Reem-2 (T2) Test Report Status: SL NO. Description Submittal To Consultant Received From Consultant Files Remarks

This document provides a status report on test reports for the REEM-2(T2) project. It contains a list of 22 test report descriptions in the first column, notes whether the report was submitted to the consultant or received from the consultant in the second column, and notes the number of associated files in the third column. The fourth column provides additional remarks for some of the reports.

Uploaded by

gavinilaa
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views

Reem-2 (T2) Test Report Status: SL NO. Description Submittal To Consultant Received From Consultant Files Remarks

This document provides a status report on test reports for the REEM-2(T2) project. It contains a list of 22 test report descriptions in the first column, notes whether the report was submitted to the consultant or received from the consultant in the second column, and notes the number of associated files in the third column. The fourth column provides additional remarks for some of the reports.

Uploaded by

gavinilaa
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

REEM-2(T2) TEST REPORT STATUS

SL NO.
1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Description
TRANSCO ( 132kV GIS) 0.4KV LVAC Test report IR Values - LV power Cables IR Values - LV Control Cable 132kV Disconnector & CB Timing 132kV CT Test Reports 132kV VT Test Reports 132kV Protection Backup & Aux.Relays 132kV CT & VT Sec. InJection Report& loop Resistance 48v DC system 110V DC system 132kV HV Test Measurement 132kV Protection Main Relays 132KV BCU & 22 non num BCU,REC670 Bus bar protection (Stability +component) 132kV protection panel( siemens) 132kV CT Primary Injection Test report 132KV power cable 132kv cable feeder final settings ABB/Siemens 132kV Transformer feeder final settings 132kV GIS Interlock END - END test(ABB & Siemens) 132kV Relay settings ADDC (22Kv GIS) 0.4kV LVAC Test Report 1MVA Aux. Transformer test Reports 22kV Bus Bar Contact Resistance report 22kv CT Test Reports 22kV CB Timing Reports 22kV Disconnector & Earthing Switch timing Reports 22kV GIS Gas GMDX sensors 110V DC system 22kV GIS REF 545 Test reports 22kV Relay Panel Back up and Aux. 22kv CT Test Reports 22kv VT Secondary Injection Checks 22KV CT Primary Injection Report 22kv CT Secondary Injection Checks 22kV GIS HV Test report SPAF 340 C3 Relay SPAU 140 C Relay 22kV Metering panel test report 22kV scms Measurement 22kV Scms Signal list 22kv BB stability test & component test 22kv Relay setting calculation

Submittal To Consultant

Received From Consultant


LI signed pending pending LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed

Files
1 1 2 1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8 2 1 1 2 1

Remarks

with consultant

LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed LI signed

1 1 1 1 1 1 1 2 1 1

1 2 3 4 5 6

80MVA TRANSFORMERS 80 MVA Transformer CT Reports SFRA Test Reports 80 MVA Transformer Test report 80MVA TRAFO stability report 80MVA TRAF sec Inj & loop Resistance,VA 80MVA Trrfo oil test report

LI Signed LI Signed LI Signed LI Signed LI Signed LI Signed

1 1 1 1 1 1

1 2 3

GENERAL NGR & NGBS ,Contact Resistance for NGBS Test report PSMS (22kV & 132kV ) AVR & FMS test reports

LI Signed LI Signed LI Signed

1 2 1