01.sundram Fasteners LTD
01.sundram Fasteners LTD
Kobetsu Kaizen
W elcome
Sundram
Fasteners
Madurai
Lim ited
(SFL)
Krishnapuram,
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SFL - Krishnapuram
Kobetsu Kaizen
Excellence Award
199 8
Part 2
TPM kickoff
1995 SUNFAST TPM
Part 1
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Planning
Finance
Personnel
General Admin
Production
Materials
Marketing
Plant 1
Plant 2
Plant 3
TPM Part 1: Main focus on factory TPM Part 2: Company wide TPM including all functions SUNFAST TPM
t
Courtesy:JIPM
of 8
OTPM - Factor
Planned Maintenance
Kobetsu Kaizen
SUNFAST TPM
Quality Maintenance
SFL - Krishnapuram
Kobetsu Kaizen
Initial Control - P
of 8
SFL - Krishnapuram
Kobetsu Kaizen
OTPM - Factor
Planned Maintenance
Kobetsu Kaizen
SFL - Krishnapuram
Jishu Hozen
Quality Maintenance
Kobetsu Kaizen
SUNFAST TPM
Initial Control-Equipme
Initial Control-Products
OTPM - Marketing
OTPM - Purcha
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
SFL - Krishnapuram
Kobetsu Kaizen
Top 4 Pillars
Focus area
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Top 4 Pillars
Focus area
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Objectives of KK pillar q Improve OEE/OPE of equipments Through reduction of time losses From 16 major losses Additional new losses q Achieve total product cost reduction Through reduction of resource losses From 16 major losses Additional new losses VA/VE improvements
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Objectives of KK pillar q Improve OEE/OPE of equipments Through reduction of time losses From 16 major losses Additional new losses q Achieve total product cost reduction Through reduction of resource losses From 16 major losses Additional new losses VA/VE improvements
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Cost structure
Total Product Cost
Conversion Cost
Tools Sub-contract Power Freight Outward Spares Chemicals Bought out service HSD Oils and lubricants Packing Materials Variable others
Employee Cost
Fixed Cost
Div.Heads Corp. over heads Special revenue Utilities & building Travel & conveyance Fixed others
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Loss structure
Losses 16 major losses Time losses
Losses affecting availability Job change time loss Breakdown loss Customer complaint loss Losses affecting performance rate Losses affecting quality rate Schedule downtime losses Management losses
New losses
Sub-contract loss
Resource losses
Inventory loss Energy losses Tool loss Yield loss Bought out service loss Premium freight loss
SUNFAST TPM
Eliminate
of 8
SFL - Krishnapuram
Combine
Kobetsu Kaizen
VA/VE Improvements
Simplify
Design VA/V E
Raw Material Tools
Process VA/V E
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Evaluation of loss-cost values and fixing targets for Loss reductions and VA/VE improvements
SUNFAST TPM
20 of 8
SFL - Krishnapuram
Kobetsu Kaizen
Losses
Yield Loss
R s./M T BM T arget Sav ings BM T arget 18% 8%
VA/VE improvements
J/C Loss
275 mts. 75 mts.
Tool Loss
20% 5%
Energy Loss
250 KWh/M T 100 KWh/M T
Tool VA/VE
490 Rs/MT 1097 Rs/MT
Energy VA/VE
80 Rs/M T 250 Rs/MT
Major Cost
5 1 1 1 1
1 5 1 1 1
1 1 5 1 1
1 2 1 3 1
1 4 1 1 1
1 1 3 1 1
1 1 2 4 1
1 1 1 1 5
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
MT
Kobetsu Kaizen
200
100
50
Defect Loss 38
Inventory Loss 21
Setting Scrap 17
Assorted PS 10
En bit los 10
Testing Scrap 8
MT
SUNFAST TPM
of 8
SFL - Krishnapuram
MT
Kobetsu Kaizen
63%
120
100
37%
80
60
40
20
0 MT
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Nut
Bolt/Screws
Slug
Tapping swarf
Machining Burr
Trim Burr
Grinding swarf
Burrless Tapping
Burrless forging
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Sample 25.0 Kaizen mm
AFTER
(Yield loss)
Kobetsu Kaizen
Yield = 79%
Yield = 89.2%
RM wt.85.0 gms
26%
SUNFAST TPM
of 8
Kobetsu Kaizen
19%
Better
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Elements I Eliminate Trim burr Reduce OD grinding Reduce collar machining Total I - Identified C - Completed
Formed version C 32 32
48 48
of 8
SFL - Krishnapuram
%
19 1998-99 1999-00 17 2000-01 2001-02 15 2002-03 2003-04 13 2004-05 2005-06 11 2006-07 2007-08 9 2008-09 - I 2008-09 - II Yield 7 Loss% 16.8 16.4 15.8 15.5 15.1 14.5 13.2 11.5 10.4 9.5 8 Tgt. 5
45%
of 8
Reduction
SFL - Krishnapuram Kobetsu Kaizen 1998-99 1999-00 Total yield loss reduction Krishnapuram plant 2000-01
2001-02 2002-03 % 2003-04 20 2004-05 2005-06 2006-07 18 2007-08 2008-09-I 16 2008-09-II Yie ld Loss% 17.8 14 16.1 12 15.8 14.9 14.5 10
6
9.7%
Better
17
13 12
17.84 2
SUNFAST TPM
of 8
SFL - Krishnapuram Kobetsu29189 Kaizen 38918 Resultant RM cost reduction Krishnapuram plant
Rs./MT
38918
38440
38012
37586
36980
35840
34980
34012
33856
32988
31586
39000
Better
37000
19% Reduction
35000
33000
31000
29000
27000
25000
Cost Tgt.
1998-99
1999-00
2000-01
2001-02
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09 - I 2008-09 - II
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Tool life improvement Using higher grade material for tool Improved surface coating for tool
Re-cycling
Analysi s
SUNFAST TPM
of 8
SFL - Krishnapuram
COST Rs./M
Kobetsu Kaizen
1,400
1,200
800
600
400
200
0 Rs./MT
ST EL TO LS E O 1,250
CA BI DES R 94 0
ROLLI NG DIES 78 6
TA PS 58 7
OTHER S 355
SUNFAST TPM
of 8
SFL - Krishnapuram
COST Rs./M
Kobetsu Kaizen
350
300
250
200
150
100
50
0 Piercing Pin T rim dies Heading Insert Rs./MT 305 245 205
Punches
Dies
OT HERS
150
140
50
SUNFAST TPM
of 8
SFL - Krishnapuram
Theme
Piercing Pin Trim Dies Heading Inserts Nut Forming Dies Bolt Forming Dies Punches Common tools Total I - Identified C - Completed
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Length optimization
No s 2 50 00 2 00 00 150 00
Kobetsu Kaizen
D
Failure mode: Buckling Failure mode: Breakage
100 00 50 00 0 1.6D 1.5D 1.4D 1.3D 1.2D 1.1D 1D 0.9D 0 .8D 0.7D
Length
Result : Tool cost savings up to Rs 1.2 million / Year ( 3.5 million yen/ Year).
SUNFAST TPM
39 of 8
SFL - Krishnapuram
Steel tools Carbides Rolling Dies Taps Other tools Total I - Identified C - Completed
SUNFAST TPM
of 8
SFL - Krishnapuram Kobetsu Kaizen Cost savings through Tool VA/VE improvements
Rs./MT
1200
1000
Better
928
800
600
400 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 09Cost / MT Target 490 490 520 590 610 670 697 720 786 840 870
SUNFAST TPM
of 8
3918 3918
3840
3750
3610
3560
3420
3315
3150
3010
2850
2480 2351
SFL - Krishnapuram Kobetsu Kaizen Resultant tool cost reduction Krishnapuram plant
Rs./MT
4500 4000 3500 3000 2500 2000 1500 1000 500 0 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Cost / MT Target 2008-09- 2008-09I II Better
34% Reduction
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Coupling of machines
Automation
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
TPM Part - 2
Perfect Cell
Informatio n System
Support Team
Perfect Lines
TPM Part - 1
Perfect Machines Coupling of Machines
Zero 1A/1B
Zero Defects
SUNFAST TPM
of 8
Kobetsu Kaizen
TPM Part 1
LUNCH TIME RUNNING
TPM Part 2
LUNCH TIME STYLE RUNNING
SUNFAST TPM
of 8
Kobetsu Kaizen
ROLLING MACHINE OPERATOR
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Operator 3
Operator 2
Operator 1
Forging machine
Line 3
Line 2
Line 1
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Countermeasures
Eliminate loading pits, output carrying conveyors and vibratory feeders Replace bulk feeding conveyors to Single-piece flow conveyors Re-layout to minimize operator movement Release other two operators for support / kaizen team Introduce information system between operator and support / kaizen team
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Operator 3
Operator 2
Operator 1
Operator 1
Line 3
Line 2
Line 1
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Information system
LTSR - Information system
Support required from Supervisor/Manager Support required from Kaizen Team Machine is in Running
Audio
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Result
Labour productivity index
800 639
600
400
213 200
100
0 Index
Pre-TPM 100
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
Benefits
SUNFAST TPM
of 8
Kobetsu Kaizen
Better
350 300 250 200 150 100 50 0 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Cost / MT Target 83 83 92 102 108 118 126 132 138 145 168
243
260% 83
2008-09- 200809- II I 243 304
SUNFAST TPM
17 % Reduction
of 8
SFL - Krishnapuram Kobetsu Kaizen Resultant employee cost reduction Krishnapuram plant
1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 T RS/M 8000 2007-08 2008-09 - I 2008-09 - II Cost 7600 7500 7520 7410 7205 7180 7000 6950 6770 6620 6520 6500 6490 6320 Tgt. 7600 6000
Better
5500
of 8
SFL - Krishnapuram Kobetsu Kaizen Total product cost reduction Krishnapuram plant
100
18% 27% 30%
80 % 60
100
40
82 73 70
20
0
Product cos t %
BM (1998-99) 100
Curre nt (2008-09) 73
Target 70
SUNFAST TPM
of 8
SFL - Krishnapuram
Kobetsu Kaizen
To Sum up
TPM
Part 2
It is wider!
TPM
Part 1
SUNFAST TPM
SFL - Krishnapuram
Kobetsu Kaizen
Thank You
SUNFAST TPM
of 8