0% found this document useful (0 votes)
9 views

Preliminary Buffer

The document discusses preliminary and follow-up buffers for maintenance package due dates. A preliminary buffer of 5 days allows activities to start before the due date without changing subsequent dates, while a follow-up buffer of 5 days permits finishing activities after the due date without changing later dates. For a maintenance package with a planned date of September 30th, the preliminary buffer yields a start date of September 25th and the follow-up buffer gives an end date of October 5th.

Uploaded by

asu560
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Preliminary Buffer

The document discusses preliminary and follow-up buffers for maintenance package due dates. A preliminary buffer of 5 days allows activities to start before the due date without changing subsequent dates, while a follow-up buffer of 5 days permits finishing activities after the due date without changing later dates. For a maintenance package with a planned date of September 30th, the preliminary buffer yields a start date of September 25th and the follow-up buffer gives an end date of October 5th.

Uploaded by

asu560
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Preliminary Buffer The preliminary buffer specifies how long before the due date for the maintenance

package the activities can be started, without the subsequent due dates being changed. You specify a preliminary buffer of 5 days for each maintenance package in the strategy. The planned date calculated by the system is September 30. The start date proposed in the maintenance order is therefore September 25. Follow-up Buffer The follow-up buffer specifies how long after the maintenance package is due the processing of the activities can be finished, without the subsequent due dates being changed. You specify a follow-up buffer of 5 days for each maintenance package in the strategy. The planned date calculated by the system is September 30. The end date proposed in the maintenance order is therefore October 5.