or verbal instructions? If so, describe

(SUBCONTRACTOR)

Men

* Were any change orders received or implemented today? If yes, describe change order,

* Was WORK delayed because of lack of: Materials Information Interference Other Trades Subcontractors Other Reasons * If so, describe

Tests/Inspections

* Was any Subcontractor scheduled to start or material due to arrive which did not appear? If so, describe

* Were you required to do Extra Work? Was it authorized? Should it be backcharged? Visitors-Names Representing If so, describe

* Vendor Rental Equipment on Site

* Was tool box talk held today? Topics:

* Were there any lost time accidents recorded today?

Describe day's activities giving quantities, location of work, trades involved, etc.

Remarks:

Name Signature

Name Signature