Progress Matrix Table - Mep Works: Project: Client: Consultant: Main Constractor

The document appears to be a progress matrix for an MEP (mechanical, electrical, plumbing) works project. It contains tables outlining timelines in days and manhours for various MEP works across different floors/levels of a building. The tables include items like ductwork, piping, electrical conduits, equipment installation, testing and commissioning. The progress is planned in detail down to specific tasks for each floor to monitor and ensure the timely completion of the MEP project.

Uploaded by

Assem Elhajj
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

Progress Matrix Table - Mep Works: Project: Client: Consultant: Main Constractor

The document appears to be a progress matrix for an MEP (mechanical, electrical, plumbing) works project. It contains tables outlining timelines in days and manhours for various MEP works across different floors/levels of a building. The tables include items like ductwork, piping, electrical conduits, equipment installation, testing and commissioning. The progress is planned in detail down to specific tasks for each floor to monitor and ensure the timely completion of the MEP project.

Uploaded by

Assem Elhajj
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

AS OF :

PROJECT:
CLIENT:
CONSULTANT:
MAIN CONSTRACTOR:

PROGRESS MATRIX TABLE - MEP WORKS


6

25

24

15

Page 1 of 4

Bus bar (Vertical +


Horizontal)

Cable pulling for riser


Cable trays (Main power
cable riser)

Cable tray & trunking


(Power & Low Current)

11

12

Days Mhrs Days Mhrs Days Mhrs Days Mhrs


Mhrs
Days Mhrs Days Mhrs Days Mhrs

15

10

PUMP ROOM + SUB STATION WORKS

30

12

Days

Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs

Plaza Level-1
Plaza Level-2
Plaza Level-3
Plaza Level-4
Tower Basement Floor
Ground Floor
Level - 1
Level - 2
Level - 3
Level - 4
Level - 5
Level - 6
Level - 7
Level - 8
Level - 9
Level - 10
Level - 11
Level - 12
Level - 13
Level - 14
Level - 15
Level - 16
Level - 17
Level - 18
Level - 19
Level - 20
Level - 21
Level - 22
Level - 23
Level - 24
Level - 25
Level - 26
Level - 27
Level - 28
ROOF -1

25

Duct riser Apartment

Drainage riser Core

Water supply risers &


core

Electrical floor conduits

UPS install. (above fall


ceiling)

Apartment DB
Enclosures

Electrical wall conduits

Cable tray (GSM)

Chilled water Tower


area/ Plaza / Roof

Fire Fighting Tower


area/ Plaza / Roof

Duct Apartment /
Podium area / Roof

Drainage riser Tower


area/ Plaza / Roof

Water supply Tower


area/ Plaza / Roof

Floor Levels

RISER WORKS

Fire Fighting pump room


works

10

30

Plumbing & Drain pump


room works

TOWER AREA WORKS

18

Chilled water pump


room works

45

10

25

Cable pulling for riser


Cable trays (Low
Current)

15

Page 2 of 4

HVAC Testing , Adjusting


, Balancing &
Commissioning

20

Days MhrsDaysDays Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs
Mhrs
Days Mhrs Days Mhrs Days

90

Fire fighting Sys testing


& comm.

19

30

Plumbing testing &


comm. works

18

PLOT UTILITY CONNECTIONS

15

17

ENVAC ( Vacuum solid


waste connection )

Structured Cabling
system (Active
Component/IDF MDF )

16

15

KAHRAMAA Power
supply ( TF & HV Switch
gear )

15

30

Portable Water + Drain


connection

14

PUMP ROOM + SUB STATION WORKS

10

Chilled water
Connection @Qatar Cool

Electrical Substation
room works

13

20

AS OF :

E - MEP WORKS
TESTING & COMM. WORKS

21

Mhrs

AS OF :

PROJECT:
CLIENT:
CONSULTANT:
MAIN CONSTRACTOR:

PROGRESS MATRIX TABLE - MEP 1st Fix WORKS


11

DFCU Units

12

13

14

15

16

17

18

Ceiling
rose+flexible
Cable

10

Building wire

Power cables

Low current
Cable

Chilled water
pipes

Fire Fighting
pipes

Drain pipes

Duct risers

Water supply
pipes

Elec- wall
Box's &
conduits
Days

Plaza Level-1
Plaza Level-2
Plaza Level-3
Plaza Level-4
Tower Basement Floor
Ground Floor
Level - 1
Level - 2
Level - 3
Level - 4
Level - 5
Level - 6
Level - 7
Level - 8
Level - 9
Level - 10
Level - 11
Level - 12
Level - 13
Level - 14
Level - 15
Level - 16
Level - 17
Level - 18
Level - 19
Level - 20
Level - 21
Level - 22
Level - 23
Level - 24
Level - 25
Level - 26
Level - 27
Level - 28
ROOF -1

Duct work

Floor Conduits

Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs

25

12

10

15

10

12

90

18

20

60

10

30

15

15

10

15

10

12

18

12

10

20

10

10

12

18

12

10

20

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

12

10

14

24

12

10

12

30

12

10

14

12

12

25

10

25

15

10

10

Page 3 of 4

AS OF :
PROJECT:
CLIENT:
CONSULTANT:
MAIN CONSTRACTOR:

21

22

23

24

25

26

27

28

26

Stand by
Generator

20

Low current
system

Fire Alarm
devices

19

Elevator 's

lighting fixture

18

Exhaust Fans

Wiring devices

17

Air Handling
units

Core duct
risers

16

Water supply
pumps

Air terminal
devices

15

F.Fighting
Pumps

Water supply
P.R.V

14

Chilled water
pumps

ZCV ( Zone
Control
Valves)

13

BMS system

Sanitary
fixture

Mhrs

12

MCC &M.V
panel

F.H. cabinet

Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days

11

Bus bar
installation

10

Cable tray
(GSM)

Low current
cables risers

BTU meters
installation

Water meters
installation

Chilled water
riser

Water supply
risers

Ele. Room
D.B's Install. &
termination

Sprinklers

Chilled water
valves

PROGRESS MATRIX TABLE - MEP 2nd. Fix WORKS


1

Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs Days Mhrs

Plaza Level-1
Plaza Level-2
Plaza Level-3
Plaza Level-4
Tower Basement Floor

15

10

12

25

10

18

25

Ground Floor

10

20

15

Level - 1

Level - 2

10

10

12

Level - 3

10

10

12

Level - 4

10

10

12

Level - 5

10

10

12

Level - 6

10

10

12

Level - 7

10

10

12

Level - 8

10

10

12

Level - 9

10

10

12

Level - 10

10

10

12

Level - 11

10

10

12

Level - 12

10

10

12

Level - 13

10

10

12

Level - 14

10

10

12

Level - 15

10

10

12

Level - 16

10

10

12

Level - 17

10

10

12

Level - 18

10

10

12

Level - 19

10

10

12

Level - 20

10

10

12

Level - 21

10

10

12

Level - 22

10

10

12

Level - 23

10

10

12

Level - 24

10

10

12

Level - 25

10

10

12

Level - 26

10

10

12

Level - 27

10

12

Level - 28

10

ROOF -1

15

Page 4 of 4

20

12

12

12

12

10