Two Way Slab
Two Way Slab
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.12 1.5
N/mm mm Two Way 4725 mm 26 15 mm 147 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.12 0.044 0.0328
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.044 0.033 5.955 121 Ast Min 180 Ast red 300 Ast pro 335 165 150 Ast pro 223 255 225 kN-m mm2 mm mm kN-m mm2 mm mm
6.526 117 8
4.439 79
168 Spacing Provided= Ast Min Ast red 180 196 257 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.037 0.028 5.008 102 Ast Min 180 Ast req 253 Astpro 287 195 175 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
2.842 54 8
3.790 72
199 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x4.248-0.127) = 36.99 kN-m 36994.425/ (1000X127) = 0.29 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 17.02 tc = 0.31 0.4 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X fck Igr = = 3.50 MPa = = Mcr = 13.125 > 7.310 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 2.18 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.297 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.297 x 0.0005 X 4248 X 4248 / 150 1.13 mm =
Type < 1
CRB AT DELHI FIRST FLOOR SLAB DESIGN q 2.2 1.6 1.1 = 20.80 = 0.036 = 0.233 = 30.52 mm 56390958.18 281250000 0.707
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.233 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
DATE DESIGNED BY CHECKED BY Age Of Loading For days 7 For days 28 For days 365
= 79975830.630
5 MD L2 48 Ece Ieff
= 10.63 mm = 6.87 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 4.09 mm
cp
6.54 + 1.13
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3543.75 3186
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
591 531
mm mm
150 225
LONG SPAN 8 8
175 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@150 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@175 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.04 1.5
N/mm mm Two Way 4400 mm 26 15 mm 136 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.04 0.034 0.0256
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.034 0.026 4.602 93 Ast Min 180 Ast red 231 Ast pro 251 215 200 Ast pro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
5.093 91 8
3.465 61
218 Spacing Provided= Ast Min Ast red 180 180 279 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.032 0.024 4.331 88 Ast Min 180 Ast req 218 Astpro 251 230 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
2.436 46 8
3.248 61
230 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x4.248-0.127) = 36.99 kN-m 36994.425/ (1000X127) = 0.29 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 17.02 tc = 0.31 0.4 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 5.705 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 1.71 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.297 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.297 x 0.0005 X 4248 X 4248 / 150 1.13 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.233 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.036 = 0.233 = 30.52 mm 56390958.18 281250000 0.707 = 79975830.630
5 MD L2 48 Ece Ieff
= 8.30 mm = 5.36 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 3.19 mm
cp
5.11 + 1.13
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3300 3186
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
550 531
mm mm
200 225
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.37 1.5
N/mm mm Two Way 8890 mm 26 15 mm 234 mm 250 mm 10 mm 8 mm dx = 230 dy = 221 Load (kN/m ) 6.25 0 3.6 0 0 9.85 14.775 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.37 0.0612 0.0461
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.061 0.046 19.608 218 Ast Min 300 Ast red 657 Ast pro 785 115 100 Ast pro 449 175 175 kN-m mm2 mm mm kN-m mm2 mm mm
29.097 299 10
14.770 150
119 Spacing Provided= Ast Min Ast red 300 448 175 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.037 0.028 11.855 130 Ast Min 300 Ast req 388 Astpro 402 125 125 Astpro 335 165 150 kN-m mm2 mm mm kN-m mm2 mm mm
6.728 70 8
8.971 94
130 Spacing Provided= Ast Min Ast req 300 300 168 Spacing Provided=
tv = tc = b= b= tc*k =
=( 230+221 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 14.775+7.5 ) x ( 0.5x6.536-0.2255) = 67.77 kN-m 67771.6875/ (1000X225.5) = 0.30 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 14.88 tc = 0.33 0.36 > tv DL+ LL
225.5
k= SAFE
1.1
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 36.458 > 29.245 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 4.47 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.318 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.318 x 0.0005 X 6536 X 6536 / 250 1.71 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.247 X 230 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.041 = 0.247 = 56.81 mm 341117525.3 1302083333 0.691 = 476221590.580
5 MD L2 48 Ece Ieff
D+L
WDL WDL+WLL
i+cp
D+L
= 7.25 mm
cp
11.6 + 1.71
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 10 10
6667.5 4902
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
1111 817
mm mm
100 175
LONG SPAN 8 8
125 150
TWOWAY SLAB THICKNESS = 250 MM PROVIDE 10@100 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@125 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 10@175 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@150 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.38 1.5
N/mm mm Two Way 4570 mm 26 15 mm 119 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.38 0.0792 0.0594
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.079 0.059 6.587 134 Ast Min 180 Ast red 333 Ast pro 335 150 150 Ast pro 251 230 200 kN-m mm2 mm mm kN-m mm2 mm mm
7.262 130 8
4.940 88
151 Spacing Provided= Ast Min Ast red 180 218 231 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0 0.043 0.000 0 8
0 0.043 0.000 0 Ast Min 180 Ast req 180 Astpro 251 275 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
2.682 51 8
3.576 68
279 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x3.33-0.127) = 28.49 kN-m 28491.45/ (1000X127) = 0.22 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 15.13 tc = 0.32 0.42 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 8.135 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 1.49 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.315 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.315 x 0.0005 X 3330 X 3330 / 150 0.73 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.245 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.040 = 0.245 = 32.10 mm 62157758.92 281250000 0.693 = 86946088.845
5 MD L2 48 Ece Ieff
= 6.69 mm = 4.32 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 2.57 mm
cp
4.12 + 0.73
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3427.5 2497.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
571 416
mm mm
150 200
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@150 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.35 1.5
N/mm mm Two Way 4578 mm 26 15 mm 113 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.35 0.053 0.04
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.053 0.040 4.622 93 Ast Min 180 Ast red 232 Ast pro 251 215 200 Ast pro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
5.128 91 8
3.488 62
217 Spacing Provided= Ast Min Ast red 180 180 279 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.037 0.028 3.227 65 Ast Min 180 Ast req 180 Astpro 251 275 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
1.831 34 8
2.442 46
279 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x3.41-0.127) = 29.23 kN-m 29232.45/ (1000X127) = 0.23 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 17.02 tc = 0.31 0.4 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 5.744 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 1.11 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.297 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.297 x 0.0005 X 3410 X 3410 / 150 0.73 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.233 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.036 = 0.233 = 30.52 mm 56390958.18 281250000 0.707 = 79975830.630
5 MD L2 48 Ece Ieff
= 5.38 mm = 3.48 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 2.07 mm
cp
3.31 + 0.73
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3433.5 2557.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
572 426
mm mm
200 225
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.30 1.5
N/mm mm Two Way 4427 mm 26 15 mm 113 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.30 0.047 0.036
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.047 0.036 4.099 83 Ast Min 180 Ast red 205 Ast pro 251 245 200 Ast pro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
4.615 82 8
3.140 56
245 Spacing Provided= Ast Min Ast red 180 180 279 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.032 0.024 2.791 56 Ast Min 180 Ast req 180 Astpro 251 275 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
1.570 29 8
2.093 39
279 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x3.41-0.127) = 29.23 kN-m 29232.45/ (1000X127) = 0.23 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 17.02 tc = 0.31 0.4 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 5.170 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 1.00 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.297 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.297 x 0.0005 X 3410 X 3410 / 150 0.73 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.233 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.036 = 0.233 = 30.52 mm 56390958.18 281250000 0.707 = 79975830.630
5 MD L2 48 Ece Ieff
= 4.85 mm = 3.13 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 1.86 mm
cp
2.98 + 0.73
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3320.25 2557.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
553 426
mm mm
200 225
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.06 1.5
N/mm mm Two Way 4710 mm 26 15 mm 149 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.06 0.0412 0.031
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.041 0.031 6.152 125 Ast Min 180 Ast red 310 Ast pro 314 160 160 Ast pro 251 245 200 kN-m mm2 mm mm kN-m mm2 mm mm
6.805 122 8
4.629 82
162 Spacing Provided= Ast Min Ast red 180 204 246 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.037 0.028 5.525 113 Ast Min 180 Ast req 280 Astpro 287 175 175 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
3.136 59 8
4.181 79
180 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x4.462-0.127) = 38.98 kN-m 38976.6/ (1000X127) = 0.31 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 15.13 tc = 0.32 0.42 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 7.622 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 2.51 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.315 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.315 x 0.0005 X 4462 X 4462 / 150 1.32 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.245 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.040 = 0.245 = 32.10 mm 62157758.92 281250000 0.693 = 86946088.845
5 MD L2 48 Ece Ieff
= 11.25 mm = 7.27 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 4.33 mm
cp
6.93 + 1.32
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3532.5 3346.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
589 558
mm mm
160 200
LONG SPAN 8 8
175 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@160 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@175 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.11 1.5
N/mm mm Two Way 4885 mm 26 15 mm 144 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.11 0.0376 0.0284
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.038 0.028 5.527 112 Ast Min 180 Ast red 278 Ast pro 287 180 175 Ast pro 251 270 200 kN-m mm2 mm mm kN-m mm2 mm mm
6.136 110 8
4.174 74
181 Spacing Provided= Ast Min Ast red 180 184 274 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.032 0.024 4.704 96 Ast Min 180 Ast req 237 Astpro 251 210 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
2.646 50 8
3.528 67
212 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x4.427-0.127) = 38.65 kN-m 38652.4125/ (1000X127) = 0.30 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 15.13 tc = 0.32 0.42 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 6.874 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 2.23 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.315 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.315 x 0.0005 X 4427 X 4427 / 150 1.30 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.245 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.040 = 0.245 = 32.10 mm 62157758.92 281250000 0.693 = 86946088.845
5 MD L2 48 Ece Ieff
= 9.99 mm = 6.46 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 3.84 mm
cp
6.15 + 1.3
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3663.75 3320.25
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
611 553
mm mm
175 200
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@175 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.02 1.5
N/mm mm Two Way 4575 mm 26 15 mm 148 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.02 0.0384 0.029
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.038 0.029 5.832 118 Ast Min 180 Ast red 294 Ast pro 296 170 170 Ast pro 251 255 200 kN-m mm2 mm mm kN-m mm2 mm mm
6.474 116 8
4.404 78
171 Spacing Provided= Ast Min Ast red 180 194 259 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.037 0.028 5.619 115 Ast Min 180 Ast req 285 Astpro 287 175 175 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
3.189 60 8
4.253 81
176 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x4.5-0.127) = 39.33 kN-m 39328.575/ (1000X127) = 0.31 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 15.13 tc = 0.32 0.42 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 7.253 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 2.43 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.315 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.315 x 0.0005 X 4500 X 4500 / 150 1.34 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.245 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.040 = 0.245 = 32.10 mm 62157758.92 281250000 0.693 = 86946088.845
5 MD L2 48 Ece Ieff
= 10.89 mm = 7.04 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 4.19 mm
cp
6.7 + 1.34
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3431.25 3375
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
572 563
mm mm
170 200
LONG SPAN 8 8
175 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@170 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@175 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.63 1.5
N/mm mm Two Way 7000 mm 26 15 mm 148 mm 175 mm 8 mm 8 mm dx = 156 dy = 148 Load (kN/m ) 4.375 0 3.6 0 0 7.975 11.9625 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.63 0.06064 0.04608
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.061 0.046 8.409 140 Ast Min 210 Ast red 367 Ast pro 402 135 125 Ast pro 251 200 200 kN-m mm2 mm mm kN-m mm2 mm mm
10.192 153 8
6.390 95
137 Spacing Provided= Ast Min Ast red 210 249 202 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.037 0.028 5.131 85 Ast Min 210 Ast req 222 Astpro 251 225 200 Astpro 223 235 225 kN-m mm2 mm mm kN-m mm2 mm mm
2.912 46 8
3.883 61
226 Spacing Provided= Ast Min Ast req 210 210 239 Spacing Provided=
tv = tc = b= b= tc*k =
=( 156+148 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.9625+7.5 ) x ( 0.5x4.3-0.152) = 38.89 kN-m 38886.075/ (1000X152) = 0.26 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 18.02 tc = 0.3 0.38 > tv DL+ LL
152
k= SAFE
1.25
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 17.865 > 11.055 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 2.13 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.289 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.289 x 0.0005 X 4300 X 4300 / 175 0.96 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.228 X 156 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.034 = 0.228 = 35.57 mm 90819380.34 446614583.3 0.713 = 129575375.002
5 MD L2 48 Ece Ieff
= 10.50 mm = 6.57 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 4.04 mm
cp
6.46 + 0.96
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
5250 3225
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
875 538
mm mm
125 200
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 175 MM PROVIDE 8@125 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.14 1.5
N/mm mm Two Way 4700 mm 26 15 mm 150 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.14 0.0558 0.042
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.056 0.042 7.208 147 Ast Min 180 Ast red 365 Ast pro 372 135 135 Ast pro 251 205 200 kN-m mm2 mm mm kN-m mm2 mm mm
7.975 143 8
5.425 97
138 Spacing Provided= Ast Min Ast red 180 240 210 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.047 0.035 6.071 124 Ast Min 180 Ast req 308 Astpro 335 160 150 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
3.391 64 8
4.521 86
163 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x4.15-0.127) = 36.09 kN-m 36086.7/ (1000X127) = 0.28 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 15.13 tc = 0.32 0.42 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 8.933 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 2.55 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.315 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.315 x 0.0005 X 4150 X 4150 / 150 1.14 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.245 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.040 = 0.245 = 32.10 mm 62157758.92 281250000 0.693 = 86946088.845
5 MD L2 48 Ece Ieff
= 11.41 mm = 7.37 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 4.39 mm
cp
7.02 + 1.14
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3525 3112.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
588 519
mm mm
135 200
LONG SPAN 8 8
150 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@135 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@150 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.64 1.5
N/mm mm Two Way 5000 mm 26 15 mm 105 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.64 0.08004 0.05992
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.080 0.060 5.584 113 Ast Min 180 Ast red 281 Ast pro 287 175 175 Ast pro 223 270 225 kN-m mm2 mm mm kN-m mm2 mm mm
6.145 110 8
4.181 74
179 Spacing Provided= Ast Min Ast red 180 184 273 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.047 0.035 3.279 66 Ast Min 180 Ast req 180 Astpro 251 275 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
1.831 34 8
2.442 46
279 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x3.05-0.127) = 25.90 kN-m 25897.95/ (1000X127) = 0.20 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 17.02 tc = 0.31 0.4 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 6.884 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 1.06 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.297 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.297 x 0.0005 X 3050 X 3050 / 150 0.58 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.233 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.036 = 0.233 = 30.52 mm 56390958.18 281250000 0.707 = 79975830.630
5 MD L2 48 Ece Ieff
= 5.16 mm = 3.34 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 1.99 mm
cp
3.18 + 0.58
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
3750 2287.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
625 381
mm mm
175 225
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@175 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.02 1.5
N/mm mm Two Way 3500 mm 26 15 mm 114 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.02 0.0384 0.029
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.038 0.029 3.428 69 Ast Min 180 Ast red 180 Ast pro 251 275 200 Ast pro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
3.806 68 8
2.589 46
279 Spacing Provided= Ast Min Ast red 180 180 279 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.037 0.028 3.303 67 Ast Min 180 Ast req 180 Astpro 251 275 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
1.875 35 8
2.500 47
279 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x3.45-0.127) = 29.60 kN-m 29602.95/ (1000X127) = 0.23 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 17.02 tc = 0.31 0.4 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 4.263 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 0.84 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.297 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.297 x 0.0005 X 3450 X 3450 / 150 0.74 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.233 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.036 = 0.233 = 30.52 mm 56390958.18 281250000 0.707 = 79975830.630
5 MD L2 48 Ece Ieff
= 4.09 mm = 2.64 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 1.57 mm
cp
2.52 + 0.74
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
2625 2587.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
438 431
mm mm
200 225
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD Load (kN/m2) LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.55 1.5
N/mm mm Two Way 3485 mm 26 15 mm 81 mm 150 mm 8 mm 8 mm dx = 131 dy = 123 Load (kN/m ) 3.75 0 3.6 0 0 7.35 11.025 kN/m2
2
mm
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.55 0.0768 0.0574
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.077 0.057 2.916 59 Ast Min 180 Ast red 180 Ast pro 251 275 200 Ast pro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
3.204 57 8
2.179 38
279 Spacing Provided= Ast Min Ast red 180 180 279 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 290 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0.047 0.035 1.785 36 Ast Min 180 Ast req 180 Astpro 251 275 200 Astpro 223 275 225 kN-m mm2 mm mm kN-m mm2 mm mm
0.997 19 8
1.329 25
279 Spacing Provided= Ast Min Ast req 180 180 279 Spacing Provided=
tv = tc = b= b= tc*k =
=( 131+123 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 11.025+7.5 ) x ( 0.5x2.25-0.127) = 18.49 kN-m 18487.95/ (1000X127) = 0.15 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 17.02 tc = 0.31 0.4 > tv DL+ LL
127
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X f Igr = ck = 3.50 MPa = = Mcr = 13.125 > 3.589 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 0.30 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.297 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.297 x 0.0005 X 2250 X 2250 / 150 0.32 mm =
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 25/ ( 1 + 1.6) 9615.38 MPa m= Es / Ece =200000 / 9615.38 $I$54*1e-02/($D$13*10) x 20.8 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.233 X 131 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 20.80 = 0.036 = 0.233 = 30.52 mm 56390958.18 281250000 0.707 = 79975830.630
5 MD L2 48 Ece Ieff
= 1.46 mm = 0.95 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 0.56 mm
cp
0.9 + 0.32
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
2613.75 1687.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
436 281
mm mm
200 225
LONG SPAN 8 8
200 225
TWOWAY SLAB THICKNESS = 150 MM PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@225 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
CONCRETE GRADE STEEL GRADE Length along short direction Length along long direction Span / Depth Ratio Assumed Cover for reinforcement Overall depth required Overall depth provided Dia of Bar (Short Dir.) Dia of Bar (Long Dir.) Effective depth of slab DEAD LOAD Self weight Ceiling load if any Additional Dead loads Floor finish Services TOTAL Factored Dead load LIVE LOAD LIVE LOAD TOTAL Factored Live load Ratio (lx / ly) 1.5 1.09 1.5
N/mm mm Two Way 1900 mm 20 20 mm 86 mm 100 mm 8 mm 8 mm dx = 76 dy = 68 Load (kN/m ) 2.5 0 1 0 0 3.5 5.25 kN/m2
2
mm
` kN/m2 kN/m
2
Case
ly / lx ax -ve ax +ve Short Span Coeff 1.09 0 0.0632
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar(required) Spacing of bar
0.000 0.063 0.000 0 Ast Min 120 Ast red 120 Ast pro 251 225 200 Ast pro 251 225 200 kN-m mm2 mm mm kN-m mm2 mm mm
1.016 37 8
0.218 8
228 Spacing Provided= Ast Min Ast red 120 120 228 Spacing Provided=
CRB AT DELHI FIRST FLOOR SLAB DESIGN DEAD LOAD LIVE LOAD
ALPHA at continuous edge ALPHA at mid-span Negative moment at continuous edge Ast per meter width Diameter of bar Spacing of bar Positive moment at mid-span Ast per meter width Diameter of bar Spacing of bar CHECK FOR DEFLECTION: Fs 240 Modification factor : = Required depth = CHECK FOR SHEAR: Average Effective Depth = Vu
=
0 0.056 0.000 0 8
0 0.056 0.000 0 Ast Min 120 Ast req 120 Astpro 251 225 200 Astpro 251 225 200 kN-m mm2 mm mm kN-m mm2 mm mm
0.965 40 8
0.193 8
228 Spacing Provided= Ast Min Ast req 120 120 228 Spacing Provided=
tv = tc = b= b= tc*k =
=( 76+68 ) / 2 deff.avg. Wu (0.5Lx clear span -deff.avg.) =( 5.25+1.125 ) x ( 0.5x1.75-0.072) = 5.12 kN-m 5119.125/ (1000X72) = 0.07 N/mm2 0.85 x (0.80fck) ( 1+5b-1)/(6b) (0.8*fck)/(6.89pt)or 1 whichever is greter 7.02 tc = 0.4 0.52 > tv DL+ LL b X D^3/12 83333333.33 MPa KNm/m
72
k= SAFE
1.3
MAXIMUM SHORT TERM DEFLECTION: Mcr = fcr X Igr/ ( 0.5 X D ) fcr 0.7 X fck Igr = = 3.13 MPa = = Mcr = 5.217 > 0.823 Mcr > M Hence Ieff = Igr maximum short term deflection 5 ML2 48 EIeff 0.14 mm =
(Uncracked Section)
DEFLECTION DUE TO SHRINKAGE: k3 k4 ecs L2/D Where K3 = 0.063 for fully continuous 0.72 X pt = K4 = 0.414 ecs = 0.0005 clause 6.2.4 and IS :1343 0.063 X 0.414 x 0.0005 X 1750 X 1750 / 100
Type < 1
DEFLECTION DUE TO CREEP: Considered For days 28 Ece = Ec /( 1+ q ) = 5000 X 20/ ( 1 + 1.6) 8600.26 MPa m= Es / Ece =200000 / 8600.26 $I$54*1e-02/($D$13*10) x 23.26 rm = 2 (rm ) + (rm )^2 - (rm ) k= 0.323 X 76 kd = b(kd)^3/3 + mAst(d-kd)^2 Icr = Igr = 1000 x D^3/12 Igr > Icr h = j ( 1- k ) ( bw / b ) Ieff. = Icr 1.2-(Mcr/MD+L) h Igr > Ieff
i+cp
Age Of Loading q 2.2 For days 7 1.6 For days 28 1.1 For days 365 = 23.26 = 0.077 = 0.323 = 24.55 mm 20406745.2 83333333.33 0.604 = 26256748.839
5 MD L2 48 Ece Ieff
= 0.96 mm = 0.45 mm
D+L
WDL WDL+WLL
i+cp
D+L
= 0.37 mm
cp
0.59 + 0.4
LX / 250
SAFE
Short Span Middle Strip = 3/4 ly= Long Span Middle Strip = 3/4 lx= REQUIRED DIAMETER & SACING OF BAR: SHORT SPAN 8 8
1425 1312.5
mm mm
Short Span Edge Strip = 1/8 ly= Long Span Edge Strip = 1/8 lx=
238 219
mm mm
200 200
LONG SPAN 8 8
200 200
TWOWAY SLAB THICKNESS = 100 MM PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS TOP REINFORCEMENT ALONG LONG DIMENSION PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG SHORT DIMENSION. PROVIDE 8@200 MM C/C AS BOTTOM REINFORCEMENT ALONG LONG DIMENSION
SHORT SPAN COEFFICIENTS ax ax -ve ax +ve ax -ve ax +ve ax -ve ax +ve ax -ve ax +ve ax -ve ax +ve ax -ve ax +ve ax -ve ax +ve ax -ve ax +ve ax -ve ax +ve 1 0.032 0.024 0.037 0.028 0.037 0.028 0.047 0.035 0.045 0.035 0 0.035 0.057 0.043 0 0.043 0 0.056 1.1 0.037 0.028 0.043 0.032 0.044 0.033 0.053 0.04 0.049 0.037 0 0.043 0.064 0.048 0 0.051 0 0.064 1.2 0.043 0.032 0.048 0.036 0.052 0.039 0.06 0.045 0.052 0.04 0 0.051 0.071 0.053 0 0.059 0 0.072 1.5 0.053 0.041 0.057 0.044 0.067 0.051 0.075 0.056 0.06 0.045 0 0.068 0.084 0.064 0 0.076 0 0.089 1.75 0.06 0.045 0.064 0.048 0.077 0.059 0.084 0.063 0.065 0.049 0 0.08 0.091 0.069 0 0.087 0 0.1 2 0.065 0.049 0.068 0.052 0.085 0.065 0.091 0.069 0.069 0.052 0 0.088 0.097 0.073 0 0.096 0 0.107
1 Interior Punels: 2 One Short Edge Continuous: 3 One long Edge Discontinuous: 4 Two Adjucent Edges Discontinuous: 5 Two Short Edges Discontinuous: 6 Two Long Edges Discontinuous: 7 Three Edges Discontinuous - L 8 Three Edges Discontinuous - S 9 Four-Edges Discontinuous: SHORT SPAN COEFFICIENTS ax Case ly/lx ax -ve ax +ve 1 1 0.032 0.024
F:\USER\RAM\3990\137698677.xls.ms_office
RR/ST
4/3/2013
0.032 0.024 0.037 0.028 0.037 0.028 0.047 0.035 0 0.035 0.045 0.035 0 0.043 0.057 0.043 0 0.056 LONG SPAN COEFFICIENTS ay 1 1 0.032 0.024
F:\USER\RAM\3990\137698677.xls.ms_office
RR/ST
4/3/2013
Pt 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30 0.31 0.32 0.33 0.34 0.35 0.36 0.37 0.38 0.39 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.52 0.53 0.54 0.55 0.56 0.57 0.58 0.59 0.60
290 1.6 1.58 1.56 1.54 1.52 1.5 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.3 1.28 1.26 1.24 1.22 1.20 1.20 1.19 1.19 1.18 1.18 1.17 1.17 1.16 1.16 1.15 1.14 1.13 1.12 1.11 1.10 1.09 1.08 1.07 1.06 1.05 1.04 1.03 1.03 1.02 1.01 1.00 0.99 0.99 0.98 0.97
240 2 1.97 1.94 1.91 1.88 1.85 1.82 1.79 1.76 1.73 1.70 1.68 1.65 1.63 1.60 1.58 1.55 1.53 1.50 1.48 1.45 1.44 1.43 1.42 1.41 1.40 1.39 1.38 1.37 1.36 1.35 1.34 1.32 1.31 1.29 1.28 1.26 1.25 1.23 1.22 1.2 1.20 1.19 1.19 1.18 1.18 1.17 1.17 1.16 1.16 1.15
190 2 2 2 2 2 2 2 2 2 2 2 1.98 1.96 1.94 1.92 1.90 1.88 1.86 1.84 1.82 1.8 1.79 1.78 1.77 1.76 1.75 1.74 1.73 1.72 1.71 1.7 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.5 1.49 1.48 1.47 1.46 1.45 1.44 1.43 1.42 1.41 1.4
145 2 2 2 2 2 2 2 2 2 2 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2 2.00 1.99 1.99 1.98 1.98 1.97 1.97 1.96 1.96 1.95 1.94 1.92 1.91 1.89 1.88 1.86 1.85 1.83 1.82 1.8
120 2 2 2 2 2 2 2 2 2 2 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2
290 0.945
0.61 0.62 0.63 0.64 0.65 0.66 0.67 0.68 0.69 0.70 0.71 0.72 0.73 0.74 0.75 0.76 0.77 0.78 0.79 0.80 0.81 0.82 0.83 0.84 0.85 0.86 0.87 0.88 0.89 0.90 0.91 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12
0.97 0.97 0.96 0.96 0.96 0.96 0.96 0.95 0.95 0.95 0.95 0.94 0.94 0.93 0.93 0.92 0.92 0.91 0.91 0.9 0.90 0.89 0.89 0.89 0.89 0.88 0.88 0.88 0.87 0.87 0.87 0.87 0.86 0.86 0.86 0.86 0.86 0.85 0.85 0.85 0.85 0.85 0.84 0.84 0.84 0.84 0.84 0.83 0.83 0.83 0.83 0.83
1.15 1.14 1.14 1.13 1.13 1.12 1.12 1.11 1.11 1.1 1.10 1.09 1.09 1.08 1.08 1.07 1.07 1.06 1.06 1.05 1.05 1.04 1.04 1.04 1.04 1.03 1.03 1.03 1.02 1.02 1.02 1.02 1.01 1.01 1.01 1.01 1.01 1.00 1.00 1 1.00 1.00 0.99 0.99 0.99 0.99 0.99 0.98 0.98 0.98 0.98 0.97
1.40 1.39 1.39 1.38 1.38 1.37 1.37 1.36 1.36 1.35 1.35 1.34 1.34 1.33 1.33 1.32 1.32 1.31 1.31 1.3 1.30 1.29 1.29 1.28 1.28 1.27 1.27 1.26 1.26 1.25 1.25 1.24 1.24 1.23 1.23 1.22 1.22 1.21 1.21 1.2 1.20 1.19 1.19 1.18 1.18 1.17 1.17 1.16 1.16 1.15 1.15 1.14
1.79 1.77 1.76 1.74 1.73 1.71 1.70 1.68 1.67 1.65 1.64 1.63 1.62 1.61 1.60 1.59 1.58 1.57 1.56 1.55 1.55 1.54 1.54 1.53 1.53 1.52 1.52 1.51 1.51 1.5 1.49 1.48 1.47 1.46 1.45 1.44 1.43 1.42 1.41 1.4 1.40 1.39 1.39 1.39 1.39 1.38 1.38 1.38 1.37 1.37 1.37 1.36
2.00 1.99 1.99 1.98 1.98 1.97 1.97 1.96 1.96 1.95 1.94 1.92 1.91 1.89 1.88 1.86 1.85 1.83 1.82 1.8 1.79 1.78 1.77 1.76 1.75 1.74 1.73 1.72 1.71 1.7 1.69 1.68 1.67 1.66 1.65 1.64 1.63 1.62 1.61 1.6 1.60 1.59 1.59 1.58 1.58 1.57 1.57 1.56 1.56 1.55 1.55 1.54
1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 1.55 1.56 1.57 1.58 1.59 1.60 1.61 1.62 1.63 1.64
0.82 0.82 0.82 0.82 0.82 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.80 0.80 0.80 0.80 0.8 0.80 0.80 0.79 0.79 0.79 0.79 0.79 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.76 0.76 0.76 0.76 0.76 0.75 0.75 0.75 0.75 0.74 0.74 0.74
0.97 0.97 0.97 0.96 0.96 0.96 0.95 0.95 0.95 0.94 0.94 0.94 0.94 0.93 0.93 0.93 0.92 0.92 0.92 0.92 0.91 0.91 0.91 0.91 0.91 0.90 0.90 0.9 0.90 0.90 0.89 0.89 0.89 0.89 0.89 0.88 0.88 0.88 0.88 0.88 0.87 0.87 0.87 0.87 0.87 0.86 0.86 0.86 0.86 0.86 0.86 0.86
1.14 1.14 1.14 1.13 1.13 1.13 1.12 1.12 1.12 1.12 1.11 1.11 1.11 1.11 1.11 1.10 1.10 1.1 1.10 1.10 1.09 1.09 1.09 1.09 1.09 1.08 1.08 1.08 1.08 1.07 1.07 1.07 1.07 1.06 1.06 1.06 1.05 1.05 1.05 1.04 1.04 1.04 1.04 1.03 1.03 1.03 1.02 1.02 1.02 1.02 1.01 1.01
1.36 1.36 1.36 1.35 1.35 1.35 1.34 1.34 1.34 1.33 1.33 1.32 1.32 1.32 1.31 1.31 1.30 1.3 1.30 1.29 1.29 1.28 1.28 1.27 1.27 1.26 1.26 1.25 1.25 1.24 1.24 1.24 1.24 1.23 1.23 1.23 1.22 1.22 1.22 1.22 1.21 1.21 1.21 1.21 1.21 1.20 1.20 1.2 1.20 1.20 1.19 1.19
1.54 1.53 1.53 1.52 1.52 1.51 1.51 1.5 1.50 1.49 1.49 1.48 1.48 1.47 1.47 1.46 1.46 1.45 1.45 1.44 1.44 1.43 1.43 1.42 1.42 1.41 1.41 1.4 1.40 1.40 1.39 1.39 1.39 1.39 1.39 1.38 1.38 1.38 1.38 1.37 1.37 1.36 1.36 1.36 1.35 1.35 1.34 1.34 1.34 1.33 1.33 1.32
1.65 1.66 1.67 1.68 1.69 1.70 1.71 1.72 1.73 1.74 1.75 1.76 1.77 1.78 1.79 1.80 1.81 1.82 1.83 1.84 1.85 1.86 1.87 1.88 1.89 1.90 1.91 1.92 1.93 1.94 1.95 1.96 1.97 1.98 1.99 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16
0.74 0.73 0.73 0.73 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
0.86 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.83 0.83 0.83 0.83 0.83 0.83 0.83
1.01 1.01 1.01 1.00 1.00 1 1.00 1.00 1.00 1.00 1.00 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
1.19 1.19 1.19 1.18 1.18 1.18 1.18 1.18 1.18 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.12 1.12 1.12 1.12 1.12 1.12 1.12
1.32 1.32 1.31 1.31 1.30 1.3 1.30 1.30 1.30 1.29 1.29 1.29 1.29 1.29 1.29 1.29 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.27 1.27 1.27 1.27 1.27 1.27 1.27 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.24 1.24 1.24 1.24 1.24 1.24 1.24
2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 2.35 2.36 2.37 2.38 2.39 2.40 2.41 2.42 2.43 2.44 2.45 2.46 2.47 2.48 2.49 2.50 2.51 2.52 2.53 2.54 2.55 2.56 2.57 2.58 2.59 2.60 2.61 2.62 2.63 2.64 2.65 2.66 2.67 2.68
0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67
0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.81 0.81 0.81 0.81 0.81 0.81 0.81
0.96 0.96 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.91 0.91 0.91 0.91 0.91 0.91
1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.04
1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.16
2.69 2.70 2.71 2.72 2.73 2.74 2.75 2.76 2.77 2.78 2.79 2.80 2.81 2.82 2.83 2.84 2.85 2.86 2.87 2.88 2.89 2.90 2.91 2.92 2.93 2.94 2.95 2.96 2.97 2.98 2.99 3.00
0.67 0.67 0.67 0.67 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65
0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.8
0.91 0.91 0.91 0.91 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.88 0.88 0.88 0.88 0.88 0.88
1.04 1.04 1.04 1.04 1.04 1.04 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.00 1.00 1.00 1
1.16 1.16 1.16 1.16 1.16 1.16 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.12 1.12 1.12 1.12
0.71