Q1. Explain in Brief The Origins of Just in Time. Explain How JIT Is Implemented
Q1. Explain in Brief The Origins of Just in Time. Explain How JIT Is Implemented
Master of Business Administration-MBA Semester 2 MB0044 Production & Operations Management Assignment Set- 1 ********************************************************* Q1. Explain in brief the origins of Just in Time. Explain how JIT is implemented. JIT production is meant for products which are repetitive in nature. The system has its origin in providing a solution to a manufacturing process, where the finished product has a number of parts that get assembled. The problems in such situations will be to keep the arrival of parts, components, and subassemblies so that no shortages will occur while holding up production. Therefore, it becomes vital that all parts that form the flow in many streams are of high quality, so that the assembly does not get held up. For JIT to be successful inventories have to be kept to the minimum and every component produced must represent highest quality. It is relevant to mention Taguchis insistence on achieving the target value to realise quality. The permitted tolerances do not ensure high quality. Controlling variability by strict adherence to best processes with built-in robustness to achieve Six Sigma standards ensures high quality. These help in realising JIT, which has economy in focus and provide an additional factor for competitiveness. So, high quality production helps in reducing the waste of inventory space to the maximum extent. Just in Time (JIT) is a management philosophy aimed at eliminating waste and continuously improving quality. Credit for developing JIT as a management strategy goes to Toyota. Toyota JIT manufacturing started in the aftermath of World War II. Although the history of JIT traces back to Henry Ford who applied Just in Time principles to manage inventory in the Ford Automobile Company during the early part of the 20th Century, the origins of the JIT as a management strategy traces to Taiichi Onho of the Toyota Manufacturing Company. He developed Just in Time strategy as a means of competitive advantage during the post World War II period in Japan. The post-World War II Japanese automobile industry faced a crisis of existence, and companies such as Toyota looked to benchmark their thriving American counterparts. The productivity of an American car worker was nine times that of a Japanese car worker at that time, and Taiichi Onho sought ways to reach such levels. Implementation of JIT: JIT like TQM and other developmental measures is possible only with top management commitment and a learning culture in the organisation. The main handicap to any programme is the resistance by the organizational members even at the top, to make changes. This resistance may take the form of noncooperation and may enlarge to become sabotage. These show up at the implementation stage. So, communication of the goals to be MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
realised and the objectives of each team should be make effectively. Initially, a milestone chart will help in establishing the various steps to be taken and correcting the activities as the process is on is the best way of ensuring success. It is well to remind at this stage, that JIT is not a destination, but an ongoing continuous improvement programme in the process of achieving Total Quality Management. 1. Prerequisites for Implementation Like any advanced method of production and quality improvement some pre requisites are needed to be in place so that implementation is easy and the results identifiable. The following points give the requirements from the design process to the measurement a) Design flow process 1. Link operations 2. Balance workstation capacities 3. Relay out for flow 4. Emphasise preventive maintenance 5. Reduce lot sizes 6. Reduce set up and changeover times b) Total Quality Control 1. Worker responsibility for quality 2. Measure SQC 3. Enforce compliance 4. Failsafe Methods 5. Automatic inspection c) Stabilise schedule 1. Level Schedule 2. Under utilise capacity d) Kanban Pull 1. Demand Pull 2. Back flush 3. Reduce Lot sizes e) Work with vendor 1. Reduce lead times 2. Frequent deliveries 3. Project usage requirements 4. Quality expectation f) Reduce Inventories 1. Look for other areas 2. Stores 3. Transit 4. Carousels 5. Conveyors g) Improve Product Design 1. Standard Product Configuration MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02 2. Standardise and reduce number of parts 3. Process design with product design 4. Quality Expectations The above activities lead to: A. Solving problems concurrently (i) Root Cause (ii) Solve Permanently (iii) Team approach (iv) Line and specialist responsibility (v) Continual education
2. Shop Floor Control Realistic planning and scheduling taking into consideration the frequency with which set ups have to be changed to manage material flow without building up inventories, leads to JIT manufacturing. SMED single minute exchange of dies gives flexibility for production process. Advocated by Shigeo Shingo, this method calls for designing and making fixtures and toolings which are instrumental in changing setups so that changes to be effected within a minute. 3. Purchasing The essence of JIT purchasing lies in treating the purchaser as a participant in your activities. Cooperative relationship leads to the development of the supplier who understands our requirements and in situations where he confronts any difficulty, he should be in a position to approach the company for its solution. Every problem or discovery of a defect is considered an opportunity which the supplier and the company to get a deeper understanding of the problem and the solutions will solve not only that problem, but also ones that were hidden. 4. Vendor Managed Inventory The very purpose of JIT is to reduce inventory at all places in the supply chain. Inventory is considered a waste because inventory is created by using materials, machines and efforts of persons. All of these are resources which have already been used up and that portion of it which is not consumed and sent up the value chain causes a drag on the system. However, inventories are inevitable because uncertainties exist at every stage, making it necessary to provide a buffer so that demands do not go unfilled. The challenge is to keep it to the minimum. To make this happen the calculations involving forecasts of the market demand, the capacities of the equipments, worker absenteeism, suppliers lead times, the quality of the produced components, etc.
(Set-I)
MBA Semester-02
Q.2 Bring out the historical background of Value Engineering. Elucidate three companies which have incorporate VE with brief explanation. ANSWER: Value of engineering (VE) or value Analysis is a methodology by which we try to find substitutes for a product or an operation. The concept of value engineering originated during the second world war. It was developed by the General Electric corporations (GEC). Value Engineering has gained popularity due to its potential for gaining high Returns on investment (ROI). This methodology is widely used in business re-engineering, government projects, construction, assembling and machining processes, health care and environmental engineering, and many others. Value engineering process calls for a deep study of a product and the purpose for which it is used, such as the raw materials used; the processes of transformation; the equipment needed, and many others. It is also questions whether what is being used is the most appropriate and economical. This applies to all aspects of the products. 1. GENERAL ELECTICALS CORPORATION (GEC)
The concepts of value engineering originated in 1947 in General Electricals corporation (GEC) When a substitute for asbestos for flooring had to be found. Specialized dealers could provide an equally good material at a lesser price. Initially, the practioners were the people in charge of purchasing who tried to locate substitute material which would be equally good, if not better, at a lower price. This the first and basic approach to value engineering. A the concept percolated to the manufacturing departments, engineers applied the same principles and found that, they could use alternate materials, which were cheaper giving the same performance. It was also fund that dimensions and tolerance could be altered without affecting the performance of the part or the product. The investigations took them on the path of eliminating some operations. The focus was on the value of each bit materials, each operation. This approach led to the design stage. 2. ASHOK LEYLAND. In implementation of VA, Ashok Leyland changed gear material from phosphor bronze to a less expensive cast iron and eliminated frequent field complaint of gear seizure in trucks. 3. TVS. T.V. Sundaram Lyenger (TVS) Limited is one of the largest automobile distribution companies in India. During the mid 1940 to 1960s, TVS based in Madurai was ranked as the best bus transportation system in India. It could manage to run the fleets for about 96% of the time. TVS used the VE approach to restore the mobility of buses that had broken down. They stocked their garage with some critical assemblies of a bus. MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
Whenever, a part or an assembly failed of a bus, they replaced it immediately with a new one, thus restoring mobility within a couple of hours. When compared to the traditional method, this approach has gained much more benefits to the company, it helped to save time, reduce cost, efficient, quicker, and competitive.
(Set-I)
MBA Semester-02
Q.3 Explain Key elements of Quantitative modelling. What is work study and motion study. ANSWER: There are different quantitative models. 1. LINEAR PROGRAMMING: Linear programming technique is often used for optimizing a given objective like; profit or revenue maximization, or cost outgo minimization. Distribution of the revenues is the critical issue, when there are limited resources and they have to meet competing demands. 2. TRANSPORTATION MODEL: Transportation model is concerned with goods from manufacturing centres or warehouses which have to be supplied to depots or retails outlets. The demand and supply position of the places where they are required or produced and the cost of transportation are considered in the model. We use this model to economize. 3. ASSISGNMENT MODEL: Allocating jobs or persons to machines, awarding different projects to contractors is done so that maximum returns occur or less expenses are incurred. Hence, calls for the use of this model.
4. INVENTORY CONTROL MODEL: Inventory control model considers the: Frequency of placing orders. Quantities per order considering the cost of placing an order. Number of pieces that are to be kept in reserve. Rate of consumption. Lead time required for the supplier. Cost involved in storage.
We have different models which give solutions to optimization depending upon the probabilities of consumption and supply. 5. WAITING LINE MODELS: Queues are formed when the rate of services is at a variance with the rate of arrival. They are formed when the rate of production is less at particular points compared to the previous one. Sometimes we see multiple service points and a single queue are formed for feeding them. Number of items which includes the following is studied with some special techniques. People to be serviced. Rate of service Type of queue discipline that is intended to be followed. Policy of priority Tolerable amounts of waiting Others. (Set-I)
MBA Semester-02
6. SIMULATION MODELS: Simulation models are used when we will not be able to formulate mathematical model. So, we develop a model which resembles a real life situation. Based on this pattern, we predict and plan our procurement, production, delivery and other actions. 7. PERT (PROJECT EVALUATION AND REVIEW TECHNIQUE) AND CPM (CRTICAL PATH METHOD) MODELS: When projects are undertaken with a number of activities, some happens in sequence, with gaps of weeks or months and some happens simultaneously. It is important to estimate the time required for completion of the project. A lot of coordination is needed while supplying the resources. It is also equally important to identify the bottlenecks and smoothen resources so that time schedules are maintained. Delayed completion may entail penalties. In this model, we adopt special methods to make the system.
Work study We can say that work study is being conducted when analysis of work methods is conducted during the period when a job is done on a machine or equipment.
Motions study. Method study is on studying the method currently being used and developing a new method of performing the task in a better way.
The study helps in designing the Operation flow charts, motion charts, flow optimum work method and process charts, which are the elements of the standardization of the work method. task are studied to find the purpose of each activity, the sequences in which they are done, and the effect of these on the work.
The study enables the methods engineer The study may help in changing some of them to search for better methods for higher and even eliminate some of them to effect utilization of man and machine and improvements. accomplishment of higher productivity. The study gives an opportunity to the The new method should result in saving of workmen to learn the process of study time, reduced motions and simpler activities. thus making them able to offer suggestions for improved methods.
(Set-I)
MBA Semester-02
Q.4 What is rapid prototyping ? Explain the difference between Automated flow line and Automated assembly line with examples. ANSWER: Prototyping is a process by which a new product is developed in small numbers. Prototyping is helpful to: Determine the suitability of the materials Study the various methods of manufacture Determine type of machinery required Develop techniques to overcome problems that may be encountered when full scale manufacturing is undertaken.
Prototype do meet the specification of the components that enter a product and performance can be measured on those. It helps in confirming the design and any shortcomings can be rectified at low cost. If serious defects or problems arise during manufacturing, a thorough change in design or even its replacement may be considered. Toa arrive at decisions and to make use of the advantageous stated above, it is important that the prototypes are made within the shortest possible time, Rapid prototyping facilities this. The advanced Rapid Prototype Modelling Processes are: Computer Aided Design (CAD) Selective Laser Sintering (SLS) Fused Deposition Modelling (FDM) Lamination Object Manufacturing (LOM) Electronic Beam Melting (EBM) Different between Automated Flow lines and Assembly Flow line. AUTOMATED FLOW LINES ASSEMBLY FLOW LINES
Several Automated machines are linked by All equipments are needed to in automated a transfer system. Assesmbly line Handling machine have main role to move All equipments make role of making subsemi finished product to the next stage. assemblies put together and fitted.
(Set-I)
Roll No. - 521134301 Here Sub-assemblies product are the core activites.
Here raw materials are achieving to get Here intermediated products are achieving to required shapes and acquire special get finished product. properties. The materials are needed to be moved, Here All parts or sub-assemblies are fitted to held, rotated, fitted and positioned for enables the product to be in readiness to completing different operations. perform the function it was designed to. This process is called assembly. Human intervention may be needed to No human intervention is needed, verify that the operations are taking place methodologies are framed to achieve the final according to standards. result, basic principle is to fit parts together and ensure linkages so that the functions are integrated and give out the desired output.
(Set-I)
MBA Semester-02
Q.5 List different methods for selecting a suitable plant location and explain any two. ANSWER: Planning the location of the plant Factors influencing Plant Location can be broadly divided into two types namely: general factors and special factors (See below Figure Factors influencing plant location).
General factors: The general factors that influence the plant location are listed below (See Figure below General factors influencing plant location).
2.
Availability of inputs: While choosing a plant location, it is very important for the organization to get the labor at the right time and raw materials at good qualities. The plant should be located: Near to the raw material source when there is no loss of weight At the market place when there is a loss of weight in the material Close to the market when universally available, so as to minimize the transportation cost
(Set-I)
MBA Semester-02
The advantages of locating the plant near to the market place are: Consistent supply of goods to the customers Reduction of the cost of transportation
Power: For example, industries which run day and night require continuous power supply. So they should be located near to the power stations and should ensure continuous power supply throughout the year.
(Set-I)
MBA Semester-02
Water: For example, process industries such as, paper, chemical, and cement, requires continuous water supply in large amount. So, such process industries need to be located near to the water. Waste disposal: For example, for process industries such as, paper and sugarcane industries facility for disposal of waste is the key factor.
(Set-I)
MBA Semester-02
Q.6 Explain Jurans Quality Trilogy and Crosbys absolutes of quality. List out the pillars of total productive maintenance. Ans. JURANS QUALITY TRIOLOGY Juran uses his famous universal Breakthrough Sequence to implement quality programmes. The universal break through sequences are ; Proof of need: there should be a compelling need to make changes. Project identification: here what is to be changed is identified. Specific projects with time frames and the resource allocation are decided. Top management commitment: Commitment of the top management is to assign people and fix responsibilities to complete the project. Diagnostic journey: Each team will determine whether the problems result from systemic causes or are random or are deliberately caused. Root causes are ascertained with utmost certainty. Remedial Action: This is the stage when changes are introduced. Inspection, testing, and validation are also included at this point. Holding on to the gains: the above steps results in beneficiary results. Having records or all actions and consequences will help in further improvements. The actions that results in the benefits derived should be the norm for establishing standards. JURAN HAS CATEGORISED COST OF QUALITY IN TO FOUR CATEGORIES: 1. Failure costs internal: These are cost of rejections, repairs in terms of materials, labour, machine time and loss of morale. 2. Failure costs-External: These are cost of replacement, on-site rework including spare parts and expenses of the personnel, warranty costs and loss of goodwill. 3. Appraisal costs: These are cost inspection, including maintenance of records, certification, segregation costs, and others. 4. Prevention costs: Prevention cost is the sequence of three sets of activities, Quality planning, Quality control, and Quality improvement, forming the triology to achieve TOTAL QUALITY MANAGEMENT. JURANS ARGUMENT SAYS THAT; Quality is the result of good planning consideration the needs of both internal and external customers and develops processes to meet them. The processes are also planned to meet them.
(Set-I)
MBA Semester-02
Quality is built into the system of manufacture, inputs and processes that are on stream like raw material, spare parts, labour, machine maintenance, training, warehousing, inspection procedures, packaging, and other. All these have to follow standards and control exercises to make sure that mistake do not occur often and that if mistakes do occur then they are corrected at the source. Quality improvement measures are essential to keep the quality culture alive. Newer methods will be found, some operations can be eliminated, improved technology available. In short, as experience is gained things can always be done better. IT is for the management to take the initiative an encourage the employees to be on lookout for opportunities for improvement.
CROSBYS ABSOLUTES OF QUALITY Like Deming, Crosby also lays emphasis on top management commitment and responsibility for designing the system so that defects are not inevitable. He urged that there be no restriction on spending for achieving quality. In the long run, maintaining quality is more economical than compromising on its achievement. His absolutes can be listed as under: Quality is conformance to requirements, not goodness Prevention, not appraisal, is the path to quality. Quality is measured as the price Paid for non-conformance and as indices Quality originates in all factors. There are no quality problems. It is the people designs and processes that create problems.
Crosby also has given 14 points similar to those of Deming. His approach emphasizes on measurement of quality, increasing awareness, corrective action, error cause removal and continuously reinforcing the system, so that advantages derived are not lost over time. He opined that the quality management regimen should improve that overall health of the organization and prescribed a vaccine. The ingredients are. 1. Integrity: Honesty and commitment help in producing everything right first time, every time. 2. Communication: Flow of information between departments, suppliers, customers helps in indentifying opportunities. 3. Systems and operations: These should bring in a quality environment so that nobody is comfortable with anything less than the best.
(Set-I)
MBA Semester-02
Deming's TQM helps organizations to improve the quality of the products and services they offer. Demings approach is summarized in his 14 points. 1. Constancy of purpose for continuous improvement 2. Adopt the TQM philosophy for economic purposes 3. Do not depend on inspection to deliver quality 4. Do not award any business based on price alone 5. Improve the system of production and service constantly 6. Conduct meaningful training on the job 7. Adopt modern methods of supervision and leadership 8. Remove fear from the minds of everyone connected with the organization 9. Remove barriers between departments and people 10. 11. 12. 13. 14. Do not exhort, repeat slogans, and put up posters Do not set-up numerical quotas and work standards Give pride of workmanship to the workmen Education and training to be given vigorously State and exhibit top managements commitment for quality and productivity
Using the above principles, Deming gave a four step approach to ensure a purposeful journey of TQM (See Figure below for Deming Wheel). The slope is shown to indicate that if efforts are let up the programme will roll back.
(Set-I)
MBA Semester-02
Master of Business Administration-MBA Semester 2 MB0044 Production & Operation Management Assignment Set- 2 ********************************************************* Q1. EXPLAIN LOGICAL PROCESS MODELLING AND PHYSICAL PROCESS MODELLING. WHAT ARE THE INGREDIENTS OF BUSINESS PROCESS? ANS. LOGICAL PROCESS MODELLING Logical process modeling is the representation of putting together all the activities of business process in details and making a representation of them. The initial data collected need to be arrange in a logical manner so that, links are made between nodes for making for the workflow smooth. The steps to be followed to make the work smoother are given below: 1. Capture relevant data in detail to be acted upon. 2. Establish controls and limit access to the data during processes execution 3. Determine which task in the process is to be done and also the subsequent task in that process. 4. Make sure that all the relevant data is available for all the tasks. 5. Make the relevant and appropriate data available for that task. 6. Establish a mechanism to indicate acceptance of the results after every task or process. This is to have an assurance that flow is going ahead with accomplishments in the desired path. Some of these activities may occur in a sequential order whereas, some of them run parallel. There may even be circular paths, like re-work loops. Complexities arise when the processes activities are not connected together. Logical processes model consists of only the business activities and shows the connectivity among them. The process model is a representation of the business activities different from the technology dependent ones. Thus, we have a model that is singularly structured only for business activities. Computer programmes are also present in the total system. This allows the business oriented executives MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
to be in control of the inputs, processes and outputs. The logical process model improves, control on the access to data. It also indentifies, who is in possession of data at different nodes in the dataflow network that has been structured. A few of the logical modeling formats are given below. 1. Process Descriptions with task sequences and data addresses. 2. Flow chart with various activities and relationships 3. Flow diagrams 4. Function hierarchies 5. Function dependency diagram Every business activity, when considered as a logical process model, can be represented by a diagram, it can be decomposed and meaningful names can be given to the details. Verb and noun form combinations can be used to describe at each level. Nouns give the name of the activity uniquely and are used for the entire model meaning the same activity.
Physical process modeling is concerned with the actual design of data base meeting the requirement of the business. Physical modeling deals with the conversion of the logical model into a relation model. Object gets defined at the schema level. The objects here are tables created on the basis of entities and attributes. A database is defined for the business. All the information is put together to make the database software specific. This means that the objects during physical modeling vary on the database software being used. The outcomes are server model diagrams showing tables and relationships with a database. BELOW ARE THE INGREDIENTS OF BUSINESS PROCESS. The ingredients that might be used in a business process can be briefly outlined as shown below. The data which accomplishes the desired business objective. Acquisition, storage, distribution, and control of data which undertakes the process across tasks. Persons, teams, and organizational units which helps to perform and achieve the tasks. (Set-I)
MBA Semester-02
Q.2 EXPLAIN PROJECT MANAGEMENT KNOWLEDGE AREAS.WITH AN EXAMPLE EXPLAIN WORK BREAKDOWN STRUCTURE.
Project integration management, cost management, communications management. Project scope management, quality management, risk management. Project time management. management, human management, procurement
For a project to be successful, it is necessary to understand its relationship with other management disciplines. Other management supporting disciplines are business legal issues, strategic planning, logistics, human resource management, and domain knowledge.
(Set-I)
MBA Semester-02
The entire process of a project may be considered to be made up on number of sub process placed in different stage called the work breakdown structure (WBS). WBS is the technique to analysis the content of work and cost by breaking it down into its component parts. Projects key stages from the highest level of the WBS, which is then used to show the details at the lower levels of the project. Each key stage comprises many task identified at the start of planning and later this list will have to be validated. WBS is produced by indentifying the key elements, breaking each elements down into component parts and continuing to breakdown until manageable work MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
packages have indentified. These can then be allocated to the appropriate person. The WBS does not shown dependencies other than a grouping under the key stages. It is not time based- there is no timescale on the drawing. Chart showing the example of work break down structure. A Work Breakdown Structure is a results-oriented family tree that captures all the work of a project in an organized way. It is often portrayed graphically as a hierarchical tree, however, it can also be a tabular list of "element" categories and tasks or the indented task list that appears in your Gantt chart schedule. As a very simple example, Figure 1 shows a WBS for a hypothetical banquet. EXAMPLE 1.
(Set-I)
MBA Semester-02
EXAMPLE -2
(Set-I)
MBA Semester-02
Q.3 TAKE AND EXAMPLE OF ANY PRODUCT OR PROJECT AND EXPLAIN PROJECT MANAGEMENT LIFE CYCLE. ANS. A life cycle of a project consists of the following steps. Understanding the scope of the project. Establishing objectives of the projects Formulating and planning various activities. Executing the project Monitoring and controlling the project resources. Closing and post completion analysis
PHASES OF PROJECT MANAGEMENT LIFE CYLCE. Project management life cycle has six phases: 1. Analysis and evaluation phase. 2. Marketing phase 3. Design phase 4. Execution phase 5. Control-inspecting, testing, and delivery phase 6. Closure and post completion analysis phase.
1. ANALYSIS AND EVALUATION PHASE: Analysis and evaluation phase is the initial phase of any project. In this phase, information is collected from the customer pertaining to the project. From the collected information, the requirements of the project are analyzed. According to the customer requirement, the entire project is planned in a strategic manner. The project manager conducts the analysis of the problem and submits a detailed report to the top management. 2. MARKETING PHASE: A project proposal is prepared by a group of people including the project manager. This proposal has to contain the strategic adopted to market the product to the customer.
(Set-I)
MBA Semester-02
3. DESIGN PHASE: Design phase involves the study of inputs and outputs of the various project stages. a. Inputs received consist of project feasibility study, preliminary project evaluation details, project proposal, and customer interviews. b. Outputs produced consist of system design specifications, functional specifications of the project, design specifications of the project and project plan. 4. EXECUTION PHASE In execution phase, the project manager and the term members work on the project objectives as per the plan. At every stage during the execution, reports are prepared. 5. Control- inspecting testing and delivery phase: During this phase, the project teams works under the guidance of the project manager. The project manager has to ensure that the team working under him is implementing the project designs accurately. The project has to be tracked or monitored through its cost, manpower, and schedule. The project manager has to ensure ways of managing the customer and marketing the future work, as well as ways to perform quality control work 6. Closure and post completion analysis phase: Upon satisfactory completion and delivery of the intended product or service the staff performance has to be evaluated. The project manager has to document the lessons from the project. Reports on project feedback are to be prepared and analyzed. A project execution report is to be prepared.
Let us have a quick recap of what is involved in the above phases a. Analysis and evaluation phase: The preparation stage involves the preparation and approval of project outline, project plan, and project budget. b. Assigning task to the team members: The next stage involves selecting and briefing the project team about the proposals, followed by discussions on the roles and responsibilities of the project member and the organization. c. Feasibility study: The feasibility or research stage establishes whether the project is feasible or not and establishes the risk factors likely to be faced during the course of the project execution and the related key factors to overcome the problem
(Set-I)
MBA Semester-02
d. Execution phase: A detailed definition and plan for the project and its execution is prepared by the team and coordinated by the project manager. e. Implementation stage: The implementation stage involves the execution of the project as per the plan, this also involves careful monitoring of the project progress and managing the changes, if any, within the scope of the project framework. 7. Closure and post completion analysis phase: The final stage involves satisfactory delivery of the product/service to the customers. Upon completion, a project review is to be conducted by the project manager along with team member, sponsors, and customer. A project review process involves discussions about the progress, performance, hurdles that were overcome and problems faced , so that, such instances could be avoided in future projects.
Example No.1
(Set-I)
MBA Semester-02
Example No.2
Example No.3
Q.4 EXPLAIN PMIS. WHAT IS DIFFERENCE BETWEEN KEY SUCCESS FACTOR (KSF) AND KNOWLEDGE (K) FACTOR ? EXPLAIN WITH EXAMPLES. ANS. PMIS (PROJECT MANAGEMENT INFORMATION SYSTEM) MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
An information system is mainly aimed at providing the management at different levels with information related to the system of the organization. It helps in maintaining discipline in the system. An information system dealing with project management tasks is the project management information system. It helps in decision making in arriving at optimum allocation of resources. The information system is based on a database of the organization. A project management information system also hold schedule, scope changes, risk assessment and actual results. The information is communicated to managers at different levels of the organization depending upon the need. Let us find how a project management information system is used by different stakeholders.
WHO NEEDS INFORMATION AND WHY? Upper managers To know information on all project regarding progress, problem, resource usage, costs and project goals. This information helps them take decisions on the projects. They should review the projects at each milestone and arrive at appropriate decision. To see each project schedule, priority and use of resources to determine the most efficient use across the organization.
To see schedule, task lists and specification so that they know what needs to be done next.
The fours majors aspects of a PMIS are: 1. Providing information to the major stakeholder.
(Set-I)
MBA Semester-02
2. Assisting the team members, stakeholders, managers with necessary information and summary of the information shared to the higher level managers. 3. Assisting the manager in doing what if analysis about project staffing, proposed staffing changes and total allocation of resources. 4. Helping organizational learning by helping the members of the organizations lean about project management. Usually, the team members, and not the systems administrators of the company, develop a good PMIS. Organisations tend to allocate such responsibility by rotation among members with a well designed and structured data entry and analytical format.
DIFFERENT BETWEEN KEY SUCCESS FACTORS (KSF) AND KNOWLEDGE (K) FACTOR
The KSF should be evolved based on a Knowledge is the most powerful mover of basic consensus document (BCD) the wheels of progress KSF will also provide an input to effective exit strategy (EES) Knowledge (k) factor is an index of the extent to which one can manager today with yesterdays knowledge content and also the extent to which todays knowledge will be used tomorrow. K factor would render the development process more productive. The k factor of course, undergoes correction through obsolescence, since changes are now phenomenal.
Broad level of KSF should be available at the conceptual stage and should be firmed up and detailed out during the planning stage. The easiest way would be for the team to evaluate each step for chances of success on a scale of ten.
KSF should be available to the Leaders should recognize the knowledge management, duly approved by the potential of the younger managers. Seniority project manager before execution and is no more an automate scale for knowledge. control stages. It is equally important for younger member not suppress their knowledge potential from
(Set-I)
MBA Semester-02
KSF rides normal consideration of time Here time and cost does not matter, and cost- at the levels encompassing knowledge is to be updated time to time to client expectation and management get better results. perception-time and cost come into play as subservient to these major goal. In order to provide complete stability to fulfillment of goals, a project manager needs to constantly evaluate the key success factor from time to time. As age and experience advance wisdom gains, but knowledge should always be updated and utilized. It is the task of every team members to maximize the k factor in all directions.
Example of Key success factor According to TeachMeFinance.com, a turnkey project is "a project in which a builder/developer contracts to construct a completed facility that includes all items necessary for use and occupancy." Unfortunately, many turnkey businesses never capture the interest of the buyers. Whether you're building in brick and mortar or building in computer code, there are several factors critical to the success of your turnkey project.
Know the Business Several businesses can be set up as turnkey businesses, from food service to copy management to telemarketing and sales. Whichever you decide, it is important to have an intimate knowledge of the business you are building. One key factor in a successful turnkey business is being able to anticipate the needs and desires of the potential owners before they are brought on board. A salesman, for example, looking to purchase a turnkey sales business will need an office as a base of operations; but since so much of the sales process is done through phones, computers and other electronic devices, the turnkey developer may want to include additional power outlets in the construction of the building, or desks with onboard power strips and surge protectors. These small additions can make a turnkey project a success. Know the Area Internet businesses often have nationwide access to clientele, but brick-andmortar turnkey operations sometimes run into trouble in areas poorly suited to the service they offer. For example, an outdoor food service stand opening in Wilkes-Barre, Pennsylvania, will not do as much business (at least during the winter months) as one opening in an Orlando, Florida, theme park. Knowing the area where you are constructing your turnkey business includes knowing the MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
weather conditions, the dominant demographic, the current popularity and number of businesses like the one you are creating and the average income of the public. Planning a turnkey business that uses these factors to its advantage will make the business more readily sellable. Make Connections Turnkey businesses are designed to be ready to operate as soon as the buyer takes ownership. Still, once they are sold, many businesses of this type run into problems when it comes to resupplying, logistics and advertising. Because of this, many buyers are wary of turnkey operations. One way to quell any "down the road" fears is to have this part of the infrastructure accounted for. Make contact with businesses which help advertise businesses, ship products, supply copy paper and any other stock the owner might require. Obtain discounts from as many as possible Example of Knowledge (k) factor ABSTRACT Most organisations are aware that in todays highly competitive environment managing effectively their knowledge is the only way to achieve a sustainable competitive advantage. One of the primary areas to which knowledge management can be applied is the field of project management. An increasing number of business sectors are adopting a project approach to carry out a range of essential activities where valuable knowledge is gained. Knowledge from projects is an important resource for further projects, because projects solve innovative and interdisciplinary tasks. However, the majority of organisations do not manage the information gained through past projects. Failure to transfer knowledge from past to future projects leads to wasted activity and unnecessary expenses by reinventing the wheel. Therefore, knowledge management is a critical success factor for many projects. The purpose of this Management Report is to approach knowledge management from the perspective of project management. The main objective is to define how knowledge management can be enhanced within a project by analysing suitable tools and relevant theories. The research is based on the high-speed train project XY of the company XXX. This project is an important milestone for XXX to improve its market position in Spain. The knowledge gained through the XY project will be the key factor for the success of the further high-speed train projects. The main finding of the case study highlights that there is a lack of formal knowledge management activities at the project. The project team focuses mainly on personal interaction for transferring knowledge and information technology is not used to its full potential. A hybrid approach to knowledge management for project environments is suggested, taking into account technical as well as human-specific aspects. The main recommendation is to determine a knowledge management strategy, which preferably focuses on MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
transferring tacit knowledge and gives information technology a support function. Other areas of improvement are creating an open and constructive project culture, including knowledge initiatives in reward systems and fostering documented project review sessions. Finally, general conclusions are provided to answer the main research question of this management report. Q.5 EXPLAIN THE SEVEN PRINCIPAL OF SUPPLY CHAIN MANAGEMENT.TAKE AND EXAMPLE OF ANY PRODUCT IN THE MARKET AND EXPAIN THE SECENRIO OF BULLEHIP EFFECT. Ans: Seven principles of SCM are: 1. Group customer by needs: Effective SCM groups customers by distinct service needs, regardless of industry and then tailors services to those particular segments. 2. Customize the logistics networks: In designing their logistic network, companies need to focus on the service requirement and profit potential of the customer segments identified. 3. Listen to signals of market demand and plan accordingly: sales and operations planners must monitor the entire supply chain to detect early warning signals of changing customers demand and needs. This demand driven approach leads to more consistent forecast and optimal resource allocation. 4. Differentiate the product closer to the customer: companies today no longer can afford to stockpile inventory to compensate for possible forecasting errors. Instead, they need to postpone product differentiation in the manufacturing process closer to actual consumer demand. This strategy allows the supply chain to respond quickly and cost effectively to changes in customer needs. 5. Strategically manage the sources of supply: By working closely with their key suppliers to reduce the overall costs of owning materials and services, SCM maximizes profit margins both for themselves and their suppliers. 6. Develop a supply chain wide technology strategy: As one of the cornerstones of successful SCM, information technology must be able to support multiple levels of decisions making. It also should afford a clear view and ability to measure the flow of products, services and information. 7. Adopt channel spanning performance measures: Excellent supply chain performance measurement systems do more than just monitor internal functions. They apply performance criteria to every link in the supply chain-criteria that both service and financial metrics. MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
BULLWHIP EFFECT IN SCM An organization will always have up and downs. It is necessary that the managers of the organization keep track of the market conditions and analyze the changes. They must take decisions on the resources and make necessary changes within the organization to meet the market demands. Failing to do so may results in wild swings in the orders. This may adversely affect the functioning of the organization resulting in lack of coordination and trust among supply chain members. The changes may affect the information and may led to demand amplification in the supply chain. The Bullwhip effect is the uncertainty caused from distorted information flowing up and down the supply chain. This has its affect on almost all the industries, poses a risk to firms that experience large variations in demand, and also those firm which are dependent on suppliers, distributors and retailers. A bullwhip effect may arise because of: Increase in the lead time of the project due to increase in variability of demand Increase in the stocks to accommodate the increase demand arising out of complicated demand models and forecasting techniques. Reduced service levels in the organization. Inefficient allocation of resources. Increased transportation cost.
How to prevent it ? Bullwhip effect may be avoided by one or more of the following measures: Avoid multiple demand forecasting. Breaking the single order into number of batches of orders. Stabilize the prices, avoid the risk involved in overstocking by maintaining a proper stock Reduce the variability and uncertainty in point of sale (POS) and sharing information Reduce the lead time in the stages of the project Always keep analyzing the past figures and track current and future levels of requirement.
(Set-I)
MBA Semester-02
Enhance the operational efficiency and outsourcing logistics to a capable and efficient agency
Example of one product the effect Bullwhip theory. The Beer Game The beer game was developed at MIT by the Systems Dynamic Group in the 1960s. The game involves a simple production/distribution system for a single brand of beer. There are three players in the game including a retailer, a wholesaler, and a marketing director at the brewery. Each player's goal is to maximize profit. A truck driver delivers beer once each week to the retailer. Then the retailer places an order with the trucker who returns the order to the wholesaler. There's a four week lag between ordering and receiving the beer. The retailer and wholesaler do not communicate directly. The retailer sells hundreds of products and the wholesaler distributes many products to a large number of customers. The following represents the results of a typical beer game:3.1 The Retailer Week 1: Lover's Beer is not very popular but the retailer sells four cases per week on average. Because the lead time is four weeks, the retailer attempts to keep twelve cases in the store by ordering four cases each Monday when the trucker makes a delivery. Week 2: The retailer's sales of Lover's beer doubles to eight cases, so on Monday, he orders 8 cases. Week 3: The retailer sells 8 cases. The trucker delivers four cases. To be safe, the retailer decides
(Set-I)
Week 4: The retailer learns from some of his younger customers that a music video appearing on TV shows a group singing "I'll take on last sip of Lover's beer and run into the sun." The retailer assumes that this explains the increased demand for the product. The trucker delivers 5 cases. The retailer is nearly sold out, so he orders 16 cases. Week 5: The retailer sells the last case, but receives 7 cases. All 7 cases are sold by the end of the week. So again on Monday the retailer orders 16 cases. Week 6: Customers are looking for Lover's beer. Some put their names on a list to be called when the beer comes in. The trucker delivers only 6 cases and all are sold by the weekend. The retailer orders another 16 cases. Week 7: The trucker delivers 7 cases. The retailer is frustrated, but orders another 16 cases. Week 8: The trucker delivers 5 cases and tells the retailer the beer is backlogged. The retailer is really getting irritated with the wholesaler, but orders 24 cases. 3.2 The Wholesaler The wholesaler distributes many brands of beer to a large number of retailers, but he is the only distributor of Lover's beer. The wholesaler orders 4 truckloads from the brewery truck driver each week and receives the beer after a 4 week lag. The wholesaler's policy is to keep 12 truckloads in inventory on a continuous basis. Week 6: By week 6 the wholesaler is out of Lover's beer and responds by ordering 30 truckloads from the brewery. MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
Week 8: By the 8th week most stores are ordering 3 or 4 times more Lovers' beer than their regular amounts. ________________________________________________________________ ______________ ________________________________________________________________ ________________ Week 9: The wholesaler orders more Lover's beer, but gets only 6 truckloads. Week 10: Only 8 truckloads are delivered, so the wholesaler orders 40. Week 11: Only 12 truckloads are received, and there are 77 truckloads in backlog, so the wholesaler orders 40 more truckloads. Week 12: The wholesaler orders 60 more truckloads of Lover's beer. It appears that the beer is becoming more popular from week to week. Week 13: There is still a huge backlog. Weeks 14-15: The wholesaler receives larger shipments from the brewery, but orders from retailers begin to drop off. Week 16: The trucker delivers 55 truckloads from the brewery, but the wholesaler gets zero orders from retailers. So he stops ordering from the brewery. Week 17: The wholesaler receives another 60 truckloads. Retailers order zero. The wholesaler orders zero. The brewery keeps sending beer. 3.3 The Brewery The brewery is small but has a reputation for producing high quality beer. Lover's beer is only one of several products produced at the brewery. Week 6: New orders come in for 40 gross. It takes two weeks to brew the beer. MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
Week 14: Orders continue to come in and the brewery has not been able to catch up on the backlogged orders. The marketing manager begins to wonder how much bonus he will get for increasing sales so dramatically. Week 16: The brewery catches up on the backlog, but orders begin to drop off. Week 18: By week 18 there are no new orders for Lover's beer. Week 19: The brewery has 100 gross of Lover's beer in stock, but no orders. So the brewery stops producing Lover's beer. Weeks 20-23. No orders. At this point all the players blame each other for the excess inventory. Conversations with wholesale and retailer reveal an inventory of 93 cases at the retailer and 220 truckloads at the wholesaler. The marketing manager figures it will take the wholesaler a year to sell the Lover's beer he has in stock. The retailers must be the problem. The retailer explains that demand increased from 4 cases per week to 8 cases. The wholesaler and marketing manager think demand mushroomed after that, and then fell off, but the retailer explains that didn't happen. Demand stayed at 8 cases per week. Since he didn't get the beer he ordered, he kept ordering more in an attempt to keep up with the demand. The marketing manager plans his resignation. 3.4 Lessons from the Beer Game 1. The structure of a system influences behavior. Systems cause their own problems, not external forces or individual errors. 2. Human systems include the way in which people make decisions. MB0044 Production & Operations Management Fall - 2011 (Set-I)
MBA Semester-02
________________________________________________________________ ______________ ________________________________________________________________ ________________ 3. People tend to focus on their own decisions and ignore how these decisions affect others. 3.5 Lessons Related to the Learning Disabilities 1. People do not understand how their actions affect others. 2. So they tend to blame each other for problems. 3. Becoming proactive causes more problems. 4. The problems build gradually, so people don't realize there is a problem until its too late. 5. People don't learn from their experience because the effects of their actions occur somewhere else in the system.
(Set-I)
MBA Semester-02
(Set-I)
MBA Semester-02
Q.6 TIME TAKEN BY THREE MACHINES ON FIVE JOBS IN A FACTORY IS TABULATED BELOW IN TABLE BELOW. FIND OUT THE OPTIMAL SEQUENCE TO BE FOLLOWED TO MINIMIZE THE IDLE TIME TAKEN BY THE JOBS ON THE MACHINES.
Job
A B C D E
JOB = D E C A B
(Set-I)
MBA Semester-02
(Set-I)