Some Common Defects in Steel Structural Erection at Project Site
Some Common Defects in Steel Structural Erection at Project Site
BY PRABIR DATTA,B.Sc,F.I.E(I) LIFE FELLOW,INSTITUTION OF ENGINEERS(I) LIFE MEMBER,CONSULTING ENGINEERS ASSOCIATION OF INDIA(FIDIC AFFILIATED)
MULTIPLE RUN OF WELDING AND PLATE FIXING OVER OTHER WELDED JOINTS
ROOT GAP MUCH MORE THAN RECOMMENDED IN 32 MM THICK HIGH LOAD BEARING PLATES
BAD WORKMANSHIP
THANK YOU