0% found this document useful (0 votes)
3K views

Production Schedule

The production schedule outlines the filming schedule for the music video for Adele's "One and Only". It includes 11 filming sessions from September 2011 to March 2013 at various school and park locations. The schedule details the activities, locations, crew, equipment and props needed for each session, including practicing and filming scenes of the actress singing and playing piano, filming with a green screen, and additional pick-up sessions to re-film some scenes.

Uploaded by

natalie_ern93
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views

Production Schedule

The production schedule outlines the filming schedule for the music video for Adele's "One and Only". It includes 11 filming sessions from September 2011 to March 2013 at various school and park locations. The schedule details the activities, locations, crew, equipment and props needed for each session, including practicing and filming scenes of the actress singing and playing piano, filming with a green screen, and additional pick-up sessions to re-film some scenes.

Uploaded by

natalie_ern93
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Production Schedule

Title of Media Project: Adele One and Only Music Video Production by: FIVE STAR* Productions Date
Monday 12th September Tuesday 27th September 2011

Time
11:10 am 12:50 pm 11:10 am 12:50 pm

Activity
Practice Filming Filming Of first two scenes & run through of song taking various shots Filming of actress playing piano and singing scenes & run through of song taking various shots

Location
School Hall

People Required
All film crew and Cast

Props/Equipment Required
Camera, Tri Pod,

Other Items (or a To Do List)


Grand Piano

School Hall

All film crew and Cast

Camera, Tri Pod,

Grand Piano

Monday 10th October 2011

11:10 am 12:50 pm

School Hall

All film crew and Cast

Camera, Tri Pod

Grand Piano

Monday 17th October 2011

Monday 24th October 2011

9:30am 12:50pm (estimated time) 9:30am 12:50pm (estimated time)

Use Green Screen (Practice) Filming Using Green Screen Take Picture for location report - Film scenes

School Drama room

All film crew and Cast

Camera, Tri Pod, Green screen

School Drama room

All film crew and Cast

Camera, Tri Pod

Grand Piano

Saturday 22nd October 2011

Forty hall park

All film crew and Cast

Camera, Tri Pod

Sunday 30th October 2011

Forty hall park

All film crew and Cast

Camera, Tri Pod

BELOW ARE THE ADDITONAL FILMING SESSIONS DUE TO CHANGES


Monday 7th February 2012 9:30 10:45 (Estimated time 11:10 12:30 (Estimated time) 3:30 4:30 (Estimated time) Monday 5th March 2012 Re Film some scenes of the actress playing the piano Re film of singing and piano performance Film corridor scenes with male actor and main character School Dinner Hall All film crew and Cast Camera, Tri Pod School dinner hall All film crew and Cast Camera, Tri Pod

Tuesday 6th March 2013

School corridor

All film crew and Cast

Camera, Tri Pod