Project Initiation Document (Pid) : Purpose
Project Initiation Document (Pid) : Purpose
Document Ref & Version No: ASL/CS/PID/001 Project: ASL Internet Site Date: 6th October 1996
Purpose:
This document has been produced to capture and record the basic information needed to correctly direct and manage the project. The PID addresses the following fundamental aspects of the project: What is the project aiming to achieve Why it is important to achieve the stated aims Who will be involved in managing the project and what are their roles and responsibilities How and When will the arrangements discussed in this PID be put into effect.
When approved by the Project Board this PID will provide the Baseline for the project and will become frozen. It will be referred to whenever a major decision is taken about the project and used at the conclusion of the project to measure whether the project was managed successfully and delivered an acceptable outcome for the sponsor/user/customer.
Background:
The Internet is becoming an ever more important feature of the computer/software industry. The number of people with access to the Internet is increasing exponentially as is the number of Internet sites which are being set up by companies as shop windows for their goods and services. Many of our competitors have already set up Internet sites and whilst the amount of business which can be directly attributed to that source is still quite small, this is not expected to remain the case for very long. Hence it is believed that ASL can no longer ignore the Internet as a possible source of future business and consideration should be given to establishing our own web site. On the basis of Project Brief Ref ASL/CS/PB/001 the company board has recommended the production of this Project Initiation Document as a prelude to making full and final commitment to the project.
Objectives:
The aim is to develop and launch a site on the Internet which will act, initially, as an electronic brochure for our company. This will allow prospective customers, worldwide, to review our range of products, access pricing information and e-mail us with their requirements. The target date for having the first implementation of our site up and running is 1st January 1997.
SPECIALIST PRODUCTS S.1 S.2 S.3 S.4 S.5 S.6 S.7 S.8 Functional Specification Detailed Scripts/Design Graphics Code Appointed Internet Provider Registered Domain Names Marketing Plan Amended stationery
Nb: Product Descriptions for the above Specialist Products are at Appendix A
Constraints:
An initial budget limit of 10,000 has been allocated to this project - this to include all external and internal expenditure.
Assumptions:
1) There will be no connections between the Internet and our own internal IT systems. 2) The main expenditure will on internal resource from the development department.
Main Responsibilities:
Corporate Management/Sponsor/Customer: Helen Bell
1. Authorise the start and continuation of the project from the corporate perspective 2. Set Project Tolerances 3. Set and review overall strategy and interfaces with other initiatives. Project Board Executive: Karen Rodgers
1. Ownership of the Projects Business Case 2. Overall direction and guidance for the project 3. Chair Project Board meetings and reviews 4. Set Management Stage Tolerance 5. Review Exception Reports and Exception Plans 6. Delivery of a suitable end Business Product.
Martyn Mayhew
1. Ownership of the project from a User viewpoint 2. Approval of User Specifications for technical Products 3. Attend Project Board meetings and reviews 4. Prioritise Project Issues 5. Review Exception Reports and Exception Plans
6. Recommend action on changes
Tom Goodlad
1. 2. 3. 4. 5. 6.
Ownership of the project from a Supplier viewpoint Approval of Functional Specification Attend Project Board meetings and reviews Prioritise Project Issues Review Exception Reports and Exception Plans Recommend action on changes
Project Assurance: Sid Hall 1. Business Assurance on behalf of the Executive 2. User Assurance 3. Supplier Assurance carried out by spot-check/audit of technical material and Products supplied 4. Review of Products via Quality Review
Project Manager: Janis Kitson 1. Day-to-day management of the Project 2. Planning, monitoring and control 3. Reporting progress through Highlight Reports 4. Management of Team Managers and Contracts 5. Delivery of the projects Products 6. Configuration Management, Filing and Change Management
Acceptance Criteria:
1. All Technical Products complete and signed-off 2. Site to be live tested by all members of the Project Board.
Resources:
The resources to be used are Janis Kitson (estimated 20 days effort); Sid Hall (estimated 5 days effort); Emily Barker (estimated 5 days effort). Plus, approximately 10 man.days of effort for graphics production and 40 man.days of programming. Registration of domain names costs 150 and the monthly cost of the internet provider will be 35. There follows a more detailed plan of the main activities and management stages:
Project Controls:
The project will be reviewed at significant points by the Project Board. A major review will take place to approve this PID. A further Project Board review will be conducted when the Functional Specification is completed, prior to embarkation on the Production Stage. The project will also be reviewed by the Project Board at Project Closure. Highlight Reports will be provided to Project Board members on a weekly basis. Responsibility for all day-to-day controls will rest with the Project Manager. Overall responsibility for the successful delivery of the project will rest with the Executive member of the Project Board.
Contingency Plans:
This is a low/moderate risk project and no specific contingency plans have been put into place. At the present time it is not expected that there will be many changes to the approved plans and Product Descriptions and therefore a Change Budget is not considered to be necessary.
Additional Comment:
The project is straightforward and should present few problems in bringing to a successful conclusion. As the project will span the Christmas holiday period it is likely that some schedule slippage will occur. This is not critical to the success of the project.
Customer/Users Signature:
Date:
PRODUCT DESCRIPTION
Product Title: Project: Stage: Scripts/ designs ASL Internet Site Production PBS Reference: S2 Version No: 01 Date of Issue:26/9/96 Page No: 1 Author: Janis Kitson
Purpose: To define exactly what the Internet pages should say, how they should operate and how they should look
Quality Criteria: Must be useable as working document for the production of graphics and code.
Required Completion:
Approved:
PRODUCT DESCRIPTION
Product Title: Project: Stage: Graphics ASL Internet Site Production PBS Reference: S3 Version No: 01 Date of Issue:26/9/96 Page No: 1 Author: Janis Kitson
Purpose: To provide the graphical look and feel for the whole Internet site
Composition: Scanned from existing company literature and specially produced as appropriate
Required Completion:
Approved:
PRODUCT DESCRIPTION
Product Title: Project: Stage: Code ASL Internet Site Production PBS Reference: S4 Version No: 01 Date of Issue:26/9/96 Page No: 1 Author: Janis Kitson
Purpose: To combine the graphics, text and logical elements on screen to provide a working set of Internet pages
Quality Criteria: Must work reliable and consistently with no fatal errors
Required Completion:
Approved:
Ref:
ASL/CS/RL001
Project: ASL Internet Site
Date 23/9/96
Log Ref:
Reference 0010 0011 0012 0013 0014 0015 0020 0021 0022 0023 0024 0025 0030 0031 0032 0033 0034 0035 0040 0041 0042 0043 0044 0045 0050 0051 0052 0053 0054 0055 0060 0061 0062 0063 0064 0065
Date 20/9/96
Latest Score
20/9/96
0.2
22/9/99
0.4
22/9/99
0.1
23/9/99
1.0
Document Ref: ASL/CS/QP01 Version: 1 Project: ASL Internet Site Date: 23/9/96
Purpose: This document has been produced to define how the Supplier intends to deliver Products that meet the Customers Quality and the Suppliers Quality Standards. The Project Quality Plan establishes the quality regime that will apply to the project.
Responsibilities: Quality Review Chair: This role runs the Quality Review procedure. This is a separate role from that of the Executive who chairs the Project Board. Selection of QR Chairs will be made during the planning for each Management Stage. Main Responsibilities: Ensure that the Quality Review is properly organised; Agree the Agenda; Check the Product is ready for Quality Review; Control the QR Procedure and chair the QR Review meeting; Ensure that the Quality Review does not stray from its main aims; Ensure that actions and required results are agreed; Together with the Reviewers, determine the Quality Review Outcome; Keep the Team Manager(s) aware of the status of the Quality Reviews; Provide final sign-off; Raise Project Issues via the Team Manager where problems with the Product cannot be satisfactorily resolved.
Quality Reviewer: This role provides an independent and objective view of the Product and measures the Product against its agreed Quality Criteria.
Main Responsibilities: Prepare for the Quality Review; Assess the Product against the Quality Criteria specified in the Product Description; Ensure that errors are fully understood by the Producer and are subsequently resolved satisfactorily; Sign off appropriate Follow-up Action List items.
Team Manager(s): This role is responsible for the professional delivery of a specific Product that meets its stated Quality Criteria.
Main Responsibilities: Plan Quality Reviews in detail; Identify Quality Review resources;
Monitor Quality Review progress against the plan; Report progress to the Project Manager.
Project Manager: This role is responsible for the creation and delivery of Products, to the Project Board, meeting the agreed Management Stage Plan.
Main Responsibilities: Plan the Quality Reviews in outline; Plan to overcome any identified Project Issues raised as a result of Quality Review; Act as a Quality Reviewer where appropriate.
Quality Manager & Project Assurance Roles: These roles ensure that the Project Management and Quality Management Standards set for the project are adhered to.
Main Responsibilities: Check that the Quality Reviews are being properly constituted; Advise on suitable Quality Reviewers for each QR; Check that everyone involved in the Quality Review process is aware of their responsibilities and that adequate training has been given; Ensure that the QR procedure is being properly followed; Check that Quality Reviewers are being correctly selected, and that they are briefed for the work; Check that Follow-up actions are being properly monitored; Log and report on Corporate Standards and advise on improvements and amendments; Act as Quality Reviewers where appropriate.
Corporate Management & The Project Board: These roles have overall responsibility for the success of the project outcome and its effective management. Quality aspects are important in achieving the required results.
Main Responsibilities: Set the Quality Policy for the Organisation and the Project; Ensure Quality Standards are adhered to (via Project and Quality Assurance;
Project Support: This role (where provided) will carry out administrative support for Quality Reviews.
Main Responsibilities: Assist the QR Chair to organise a QR venue, prepare and distribute the QR documentation; Act as a Scribe at the Quality Review; Progress-chase the Follow-up Actions list; Act as a Quality Reviewer where appropriate.
Standards to be met:
All material produced must conform to the specification and quality criteria stated for them. Standards for creation, development and maintenance will be agreed before work commences.
Key Product Quality Criteria Specific Quality Criteria will be incorporated into the Product Description for each Product. Generic criteria are that all Products must have a consistent presentation. Products will be used by individuals when preparing for courses and exams so they must have at least a three month lifespan.
Quality Control & Audit Processes (Project Management & Specialist Work):
All proposed changes must be recorded, analysed and passed to the Project Manager for a decision. Major changes will be referred to the Project Board for decision.
Configuration Management Plan:
Tracking and proper storage of the Products must be straightforward and easy to manage. A simple pc-based CM method will be used.
Software Tools to be Used:
Support software will be developed using Mediator. Paintshop Pro, MS Word, Powerpoint and Excel will also be used in the creation of the projects products.
Customer/Users Signature:
Date: