Project Report For Fly Ash Bricks and It'S Allied Products: Plant & Machinery
Project Report For Fly Ash Bricks and It'S Allied Products: Plant & Machinery
a) Number of Working Days / Year b) Number of Shift / Day c) Number of Working Hrs. / Shift d) Item of Production e) Annual Installation capacity of product f) Annual Target of Production ( i.e. activity level ) g) Total Electric Power : 300 Days : Single : 08 Hours : Fly ash bricks & allied products : 108 lacs
: 90 lacs
: 22.38 K.W.
Sl. Description 1 Fly ash bricks making machine, 30 ton capacity 2 Pan Mixture, 500 kg.capacity 3 Belt conveyer 4 Wheel Barroes 5 Extra Mould Size-230x 110x 75mm 6 Hydrolic pallet truck 7 Tools, Equipments & other accessories 8 Sales tax
Qty. 1
Amount 550000.00
1 1 2 1 2
A. RAW MATEREIALS EXPENDITURE / MONTH :Raw materials (For production of 1000 nos. Bricks)
Sl. 1 2 3 4
B. SALARY & WAGES :Sl. 1 2 3 4 5 6 7 8 9 10 11 POST Manager Forman Supervisor Security Guard Office bearer Machine Operator Asstt. Machine Operator Mixer Man Water sprayer Un-skilled labour Factory Bearer TOTAL : No. 1 2 2 2 1 1 2 2 2 6 2 RATE 5000 4000 3500 2500 2000 4500 3750 3750 5500 3000 2250 AMOUNT 5000 8000 7000 5000 2000 4500 7500 7500 11000 18000 4500 80,000
Miscellaneous Expenditure : Srl 1 2 3 4 5 6 7 8 9 Description Rent Electric Power Fuel Transportation & Conveyance Repairing, Replacement & Maintenance Advertisement & Donation Taxes, Insurance & Licence Incentive (Labour Benefit) Contingency TOTAL : Amount Nil 60000 16000 10000 12000 2000 10000 5000 2000 117000
Tentative Profit & Loss Account per Month Description TO Recurring Expenditure Depreciation of Plant & m/c & Equipment @10% per annum of Rs.1135000 Depreciation of Building @5% per annum Of Rs.2350000/Depreciation of Furniture & Fixture @ 5% per annum of Rs.25000/Interest on Unsecured Loan Gross Profit Before Tax TOTAL Amount SL. ITEM BY 2225750.00 1 9458.00 2 Fly ash bricks QTY. UNIT Rate Amount
7,50,000 pcs
9792.00 3
104.00 4
2775000.00