High quality single discipline models Model requirements and intents understood
Precise geometric sizes and locations for all objects Objects fully populated with appropriate properties and attributes Information embedded or linked in appropriate and consistent manner
5
automated schedules, quantities & especifications 4D construction scheduling 3D visualisations of complex areas & perspectives. Sun studies and animations. Extracts of quantities, areas, volumes etc.
6
3D geometry used for clash detection for Design Phase Creation of Project Life Cycle BIM Model For construction/fabrication for limited trades only for coordination and clash detection For analysis or simulation of building performance
basis for 3D geometry use and set-out: ACCURACY is CRITICAL! LCA, environmental or estimating analysis software use. Orientation and detail of model elements is critical (e.g. sun studies, lighting analysis with correct information included)
8
Analysis
two or more project participants in an iterative collaborative process. Much effort is required to:
Establish compatible file formats and workflow Manage versions Organize object selection Manage orientation of models Feedback the information
10
BIM model file is exported to other participants for visualisation, communication, assessment, analysis, simulation or discipline design. Marginally useful
Archi
Struct
MEP
Builder
Design is ITERATIVE!
11
Archi
Struct
MEP
Builder
12
ODBC, COM, GDL or MDL DWG, DXF, RVT, DGN, SKP, 3DM, etc. Intelligence is usually lost in this type of translation IFC or CIS/2. Intelligence is retained in this type of translation (hopefully!)
Geometry formats
Interoperability
Understanding the different file formats is
essential in managing data flow between disciplines, users and software platforms This is key to unlocking true collaboration between disciplines and teams
14
Tonights agenda
Review Writing Assignment
15
Space planning, program compliance Software Affinity Codebook International Facility Composer SketchUp Form Z dRofus Aprog Bluethink House Designer Generative Components
16
Design Phase Form Finding Design Authoring - Documentation Structural Analysis - Documentation Energy Analysis - Implementation Lighting Analysis - Implementation Mechanical Analysis System Design and Documentation
17
Sketchup Rhino FormZ Archicad Revit Architecture Bentley Architecture Autocad Architecture
18
Tekla Revit Structure Bentley Structural Autocad Structural Detailing Robot Prosteel 3D Several analysis packages for specific purposes
19
20
DDS - HVAC Revit MEP Bentley Architecture CADDuct Autocad Building Systems Riuska
21
Software - Sustainability
Software Estimating/QS
23
Software - Environmental
http://files.myopera.com/Absinth/albums/1922
9/domo6.jpg
25
26
27
Others
28
As a project continues, the software used becomes more robust and complex No project can use a single software platform All programs have their strengths and weaknesses Master 2 platforms that are most important for your industry or interests Be aware of the rest!
29
Tonights agenda
Review Writing Assignment
30
31
Technical Issues
Cost of
Hardware Software
Process Issues
Getting past legacy methods
Design/Construction paradigm
33
Organizational Issues
later
Organizational Issues
Solutions in:
Government and client mandate Changes in contractual obligation and project schedule
Your
35
Policy Issues
Is the government ready?
Are they doing it Right?
Deliverables expectations
Statutory requirements for documentation LTA Requirements CP-83 for BIM? How far should the standards go?
36
Builder Savvy
Staff Avail.
Client Needs
Gov Req.
37
Design Team
coordination
Build Team
Project Duration
Process 1
38
BIM TEAM
BUILD TEAM
39
40
Tonights agenda
Review Writing Assignment
41
Tutorial Questions
What are the considerations for planning to
use BIM on a project? What kinds of models are appropriate for what stage of the building process? What are 5 key activities of model management? What are the fundamental 3d concepts that underpin Building Information Modeling? Describe the 4 primary obstacles of BIM implementation
Your answers to these questions will be the basis for our DISCUSSION in Fridays class