Summary of Bitumen Spraying Rate Test Results For The Period .... / .... / . To ../ ../ .
Summary of Bitumen Spraying Rate Test Results For The Period .... / .... / . To ../ ../ .
C&S Engineer:
Contractor:
Project:
SUMMARY OF BITUMEN SPRAYING RATE TEST RESULTS For the period ..../..../. to ../../..
Item No. Chainage Test No. Date From To Total Length (m) Width (m) Total area (m2) Bitumen Sprayed (Itr.) Spraying Rate (Itr./m2)
Client:
C&S Engineer:
Contractor:
Project:
Remarks : .. ...
Client:
C&S Engineer:
Contractor:
Project:
Client:
C&S Engineer:
Contractor:
Project:
Client:
C&S Engineer:
Contractor:
Project:
Client:
C&S Engineer:
Contractor:
Project:
Item No.
Client:
C&S Engineer:
Contractor:
Project:
TOTAL
Client:
C&S Engineer:
Contractor:
Project:
Original Ground Level (Plate Level) (mm) : Thickness of Fill Required (mm) - (including sand + surcharge) : Surcharge Reduced Level (m) :
(d) (e) (f) Settlement (mm)
Date
Height From Top Length of Rods of Rod to Fill (mm) Level (mm)
Total Fill Total Fill Thickness incl. Thickness (mm) Settlement (mm)
Day
Note :
1. 2. 3.
Col (c) = Col (a) - Col (b) Col (e) = Col (d) - Col (c) Col (f) = Col (b) - Original Ground Level
Remarks : . .
QR.SDR.M3
Client: C&S Engineer: Contractor: Project:
II. PLANT / EQUIPMENT / VEHICLES ON SITE Type (Capacity / Model / Make) Unit Working Hours Conditions ( See # 1 below)
Page 12
QR.SDR.M3
IV. WORK FORCE WORKING ON SITE Trade Project Manager Site Engineer Supervisor Foreman Surveyor Chainman Nos. Trade General Workers Mechanic Electrician Carpenter Bar Bender Rigger Nos. Trade Painter Plumber Nos.
Page 13
QR.SDR.M3
Driver Truck Driver Machinery Operator Mason Roofer Welder Male Labourer Female Labourer Bricklayer Pavior
VIII. VISITORS Name & Designation Time From To Name & Designation Time From
Page 14
QR.SDR.M3
..
Page 15
QR.SDR.M3
Comments
Page 16
QR.SDR.M3
Quantity
Time To
Page 17
QR.SDR.M3
Page 18
QR.SDR.M3
Page 19
QR.SDR.M3
Page 20
QR.SDR.M3
Page 21
Client:
C&S Engineer:
Contractor:
Project:
II. PLANT / EQUIPMENT / VEHICLES ON SITE Type (Capacity / Model / Make) Unit Working Hours Conditions ( See # 1 below) Working Location
III. ACTIVITIES / ITEMS INSPECTED Work / Items A) LONG MENAPA Location Comments
MANPOWER :
B) LONG LUAR
MANPOWER :
C) LONG TANGAU
PROJECT :
INSPECTION REPORT
WORK / OPERATION INSPECTED
TIME
Name : .. Position : .. Date : CHECKS COMMENTS (Deficiencies, Degree of 1 2 3 4 5 6 7 8 9 Completion, Weather, Other)
Check List 1. Setting Out 2. Prior Work 3. Dimensions 4. Equipment 5. Labour 6. Materials 7. Testing 8. Compaction 9. Workmanship
Checked By (Contractor) :
Client:
C&S Engineer:
Contractor:
Project:
CHECK LIST
Item No. 1st Inspection Description of Works OK Approval Chit Ref. No. 1 SITE PREPARATION (a) Setting Out 2 SITE CLEARING (a) Clearing of Trees and Shrubs (b) Grubbing (c) Removal of Stumps/Roots (d) Disposal of Cleared Vegetation (e) Temporary Drainage 3 EARTH WORK (a) Filling Material Used (b) Level Not OK OK Not OK 2nd Inspection REMARKS
General Comments:
Client:
C&S Engineer:
Contractor:
Project:
CHECK LIST
Item Description of Works 1st Inspection OK Approval Chit Ref. No. : 1 1a 1b Pile Location : Setting Out/Alignment Position of Peg Not OK 2nd Inspection OK Not OK REMARKS
2 2a 2b
3 3a 3b
4 4a 4b
5 5a 5b
6 6a 6b
General Comments:
Client:
C&S Engineer:
Contractor:
Project:
Hammer Penetration Drop (m) 17.5 18.0 18.5 19.0 19.5 20.0 20.5 21.0 21.5 22.0 22.5 23.0 23.5 24.0 24.5 25.0 25.5 26.0 26.5 27.0 27.5 28.0 28.5 29.0 29.5 30.0 30.5 31.0 31.5 32.0 32.5 33.0 33.5 34.0
Client:
C&S Engineer:
Contractor:
Project:
CHECK LIST
Inspection by Contractor Item No. Inspection by Clerk of Works Date: Time: ST: OK Approval Chit Ref. No. : 1 (a) (b) 2 (a) (b) (c) (d) (e) 3 (a) (b) 4 (a) (b) (c) (d) (e) (f) 5 (a) (b) (c) (d) 6 (a) 7 8 9 10 (a) (b) (c) (d) (e) Setting Out / Position Alignment Lines & Levels Formwork Dimension level, verticality Adequately supported or propped Joints tightness Surface of forms acceptable All sawdust & rubbish removed Blinding Dry and clean Correct level and thickness Reinforcement Correct grade, size, number Correct lap/anchorage length Adequate chairs, spacers, etc Cover as required No mud, oil, loose rust, etc Damp proof course M & E Opening & Pipe Sleeves Electrical conduits Soil & waste pipe Cold/hot water plumbing RWDP Curing PVC cover, gunny sack & watering Bond Tie Construction Joint Concrete Floor Surface Roughering (Broom Brush) Just prior to concreting Access to pour (incl. labour & materials) and safety Availability of concrete Availability of labour Availability of plant & equipment Standby equipment for contigencies (including rain) (Note: To attach additional documents for further clarification, if necessary) Not OK OK Not OK Comment / Remarks :
Description of Works
General Comments:
Client:
C&S Engineer:
Contractor:
Project:
CHECK LIST
Inspection by Contractor Item No. Inspection by Clerk of Comment / Remarks : Works Date: Time: ST: OK Approval Chit Ref. No. : 1 2 3 4 5 6 Setting Out/Alignment Level (Excavation) Piling Blinding / Pile Cut Off Level Invert Level Formwork (a) Dimension, Level, Verticality (b) Adequately Supported or Propped (c) Joints Tightness (d) Surface of Forms Acceptable (e) All Saw Dust & Rubbish Removed 7 Reinforcement (a) Correct Grade, Size, Number & Spacing (b) Correct Lap/Anchorage Length (c) Adequate Chairs, Spacers, etc (d) Cover as required (e) No Mud, Oil, Loose Rust, etc 8 M & E Opening and Pipe Sleeves (a) Soil & Waste Pipe (b) RWDP (c) Others 9 10 11 (a) 12 13 14 15 (a) (b) (c) (d) (e) Weep Hole Drain Top Level Curing PVC cover, gunny sack & watering Bond Tie Construction Joint Concrete Floor Surface Roughering (Broom Brush) Just prior to concreting Access to pour (incl. labour & materials) and safety Availability of concrete Availability of labour Availability of plant & equipment Standby equipment for contigencies (including rain) (Note: To attach additional documents for further clarification, if necessary) Not OK OK Not OK (Deficiencies, Degree of completion, weather, others)
Description of Works
General Comments:
PROJECT :
From : To :
We request permission to proceed with the following work : .. .. .. At the following location :
Survey :
Inspection :
Testing : Ref.:
From : To :
Date :
Neither the endorsement of this Form nor anything written on it is intended to convey final approval for any part of the works.
Client:
C&S Engineer:
Contractor:
Project:
Subject : .
PART A : Details of Non - Compliance (to be completed by RE / QAE)
. Received by : Signature : Name : .... .... (Contractor) PART B : Proposed Corrective Action 1. Rework to meet specification 2. Scrap / Demolished Signature : Name : .... .... (Resident Engineer / QAE)) (to be completed by Contractor) 3. Repair 4. Others
..
.. DATE OF CORRECTIVE ACTION TO BE COMPLETED : .. Signature : Name : Signature .... : Name : .... (Resident Engineer / QAE)) Date : ....
Date :
....
. DATE ACTION TO PREVENT RECURRENCE TO BE COMPLETED : .. Signature : Name : .... .... (Contractor) Date : .... (to be completed by RE / QAE) .. .. NCR CLOSED OUT Yes / No : . by Verify .. : . (Resident Engineer / QAE) Date : .
PART C : Follow - up, Close out & Verification of corrective action PROPOSED FOLLOW - UP DATE : .. Remarks :
Client:
C&S Engineer:
Contractor:
Project:
Time of Loading
Time of Delivery
Time of Placing
Remarks
..
.........
Date:
FORM NO. QM/DRMC
Date:
Date: