Lighting Loads

This document contains lighting load data for two phases of an energy saving project. For phase one, it lists the lighting loads in amps for various locations identified as LP and RP for two main load distribution boards across the R, Y, and B phases. The total lighting loads for each phase are also given. For phase two, it provides the current draw in amps for various lighting circuits identified by location for two main load distribution boards, along with a description of each circuit. It also lists the lighting loads for additional locations in the later part of phase two.

Uploaded by

Pradeep Nair
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views

Lighting Loads

This document contains lighting load data for two phases of an energy saving project. For phase one, it lists the lighting loads in amps for various locations identified as LP and RP for two main load distribution boards across the R, Y, and B phases. The total lighting loads for each phase are also given. For phase two, it provides the current draw in amps for various lighting circuits identified by location for two main load distribution boards, along with a description of each circuit. It also lists the lighting loads for additional locations in the later part of phase two.

Uploaded by

Pradeep Nair
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Lighting Loads for Energy Saver

Lighting Loads in Phase-I


MLDB#1 R-PHASE Y-PHASE B-PHASE
LP-1
LP-2
LP-4
LP-7
LP-9
LP-11
LP-12
RP-1
RP-2
Total

3.44
0.01
8.86
5.98
2.62
13.52
6.91
0.32
0.02
41.68

23.08
12.48
5.31
4.58
8.69
13.41
13.49
4.37
0.47
85.88

13.4
13.71
5.9
4.58
1.2
19.15
9.19
0.03
0.04
67.2

MLDB#2 R-PHASE Y-PHASE B-PHASE


LP-3
LP-6

16.97
2.2

13.41
5

3.9
8.9

LP-8
LP-10
LP-14
LP-16
LP-17
LP-22
RP-4
Total

5.3
13.17
3.3
9.2
8.3
0.3
0
58.74

3.1
11.65
5.6
13.2
8.4
4.7
5.8
70.86

1.8
0.33
0.5
22
6.9
1.8
0.5
46.63

Lighting Loads in Phase-II


MLDB#1
2F4
2F5
2F6
2R2
2R3
2R4
2R5
2R8

Description
STG 11mtr
Steet
UPS
ECB 12.45mts
ECB 0mts
ECB 3.15mts
ECB 7.45 mts
STG 5.5 m
Total Current

R(Amp)
2.8
0
7.6
5.3
0.8
3.2
3.5
7.04
30.24

Y(Amp)
7.18
2.25
9.6
8.2
2.6
1.5
2.7
0
34.03

B(Amp)
5
4.34

MLDB#2
2R2
2R5
2F3

Description
BFP
HRSG
GT area

R(Amp)
4.3
23.7
5

Y(Amp)
2.7
14.8
7.9

B(Amp)
11.43
29.7
3

2.2
9.3

4.9
3

6.9
8

1.2
45.7

3
36.3

4.7
63.73

R(Amp)
2.8
7.43
5
0
15.23

Y(Amp)
0
1.4
4.4
0
5.8

B(Amp)
3.2
6.18
6.44
0.11
15.93

2F4
2F5
2F6
2F7

GIS
NLP1
NLP2
NLP3
NLP3

300MVA
Transformer area
STG 0mts
Photo cell suplly
Gas skid
Total Current
Description
Outdoor
Outdoor
Indoor
Indoor
Total Current

4.6
11.3
2.9
2.7
9.6
40.44