0% found this document useful (0 votes)
314 views2 pages

Free Sap Tutorial On MRP Run

To activate material requirements planning (MRP), requirements planning must be turned on in customizing, plant parameters must be set up for the relevant plant, and materials subject to automatic planning must be assigned an MRP type other than "not planned" in the material master. During an MRP run, the system will check for a planning file for each material, determine reorder points and lot sizes, calculate order quantities and timing based on forecast and current inventory levels, and generate planned or purchase orders as needed through external or internal procurement processes.

Uploaded by

Anirudh Singh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
314 views2 pages

Free Sap Tutorial On MRP Run

To activate material requirements planning (MRP), requirements planning must be turned on in customizing, plant parameters must be set up for the relevant plant, and materials subject to automatic planning must be assigned an MRP type other than "not planned" in the material master. During an MRP run, the system will check for a planning file for each material, determine reorder points and lot sizes, calculate order quantities and timing based on forecast and current inventory levels, and generate planned or purchase orders as needed through external or internal procurement processes.

Uploaded by

Anirudh Singh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MRP PREREQUISITES

Requirements planning for the corresponding plant must be activated in Customizing for Materials Management under Consumption-Based Planning Planning Activate Material Requirements Planning. The plant parameters for the corresponding plant must be activated in Customizing for Materials Management under Consumption-Based Planning Plant Parameters Carry Out Overall Maintenance of Plant Parameters.

In the material master record, you have to maintain the MRP data of the materials that are subject to automatic planning. Automatically planned materials are not assigned with MRP type ND (= not planned).

MRP RUN
During the MRP Run the system will check the Planning file entry exist for the material or not, If Yes No

Re Order point planning Whether to Order MRP Type Forecast based planning Time Phased planning

Lot for Lot Fixed Lot Static Lot Size Periodic Optimizing Replenish to max

How much to Order

When to Order

Purchasing Processing Time - FC Scheduling Planned Delivery Time- NC GR Processing Time - FC

How to Order

External Procurement (PR to PO)

Planned order to PR conversion

Internal Procurement (Planned order to Order)