Gate Pass Request Document

Bureau Veritas (India) Pvt. Limited requests an extension of staff and vehicle gate passes from the Vice President of Projects at BALCO-III Smelter Expansion Project until September 30, 2012. The current gate passes are set to expire on June 30, 2012 but Bureau Veritas' work order has not been extended yet. Bureau Veritas also provides copies of medical checkup reports and safety induction formats for staff and drivers to BALCO for their records. Finally, Bureau Veritas requests permission to prepare a new replacement gate pass for an office printer that was brought through the SEPCO Gate as the original gate pass was misplaced.

Uploaded by

kadhikari68
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

Gate Pass Request Document

Bureau Veritas (India) Pvt. Limited requests an extension of staff and vehicle gate passes from the Vice President of Projects at BALCO-III Smelter Expansion Project until September 30, 2012. The current gate passes are set to expire on June 30, 2012 but Bureau Veritas' work order has not been extended yet. Bureau Veritas also provides copies of medical checkup reports and safety induction formats for staff and drivers to BALCO for their records. Finally, Bureau Veritas requests permission to prepare a new replacement gate pass for an office printer that was brought through the SEPCO Gate as the original gate pass was misplaced.

Uploaded by

kadhikari68
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

BUREAU VERITAS (INDIA) PVT.

LIMITED

To The Vice President (Projects) BALCO- III Smelter Expansion Project, Plant II/CPP-II, 1200 MW Project, Balco Nagar, Korba Kind Attention; Mr S.N Gupta, Coordinator for BVIL

Dear Sir, Sub: Request for renewal of Staff & vehicle gate passes up to 30-09-2012 Ref: LOI / Work Order No. Agreement 6600000121 dated 14/05/09. We are delivering third Party services at BALCO Smelter Expansion Project vide LOI / Work Order No. Agreement 6600000121 dated 14/05/09, which was expired on 30/03/2012. As our entry pass are renewed up to 30/06/2012 with your permission and as on date we have not received our work order extension and keeping progress of work in view we request you to extend the validity of the gate passes of staff, driver and vehicles accordingly, preferably 30th September 2012
Thanking You Sir Yours faithfully

(G.SRINIVASULU)
PROJECT MANAGER, BVIL BALCO NAGAR, KORBA

BUREAU VERITAS (INDIA) PVT. LIMITED

To The Vice President (Projects) BALCO- III Smelter Expansion Project, Plant II/CPP-II, 1200 MW Project, Balco Nagar, Korba Kind Attention; Mr B. SIVA KUMAR, Head, HSE, BALCO Dear Sir, Sub : Submission of copy of Medical Checkup report and safety induction formats of Staff & Drivers for your record Ref: LOI / Work Order No. Agreement 6600000121 dated 14/05/09. Please find the attached copies of Medical checkup Reports and safety induction formats of our staff and Drivers for your information and record. Please acknowledge this copy
Thanking You Sir Yours faithfully

(G.SRINIVASULU)
PROJECT MANAGER, BVIL BALCO NAGAR, KORBA

BUREAU VERITAS (INDIA) PVT. LIMITED

To The Vice President (Projects) BALCO- III Smelter Expansion Project, Plant II/CPP-II, 1200 MW Project, Balco Nagar, Korba Kind Attention; Mr S.N Gupta, Coordinator for BVIL

Dear Sir, Sub: Sub: Request for issue of NRGP through SEPCO Gate Ref: LOI / Work Order No. Agreement 6600000121 dated 14/05/09. We are delivering third Party services at BALCO Smelter Expansion Project vide LOI / Work Order No. Agreement 6600000121 dated 14/05/09, for our office work we have brought a HP laser jet Scanner and Printer, bearing serial number CNG895NOBW through SEPCO Gate.. As the original gate pass of this printer was misplaced, we request your permission to prepare NRGP based on Xerox copy of this Gate pass Your cooperation for taking out this printer for maintenance is requested
Thanking You Sir Yours faithfully

(G.SRINIVASULU)
PROJECT MANAGER, BVIL BALCO NAGAR, KORBA