Construction Logic
Construction Logic
Waterproofing & protection of Pile head & PCC Shutter for Raft Concreting of Pile Cap & Raft Slab
super -structure
Slab (1) Verticals (1) Slab(2) Verticals (2)
Staircase (1)
Staircase (2)
External Plaster
External finishes
External Paint
1st fix
-Installation of Frames
balconies envelope
Plaster
Waterpro ofing
Floor Tile
Paint Prime
other finishes
final finishes
Block Work
Internal Plaster
Staircase
Staircase Finishes
Vanity Unit
tiling work
interior finishes
Kitchen Cabinet carpentry & joinery Door Subframes Door Frames & Architrives Door Shutter & Ironmogery
Wardrobes
suspended ceiling
1st
2nd
final
Buy SmartDraw!- purchased copies print this document without a watermark . Visit www.smartdraw.com or call 1-800-768-3729.
HVAC system
FCU FCU Installation CHW Pipe Connection of FCU Grills & Diffusers
2nd
final
mechanic al
Water Supply Pipe Installation piping system Fire Fighting Pipes Installation
1st fix LV & ELV System electrical Install floor LV / ELV Conduits Install Walls LV / ELV Conduits
Installation of Supports for Busbar Risers Risers Busbar Risers Installation of Busbar
Fire & Voice Alarm Cables IT cables ELV System Riser BMS Cables
Security cables
Testing& Commisionin g
snagging