0% found this document useful (0 votes)
79 views

A Three Days Workshop On Contract Management

This 3-day workshop provides an overview of contracts management using MPW Conditions of Contract and FIDIC forms. Day One covers basic contract elements, classifications, risks and relationships. Day Two focuses on MPW and FIDIC 1987 conditions, terms, subcontracts, and drafting contracts. Day Three examines FIDIC 1999 forms, claims procedures, and the engineer's role in assessing claims. The workshop concludes with certificates distributed to participants.

Uploaded by

fareed_imadi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views

A Three Days Workshop On Contract Management

This 3-day workshop provides an overview of contracts management using MPW Conditions of Contract and FIDIC forms. Day One covers basic contract elements, classifications, risks and relationships. Day Two focuses on MPW and FIDIC 1987 conditions, terms, subcontracts, and drafting contracts. Day Three examines FIDIC 1999 forms, claims procedures, and the engineer's role in assessing claims. The workshop concludes with certificates distributed to participants.

Uploaded by

fareed_imadi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

A Three Days Workshop on

Contracts Management using MPW Conditions of Contract / FIDIC


By Eng. Mohammed Fareedul Haq Imadi

B.E (Civil Engineering) , PMI-SP, PMI-RMP, PMP, CCE, AVS, FIE

Day One
Introduction of the Workshop and brief ground rules Session 1 : Basic Elements of Contract Session 2 : Classification of Contracts, Mistakes and Frauds Session 3 : Risks, Roles and Relationships Session 4 : Strategic Selection of Type of Contract
Tea Break Break for Lunch and Friday Prayer Tea Break

Day Two
Session 1 : MPW and FIDIC 1987 Conditions of Contract Session 2 : Contract Terms and Conditions Session 3 : Template of Subcontract Agreement Session 4 : Drafting a Contract
Tea Break Break for Lunch and Friday Prayer Tea Break

Day Three
Session 1 : Overview of FIDIC Contracts (1999) Session 2 : Which Form of FIDIC to use when Session 3 : Claims Procedures
Tea Break Break for Lunch and Friday Prayer Tea Break

Session 4 : Engineers Assessment and Principles of Claims Conclusion and Certificate distribution

You might also like